2021-07-12 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 12 JULY 2021
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Jurisevic
That Council note the report by the Project Officer to the Services & Organisation
Committee Meeting dated 6 July 2021 and:
A. Note the submissions received during the community consultation on the draft
Noosa Cycling & Walking Strategy and Implementation Plan, provided in
Attachment 1 to the report;
B. Adopt the final Noosa Cycling and Walking Strategy and Implementation Plan,
provided in Attachment 2 to the report with the following amendments:
1. On page 38 of the Plan, change the infographic to read:
“$1.45m per annum over the next 10-years estimated to be spent on bike
riding and walking infrastructure in Noosa Shire, in addition to external grant
funding”
2. Under Future Projects on page 39, delete the website link to
yoursay.noosa.qld.gov.au and replace with www.noosa.qld.gov.au/cycling-
walking-strategy
C. On page 23 of the Plan, change Task 2.3 to read:
2.3 Investigate opportunities to enhance or add end-of-trip facilities in key centres
and tourist hubs. Implement a prioritised program for upgrading of existing public
facilities (eg public toilets with showers) and the construction of new end-of-trip
facilities, including electric charging stations and lockers as well as surfboard racks
at designated beachside locations (with the latter being considered as a short term
priority issue). Investigate opportunities to partner or incentivise private sector to
develop end-of-trip facilities for their workforce at key locations.
Carried unanimously.
6 REPORTS DIRECT TO GENERAL COMMITTEE
Report 6 was considered earlier in the meeting.
7 T000042 – TEWANTIN BYPASS STAGE 1 – WATERMAIN RELOCATION
Committee Recommendation
Moved: Cr Jurisevic
Seconded: Cr Wilkie
That Council note the report by the Designer Capital Works to the General Committee
Meeting dated 12 July 2021 and
A. Award Contract T000042 for the construction of the Tewantin Bypass Stage 1 –
Watermain Relocation works to M&K Pipelines Pty Ltd for the lump sum price of
$554,795 excluding GST;
B. Approve expenditure under this Contract up to $767,480 excluding GST, including
contingency spend.
Carried unanimously.
Page 10 of 12