Electrical Reticulation Plan 24615 S3100661 RevA

of 1

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                        C




                                                                                                                                                                                                                        CONDUIT CROSS SECTIONS
                                                                                                                                                                                                                       ALL CONDUIT INSTALLATION TO COMPLY WITH ENERGEX
                                                                                                                                                                                                                       UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL -
                                                                                                                                                                                                                             REFER SECTION C2, 2.1 FOR DIMENSIONS

                                                                                                                                                                                                   TRENCHING ACROSS FOOTPATH FOR ALL NEW STREETLIGHTS TO BE TRENCH DETAIL
                                                                                                                                                                                                               'O' (FROM BOUNDARY ALIGNMENT TO BACK OF KERB).
                                                                                                                                                                                                                                                         LEGEND
                                                                                                                                                                                                                                                         HV CONDUIT 125mm
                                                                                                                                                                                                                                                         (ORANGE LIGHT DUTY TO AS2053)

                                                                                                                                                                                                                                                         LV CONDUIT 100mm
                                                                                                                                                                                                                                                         (ORANGE LIGHT DUTY TO AS/NZS 2053 - FOOTPATHS)
                                                                                                                                                                                                                                                         (ORANGE LIGHT DUTY TO AS/NZS 2053
                                                                                                                                                                                                                                                          - ROAD CROSSINGS, WITH HARD COVER)

                                                                                                                                                                                                                                                    EC    COMMUNICATIONS CONDUIT 100mm
                                                                                                                                                                                                                  EC
                                                                                                                                                                                                                                                          (WHITE MEDIUM DUTY TO AS2053 & 1345)

                                                                                                                                                                                                                                                   PL
                                                                                                                                                                                                                                     DETAIL D            50mm PUBLIC LIGHTING CONDUIT
                                                                                                                                                                                                                                                         (ORANGE HEAVY DUTY TO AS2053)
                                                                                                                                                                                                             DETAIL N




                                                                                                                                        PROPOSED COMMISSIONING PLAN
                                                                                                                                         Proposed only and subject to alteration by Energex.
                                                                                                                                                   LV SWITCHING SHEET ONLY:
                                                                                                                                         1.   OPEN LV SWITCHES (FS1) AT SP4870.
                                                                                                                                         2.   INSTALL LV UG NETWORKS AS PROPOSED, DO
                                                                                                                                              NOT CONNECT NEW 240 AL 4C XLPE-PVC CABLE
                                                                                                                                              TO EXISTING 240 AL 4C XLPE-PVC AT U12650498
                                                                                                                                                                                               ·
                                                                                                                                              (STN 2), MAINTAIN EQL SPECIFIED SAFE             ·
                                                                                                                                                                                               ·
                                                                                                                                              APPROACH DISTANCES TO UG NETWORK WHILE
                                                                                                                                                                                               ·
                                                                                                                                              WORKING.                                         ·
                                                                                                                                                                                               ·
                                                                                                                                         3.   CHECK OPEN POINTS AT U1489418 AND P23134.
                                                                                                                                         4.   CONNECT NEW 240 AL 4C XLPE-PVC TO EXISTING
                                                                                                                                              240 AL 4C XLPE-PVC AT U12650498 (STN 2) AND
                                                                                                                                              EXISTING 240 AL 4C XLPE-PVC AT U1325092.
                                                                                                                                         5.   CONDUCT PRIOR CLOSING TESTS.
                                                                                                                                         6.   CLOSE LV SWITCHES (FS1) AT SP4870
                                                                                                                                         7.   TEST AND COMMISSION
                                                                                                                                         8.   CONDUCT POST COMMISSIONING CHECKS
                                                                                                                                              Where interruptions are proposed, customers
                                                                                                                                              shall be notified as per Energex requirements.




                                                                                                                                                                                                                                   WHILE IT IS STRIVED TO ENSURE ACCURACY OF
                                                                                                                                                                                                                                   INFORMATION LISTED, ANY SITE SURVEY FIELD WORK IS
                                                                                                                                                                                                                                   SOLELY BASED OFF ACCURACY OF ANY INFORMATION
                                                                                                                                                                                                                                   PROVIDED AT THE TIME, IT IS A VISUAL INSPECTION &
                                                                                                                                                                                                                                   ASSESSMENT OF ABOVE GROUND NETWORK ASSETS
                                                                                                                                                                                                                                   ONLY WHICH EXCLUDES ANY ELECTRICAL TESTING,
                                                                                                                                                                                                                                   EXCAVATION FOR THE VALIDATION OF NETWORK
                                                                                                                                                                                                                                   INTEGRITY.




                                               24615
                                                                                                                                                         Lionel Ferris
                                                                                                                                                         RPEQ 05938
                                                                                                                                                         2025.07.04
                                                                                                                                                         17:35:42+10'00'




ABN 12 115 160 748
Phone (07) 5479 1368
E-mail: [email protected]         PO Box 807
Website: www.millwell.com.au    Maroochydore QLD 4558   ©   This design and drawing is copyright and is not to be used or reproduced
                                                            wholly or in part without written permission of Millwell Services Pty Ltd
Log in to download the original file

Electrical Reticulation Plan 24615 S3100661 RevA.pdf · 662 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.