Original source · versioned page text
Attachment 2A - UNIT DRAWINGS
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 20/06/22 CONSULTANTS REVIEW ZT
VIEW 01
UNIT 3
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
BOAQ 4487
BUILDING DESIGNERS
ASSOCIATION
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
C:\Users\z.thorp\Documents\Revit User Files\AP210910-S01_REVISED_z.thorp.rvt
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
PERMISSION OF ASPECT .
PROJECT
RACV NOOSA RESORT - ECO
VIEW 02 RESORT
UNIT 3 FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
CONCEPT DESIGN
@
PROJECT ADDRESS
DRAWING TITLE
20/06/2022 4:06:25 PM
PERSPECTIVES
DATE SCALE @ A1 DRAWN CHECKED
20/06/22 AS TB
DRAWING No. ISSUE
21-0910_ A90-01 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.