Council archive · source document
07/0567 - MCU - Multiple Housing Type 2 Duplex [As Published] · 132007.567
NreLeR Ge Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1. APPLICATION FORMS
1.1. Form PartA
4.1.1 Ensure that the form is fully completed. wv
1.1.2 in the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multipte owners, the consent of each owner is required.
1.1.2.2 if the owner of the iand is a company, either ACN No. or Company Seal required.
1.2. Form’ Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [YH]
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed.
2. REFERRAL INFORMATION
2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals.
3. ENVIRONMENTALLY RELEVANT ACTIVITIES”
3.1. Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
4. FORM 2 - REQUEST TO CHANGE APPROVAL
4.1 — Ensure that items 1-28 have been checked and/or completed including information regarding [t]
applicant details and owners consent.
5. PLANS
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationai
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6. SUPPORTINGINFORMATION ~~ “ ce te
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration _
and Operational Works). if the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
Pe < ~ mee nae som
7. FEE 4 - ome a:
7A Ensure that the application fee, as determined from the Councit’ s adopted scale of fees,
accompanies the application or has been paid. v
7.2 Ensure that the fee which has been paid is recorded on the application form. M1
Receiving Officer Date ... PA at
Having completed this form and accepted the afoighton, please deliver both to the following [DAS Application Receiving
trays:-
« Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
¢ — Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.
« Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Section.
¢ Inail other circumstances —- AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 32 pages
Page 2
INTEGRATED PLANNING ACT 1897 : , Part A, Vession 2.4, 29 May 2006
Form 1 Development Application
The completion of afl appficable question: s on Part A is mandatory for all appfications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.aid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 4.
Description of land 1. Street address: (ncludinghouse number, street name, suburb/locality name & postcode) (if appficable)
Alltand the subject of the application, must be ts
ned Howove, a desepon often 0 [Z3/EDSARD S- NO OS AV | 1 4566 |
Fate at ee. [2 Name of water body or watercourse, within which the development is proposed: (if applicable)
Avice for completing Q2 - 02 applies i [ _|
development is proposed within a water body or
watecourse. 3. Loton plan description (eg. Lot 123. on RP 4967)/ GPS coordinates:
Advice for completing Q3 - Most land can be r
iertied by atoton plan description. These detas [GRove THLE PAN No.49'2 (O42) PARISH TEEN TIN couMTY ]
Gane cing om le documents rowan 2 | The dove description is for: (tek applicable box) Mao
However, ifthe land on which the development is (i) the land.on which the development is proposed; or
FE a ioe fe (qi) the tand adjoining the water body or watercourse, within which the development is
* watercourse) provide proposed; or
0 ae ee the Ciiili) the water body or watercourse. : ,
id SS es ee ‘ean Noveton Bay), 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m® or ha):
Advice for completing Q7 - ’
et a eyo errs { hye _| L Zz ] | (AES
i Ne erent aa 18. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable}
Note: Aroas below high water mark within PARISH MOOG MK ARCH
Jocal government's me vmess een under the Ae - COST mM |
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing Q9 -
development is on strategic port land or a strategic
port tand tidal area, For more details refer to Guide 14 |
3 applies it development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
Proposal details . 10. Existing use of the land: (eg. vacant, single house, shop efc.)
Hf there is insufficient ilable, details be
Santana be pion [aasvusc. DU PLEX . : |
11. Proposed use of the land: (eg. 6 uni apartment building, 30 fot residential subdivision, ERA for aquacufture in
ponds with @ total area of 7 ha for which wastes are released into waters etc).
[NEL 2 areca DOPLEXx |
Other applicable parts of Form 4 142. Other parts of Form 1 completed as part of this application: (eg. Part 0, Part J, etc)
Part A must afways be accompanied by other [ 7
completed parts of Form 1. For Information about
when a part of Form 1 may apply refer to Guide 1
Applicant details 13. Applicant's name: : 15. Contact person:. °
dat dently whos man he spieton. The JOM Wenrze2— |] [eno KAY MACweNIE
_ When signing and lodging this appitcation 14. Contact number: 16. Facsimile number/e-mail address:
cee erat Tre seneonent [ o7s4448489 J Le7sa4ri 74 |
manager, any referral agency & the Chief Executive
{whore apotcabe) wil rely on Gis informaion when 17. Postal address:
a ig be ein [1/23 EResAD ST, MOPSAMILLE . d4ISGG |
must be shown, 18. Signature; — 19. Date: .
Le RS [23-37 __]
Page 3
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
Land owner's consent (if applicable} 20. Land owner's consent to the making of this application:
Section 3.2.1(3} of the IPA prescribes that an
application must contain, or be supported by, the
Name : Signature Date
writen consent of the tand owners, if the application
Bes owedise © Torby Weaw
{i reconfiguration of a lot,
{fi) work on band below high-water mark & not within 2 (i) | |
canal as defined under the Coastal Protection and pete ee ce cee ence een nee eee eee eee ee
Act 1995;0r es
{iv}- work on rail corridor land defined under the di)
Transport Infrastructure Act 1994.
Section 3.8.1(2)(a) of the IPA provides that a
{andowner's consent is not required for a mobile or (iv)
temporaryERA, | freee ener eee ence enn n nr serene cree ere epeccs ser ec cece
For more information refer to Guide 1. (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of Foe ee mene
resource entijement be given for applications that
involve a prescribed State resource. 1 - go to O24 (YES - gote a22
Section 3.2.1(10}{a)(i) of the IPA prescribes that an
ae eeen cur ee tearta te popaty made | 22. This application is accompanied by evidence: (tick anpicable box)
without evidence of the resource entitlement.
Liq) of the allocation of, or entitlement to, the resource ~ attach evidence and go to Q23{vi)
Advice for completing Q21 & 22 i . . wg . .
Refer to schedule 10 of the integrated Planning - CA (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1999 that prescribes the nature of evidence development is consistent with an allocation of, or entitlement to, the resource — go
required by the State in support of the lodging of this fo 023
development application.
entitlement to, the resource — go fo Q23
Edvice for completing 023 23. Evidence of the resource entitlement.
The information in (i) - (v) is mandatory if evidence is
0 (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
required under 022 (8) or Gi) above. ~ (i) Resource entitlement / authority details (vii) Official stamp of the department @
The official stamp of the Depariment of Natural administering the resource (if
Resources, Mines and Water is mandatory where the . applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
elas ara Cd
Section 32.158) slows the a A Oe
time the evidence may be used. i) must be i iti
Oe et ed (vi) mus (ii) Position of — Officer
(iv) Signature of delegated officer
{v) Date :
(vi) iry date of evidence (fapplicabie)
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
eee oe ee ittonen tT S oO NO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made
. Plans / drawings / reports 25. Plans/drawings/reports accompanying this application: @
pines opie tendie ie exesorant on 1 Report Number Title Date
manager, referral agencies and any person viewing
the application during public scrutiny or pubic
notification to understand the scope of the proposal
and any potential impact.
PLEASE NOTE: The assessment manager may sefuse to accept an application thal, at the time of lodgement, falls to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (enplicable fo assessment manager's)
DATE . RECEIVING OFFICER'S
FE G) RECEIVED NAMES
Notification of Engagement of Private Certifier (Optional format)
To, : - Council. | have been engaged as the private certifier for the bi
Date ofengagement / / Accreditation Number: _— Name:
uiiding work referred to in this application.
Signature:
Page 4
28/83/2087 04:28 6754471714 K J CONSTRUCTIONS ° PAGE 01/01
~ATIN: TRISH
: _NTEGRATED PLANING ACT 1807 Post A. Varsioh 24, 29 Mey 2006
Land ownéra consent (fenpicabie) = 20. Ler cent ie matin ot pt . : :
Se ter me
siden consent ft fared comics He BepACAON
ee eSoy. (Mewrer.. Ac
9 amt charge ox, .
{F) .recentfiguraton of:
@ Te pot hafta otc not witn 9
° Gaol 66 dalined under the Coastal Protection and |.
‘Managespent ,
Act 19% .
i - work 00 fall caridor lend dafined under the”
Transport inimedructsre Act 1294, .
Section 3.3.1(2}2) of the (PA provides that
: Iendowner’s consent is net required for 9 mobile of.
tempormy EBA.
For mora knormaton referto Guide 1,”
Oke WncacenIl +
Resource entitlement (ff applicable) -
~ Sect 42.19 fe PA red eine of
regdurce enfiterent be given for appicstons fat
involve a proxaitbed Stale revauree. oo
Secon 3.21106) okt IPA pres fete.
“application caret be propenty meds «
bern er apeey
\ Aiifics for cbergisfing Q2t &.22”
Rafor to schottua 10 of the fategrated Phanning..
clef Bn aoa Pg
»Regutation
required ty tho State In suppairt ofthe logy of ths .
appicion, .
development
etvce toe sommokaina 2a
7 pegged uieider O22 Gi) oF. (i) above.
‘The officit star of tho Dearie of Natural
. Resources, Mines ano Water ts mandatiry whrara (ve .
nvolwss any.wobor ot vorine quarry
ipatestal endec the Water Act 2000,
Sten 321154 fs the resourea manager Bn :
«the time the avidanoe may be used: 2 O73 jmp rust be
21. cast gpa Se cald pumaibd under areufaion (aber an rohg
"Se eemrananvanceee
-gowOs. CVYES-gowaz
2. Thig application is eccompanied by evidence: (tick applicable box) :
EO of the allocation cf, or enfement to, the resource - attach evidence ern go to O23(H),
‘ow the chief executive of the dapartshent administering the resource fs satisfied the -
_ development is. ls. consistent with an. allocation of, oF “enfitfement to, the resource ~ 9”
wo2 | ;
OW be chi exe oe eprint anni heroes Be
development application abs OF,
etifitement fo, te-resource - peat Te, . .
. ’ 23, " Evidenoa ofthe resource ertitiement
«The information in {) = {i manda i oncos :
() Resouroa entitlement / author details |v) otical stan of the deparment
cusenteeniamaseee — (Ogg vere
cool oer Orn tid,
Assessment triggers oh iste 5 Assessment Checist completed and attactied to this application? .
Ts oes Bat Arey ithe ony “S$ . DNo- the assessment manoger may refuse fo occept Gilt apaicatonr on the .
_Rempeingiae aetaatenaa we _roures the th eppiicaton has no been property made -
"plans / drawings! reporta 25.. Pianlravingareports aocompanying tls application:
seegearearmccee | [ _ravimiemetnoee |
[GOA (PDR Tale... ley
PLEASE NOTE: The assessment manager may refuse to accept an application that atthe time of fodgemert, fails.to provide all anpteabl intonation rere by Pan A
and any other relevant partof Form 1.”
OFFICE USE ONLY (appt essszmont spars)
= 2570 | steno
To.
etalon of Engagement of Private Certifler (Optonat fomnsy_/
[nate rl Aetiedtatior Number a “Nama: : “__ Signature:
"P22. "ee area)
Counei Ihave been engaged 3 whe private oertinar for the building work refered to in this application.
Page 5
Es
INTEGRATED PLANNING ACT 1997 , Patt D, Version 2.0, 4 October 2004
| AS Form 1 Development px)
yy
Material change of use
assessable against a local government's planning scheme
plication
TT ar
A development permit authorises *
development to occur, while a preliminary ‘design acters ste fed that requ rez the Fe anni ngs cher ta
{approval is astep in the approval process - _
Fand doessiat ‘authorise devetopmentto occur.) 38 “eta f epee concert) 5°
oe OE hie
cet |). g.4degign for any associated works that require approval under the planning scheme, 3
\The Subj land}.
[eb canio poker ar,
seems ge
appli
BoE SPE,
x2
“CFL TS NEL HLS (WC. PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (epcae to ascassret manager
3 y REFERENCE ~
_DATERECEVED | [NUMBERS =:
Page 6
A we Oe FUE,
»
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 19.0, 2 March 2007
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
4. This checklist was formerly referred to as the “Referrals Checklist”. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
"Referrals Checklist”. The name of this checklist was changed from 25 July 2005 to more accurately describe its function,
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.),
3, This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager" for the application.
4. Therefore, the completion of all questions in section 4 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B onty).
5. this the responsibility of the applicant to accurately complete this checklist.
6. Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005,
7
8.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
. The assessment manager for the application will rely on the information provided in this checklist (as wel! as any material lodged in support of the application) to identify
e any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
9. Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qld.gov.au. Guide 25 explains the role of the DAS.
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10, Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
ww. ipa.qid.gov.au.
11. Section 3 provides advice about the referrats that can be required for applications for building work assessable against the Building Regulation 2006.
‘ 3 _ , SECTION 1 - STATE ASSESSMENT (completion mandatory) .. ; i
Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006. i
Environmentally relevant activity 1, The application involves: (lick applicable box/es)
For more Information refer to Guided. (1 (i) an environmentally retevant activity (ERA) for which a code for environmental compliance
tha apetoation regues assessment by he, oe has not been made - complete Part G of Form 1
administering quthority?. . LO Gi) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering made - complete Part G of Form 1
authority, is the assessmeft manager for the Ol (iti) none of the above
application, the administering authority is a
concurrence agency for the application in relation
to this matter.
Note; An application involving ERA 19 and/or 20
@ wil also require completion of Part Ky of Form 1
for approval where an allocation under the Water|
Act 2000 is required.
28 MAR 2uUU/ | “Continued overleaf
2 NOOSA SHIRE COUNCHL Lo
FRONT COUNTER aL
&o s
8 L
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
RECEIVED \F
OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED | REFERENCE NUMBER/S
1 The assessment manager is responsible for assessing and deciding an (DAS application, The assessment manager for an appiication is prescribed in schedute 8A of the IPA.
2. For additional information refer to Guide 6 ‘Does my application tigger the referral coordination process?’
2. The ‘administering authority’ may be elther the Environmental Protection Agency, the relevant tocal govemmment (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a detegated ERA).
Page 1
Page 7
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 19.0, 2 March 2007
State-controlled road matters -
For mare information refer to Guide 3.
Unless you answered ‘none of the above’ to Q2,
the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.
In certain circumstances DMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency. .
_ Schedule 2 of ihe IP Regulation will assist you to
determine where OMR is an advice or
concurrence agency for the application.
2. The application involves: (tick applicable box/es)
C1) development on land contiguous* to a State controlled road and for -
im {a) material change of use assessable against the planning scheme;
1 (b) reconfiguring a fot unless -
, « the total number of lots is not increased; and
+ the total number of lots abutting the State-controlled road is not increased;
2 ©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)
+ associated with access to a State-controlled road; or
¢ for filling or excavation; or .
+ involving the redirection or intensification of site stormwater from the tand, through a
° pipe with a cross-sectional area greater than 625 cm: that directs stormwater to a
te State-controlled road.
VEG development on land not contiguous to a State-controlled road and -
Vv (a) material change of use — .
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
us) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
Oo operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
s assessable against the local government's planning scheme; and
» mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule. .
i) none of the above
¥
@
/
Clearing vegetation
For more information refer to Guide 12.
Unless you answered “none of the above" to Q3,
the application requires assessment by the
Department of Natural Resources and Water
(NRW),
If an agency other than NRW is the assessment
manager tor the application, NRW is a
-concurrence agency for the application in relation
to this matter.
If you ticked Q3(i} or (ii), your application requires|
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not
3. The application involves: (tick applicable boxes)
(1 (i) material change of use -
{a) assessable against the planning scheme;
(b) on a lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
+ if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d)_ where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot - :
(a) on alot containing a category 1, 2 or 3 area shown ona property map of
~+ assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger,
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 4
Di) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
/ Formt —
FI (iv) none of the above.
Uti)
Strategic port land
For more information refer to Guide 14.
tf you ticked {i} - the relevant Port Aulhority is the
assessment manager for the application.
If you ticked (ii) Queensland Transport is a
concurrence agency for the application.
4. The application involves:
(1 (i) development on Strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part f of Form 1
C0 (i) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part f of Form t
[ATi none of the above
4 Land contiguous lo a State-contolied road Is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the Stata-controied road; or that is part of a future Staie-
controlled road.
Page 2
Page 8
re
” Water related development under the
INTEGRATED PLANNING ACT 1997
Acid sulfate soils
For more information refer to Guide. 10,
Unless you answered "none of the above’ ta 05,
the application requires assessment by
Department of Natural Resources and Water
(NRW),
It.an agency other than NRWis the assessment
_ Tanager for the. application, NRW is an advice
“agency for the application ir in relation to this
, Matter. ~
IDAS Assessment Checklist, Version 19.0, 2 March 2007
The application involves development on land situated in an identified* local government area
and where the surface of the land is: (tick appicable box)
(4) ())_ below 20m AHDS and the development will involve the excavation of 100m? or more of
soil or sediment at or below 5m AHD, or
O (i) at or below 5m AHD and the development will involve filling the site wath 1000m? or more
of material
(iii) none of the above
Major hazard facilities or possible
Major hazard facilities ;
For mora information refer to Guide 17.
It your answered "YES" to Q6, the application
fequires assessment by the Department of
Ememmency Services (DES).
it an agency other than DES is the assessment
manager for the application, DES Is a -
concurrence agency for the application in
relation to this matter.
- Water Act 2000
For mare information about items (a) — (f), refer
to Guide 15. For more information about item
5 (g), refer to Guide 14 Does m) ication -
it asse: ofa referable dam’
nlaés you answered “none of the above" to Q7,
the application requires assessment by the
Oepartment of Natural Resources and Water
(NRW). -
if an agency other han NRW Is the assessment
manager for the application, NRW Is &
concurrence agency for ihe applicatién in
relation to this matter.
Does the application involve a material change of use for a major hazard facity or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
0
(DYES - compiete Part £ of Form i
The application involves:
[LD Q) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es) .
C (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Ko, Ks; Ks, Ks, or K of Form 1 whichever is applicable,
‘J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ke oF Form 1; , /
(1 () for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
USE - complete Part K; of Form 1;
(J (@) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K+ of Form 1;
{1 (e) for taking overland flow water in certain areas covered by a water resource plan
~ complete Part Ks of Form 1;
(1 (for interfering with overland flow water in a drainage and embankment area -
complete Part Ks of Form 1
(1 @Q) for constructing a referable dam? or works that will increase the storage capacity
of areferable dam by more than 10% - complote Part Ks of Form’t; or
ah none of the above.
Removal of quarry material from a
watercourse
For more information refer to Guide 16.
(f you answered "YES" to Q8, the application
fequires assessment by the Department of
Natural Resources and Water (NRW).
if an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
Note: Part G of Form 1 is required to be -
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Retevant Activity (ERA).
Does the application involve development for the removal of quarry material from a watercourse®
Tequiring an allocation notice under the Wafer Act 2000?
77 N
Oo
(J YES - complete Parts Kr and G af Form 4
§ The identified focal gavemment areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Calms, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, tsls, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirlum Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Tomes, Townsvilie, Whitsunday.
Austrafian Height Datum (AHD).
COIs
Watercourse Is defined in sch 10 of the IPA.
The declared ground water areas are listed in Guide’ 13 Development in a declared catchment area.
Referable dam is defined under the Water Act 2000.
Page 3
Page 9
INTEGRATED PLANNING ACT 1997 : IDAS Assessment Checklist, Version 19.0, 2 March 2007
Operational work that is tidal work or {9. The application involves operational work that is: ( tick the applicable boxes)
work in coastal management district my ge . .
For more information refer to Guide 18. For (1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
mare information about prescribed fidal work in Coastal Act) that is not prescrived tidal work - complete Part M of Form 1; OF.
local government tiga areas refer to Guide 24 LD (ii) tidal work that is prescribed tidal work" other than in a canal"? -complete Part P of Form 1; 0r
ne ophaien een ete? 08. Di fii) carried out within a coastal management district under the Coastal Act and for - complete
Environmentat Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (j) below are ticked.
If an agency other than EPA is the assessment (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
a ee ecenin other than those works in tidal water) where the development has been determined not
relation to this matter. to be assessable against the Water Act 2000 ;
Local government is the assessment manager : (1 (b) constructing a canal? intended to be connected to tidal waters;
i prescribed tidal work. a “es
{or €l presea : ™ LC (©) constructing an artificial waterway:
(1) reclaiming land under tidal water; .
Le) disposing of dredge spoil or other solid waste material in tidal water,
1 (f) interfering with quarry material on State coastal land above high-water mark;
(1g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
[(h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(7) (i) constructing a bank or bund wall to establish a ponded pasiure on land, other
we than State coastal land, above high-water mark; or ‘
(i
iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable boxes)
, re rm information eter to Guide 18, For (1 (i) tidal work's as defined under the Coastal Protection and Management Act 1995 (the
moe information about prescribed fidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
local government tidal areas refer onrnad (71 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; oF
Unle: answered “none of the above” to pon . wae ge
10, the application riggers referral io C (ii) carried out within a coastal management district'S under the Coastal Act and for -
Queensiand Transport (QT) (Marilme Safety [1 {@) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Qig) as a concurrence agency. .
Local government Is the assessment manager M of Form t “ .
for all prescribed tidal work. (1) (b) reclaiming land under tidal water - complete Part M of Form nor *
CI) constructing a canal", if the canal is associated with reconfiguring a lot - compiete
Part M of Form 1; ~ -
iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more information refer to Guide 18. C(i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above” to work carried out completely or partly in a coastal management district'5_-
Q11, the application requires assessment by the . . - 7 . ~ a
Environmental Protection Agency (EPA). Ci (i) a material change of use assessable under a planning scheme involving building
{fan agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is. -
manager for the apptication, EPA is a
concurrence agency for the application in + the construction of a new premises with a GFA'® of at least 1000m?_ ><
‘elation to this matter. « the enlargement of the GFA of existing premises by more than 1000m2 a
completely or partly in a coastal management district x
C1 (iv) reconfiguring a jot’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal'? - complete Part M of Form 1 °y¢
aw none of the above
LD (ii) reconfiguring a tot assessable under schedule 8 of the IPA where the land is situated e@
10 Tidal work is defined In sch 10 of the IPA. : :
11 Prescribed tidal work is defined in the Coasta! Protection and ‘Management Regulation 2003 and includes certain tidal works completety or partly within a local government tidal area.
12 Canat means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district Is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} of that Act. . . :
16 GFA is defined in sch 14 of the IPA t mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is belag assessed.
17 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is assoctated with the construction of an artificial waterway, must be
accompanied by the applicaton for the operational works fo construct the artificial waterway.
Page 4
Page 10
INTEGRATED PLANNING ACT 1997 Development within the limits of'a port For more information refer to Guide 18. For information about prescribed tidal work refer to Guide 24. ifyou answered “YES to Q12, the application tiggers referral to the Port Authority. + "The Pork Authority is @ condurence agency if the development is~ ¢ within 200m of a shipping channel of an entry and exit shipping corridor for the port © within 1000m of a swing basin, a commercial shipping wharf, a mooring, anchorage oF spoil grounds; .. © within 4000m ofa planned port tacitly ‘identified in a land use plan approved under thé Transport infrastructure Act 1994. In alf other situation the Part Authority é isan advice agency. 12. IDAS Assessment Checklist, Version 19.0, 2 March 2007 Does the application involve development below high water mark'® and within the limits of a port under the Transport Infrastructure Act 1994? ~ . fio. (YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work Marinas * For mote ifforrhation refer to Guide 18. For information bout whether a marina is prescribed tidal work refer-to Guide 24. The local~ goverment is the assessment manager for al prescribed tidal work, - If you-answered “YES" to 013, the application triggers referral to Queensland Fire and Rescue 13. Does the application involve operational work that is tidal work for a marina‘? with more than 6 vessel berths? fan (11 YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work For more Information, including a list of the declared catchment areas within Queenstand, tefer to Guide 43. ‘Untess you answered “none of the above” to 016, the application requires assessment by the Depariment of Natural Resources and Waler NRW). If an agency other than NRW is the assessment manager for the application, NRW is a concurrence agency for the apptication in relation to this matter. , Service as an advice agency. . . . . | ’ Tidal works in strategic port land tidal! 14. Does the application involve tidal works within a strategic port land tidal area2°? areas [aio For more information refer to Guide 18. o YES - complete Part M of Form 1 Unless you answered “NO” to 014, the retevani . Port Authority is the assessment manager for the application and the Environmentaj Protection Agency (EPA) and Queensland Transport (QT} are concurrence agencies for the application. | Heritage 15. Does the application involve development in a heritage registered place as defined under the For further information refer to Guide 19. Queensland Heritage Act 1992? if you answered “YES” to 015, the appfication triggers referral to the Queensland Heritage Lao Council as concurrence agency for he (YES - complete Part C of Form 1 application. Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and involves: (tick the applicable box/es) (1) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares; LJ Gi) development assessable against the planning scheme involving the establishment or expansion of a waste water disposal system, other than a disposal system for carrying out an environmentally relevant activity under the Environmental Protection Act 1994; [AHTili) none of the above 18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide. 19 Marina ls defined In the Transport Operations (Maritime Pollution} Regulation 1995. 20 Strategic port tand tidat areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page 5
Page 11
INTEGRATED PLANNING ACT 1997
Contaminated land
Applications involving material change of use
and/ or reconfiguring a lot may tigger this
teferrat.
For more information refer to Guide 5.
Unless you answered “none of the above" to
Q17, the application requires assessment by the
Environmentat Protection Agency (EPA). if an
agency alher than EPA is the assessment
manager for the apptication, EPA will be a
concurrence agency for the application in
felation to this matter.
17. The application involves: (tick the applicable box/es)
IDAS Assessment Checklist, Version 19.0, 2 March 2007
od reconfiguring a lot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 ~
+ item 5, including the exemption otherwise provided for by paragraph (d);
* item 6, including the exemption otherwise provided fer by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum -
activity; or
(b)_ in an area for which an area management advice has been ngiven for unexploded
ordnance - complete Part N of Form 1
(1 (i) a material change of use-
{a} ‘made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
” for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
LAF) none of the above
Electricity infrastructure 18. The application involves: (tick the applicable box/es)
FOL more nformation refer to schedule ofthe) - [1 (i). reconfiguring a lot where any part of the lot is — :
U " . . « subject to an easement in favour of a distribution entity or transmission entity under the
Iniass you answered “nane of the above" to
Q18, the application tiggess referral to the Electricity Act 1994 and the easement is for a transmission grid or supply rietwork under
agency to which the easement is aranted in that Act; or
favour of as advice agency. + situated within 100m of a substation site; y
DL (i) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
(1 (ili) a material change of use, assessable against.a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site; ><
C1 (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if —
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
+ the work is located wholly or partly within 10m of a substation site;
re none of the above.
Land designated for community 19
infrastructure
Apptications involving devetopment on jand
designated for community infrastructure may
Uigger this referral.
For more information refer to schedule 2 of the
IP Requtation.
tf you answered "YES” to 01S, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
li an agéncy other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.
. Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure? \
{i) intended to be supplied by a public sector entity; and
(i) on land not owned by or on behalf of the State; and
{iii) other than development —
{a) for the designated purpose; or
(b)_ carried out by, or on behalf of, the designator.
jo
Cl yes
Page 6
Page 12
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the
IP Reaulation. .
Refer to Chapter 2, part 5A and schedule 10 of
. the Integrated Ptanning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions. ..
Unless you answered “none of thé above’ fo}
020, the application requires assessment by the
Office of Urban Management (OUM}.
Fisheries matters
For more information refer to schedule 2of the !P
Untess you answered ‘none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
(OPI&F). .
If an agency other than DPI&F is the assessment
manager for thé application, DPI&F Is 2
concurrence agency for the application in
retation to items (i) — (Iv) and an advice agency
in relation to item (v).
IDAS Assessment Checklist, Version 19.0, 2 March 2007
20. The application involves (tick appicable boxes) -
0 @ amateriat change of use of premises -
(a) _ in a Major Development Area in the Urban Footprint for -
00 i) anurban activity -
(1 inanarea included in a structure plan where the IPA, section 3.1.6
applies;
(1 inan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme °
C1 (i) . intensive animal husbandry; or
O {iii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
1 (i) anurban activity and not specified in section 2.4(2); or
(1 (i) residential development involving a rural residential purpose and not
specified in section 2.6(2)
{c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -
OO (i) anurban activity and not specified in section 2.10(2);
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
2 (ii) intensive animal husbandry
OD (i) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
my (iii) none of the above
21. The application involves: (tick the applicable box/es)
C1(i) an assessable material change of use for aquaculture - complete Pat O; of Form 1;
UD (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1; .
Ci (ii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1, .
C (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area; . ,
i) none of the above.
Page7
Page 13
INTEGRATED PLANNING ACT 4997 IDAS Assessment Checklist, Version 19.0, 2 March 2007
integration of fand use and public |22. The application involves: (tick the applicable bowes)—
transport
For more information refer to Guide 23, schedule (Wi) a material change of use assessable against the planning scheme for a purpose
8A of the IPA, & scnedule 2 of lhe iP Regulation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the - schedule.
application triggers referral to QT as a
concurrence agency. Oi reconfiguring a lot—
: LJ {@) ‘on land that is completely or partly within a public transport corridor, and the
total number of tots increases; ~<
OJ (b) ontand that is completely or partly within a future public transport corridor or
an airport's public safety area; <
[4 (c) _ on tand that is within 400m of a public passenger transport facility or a future: |
public passenger transport facility, and the total site area is 5000m? or greater;
(CO @) fora residential purpose within the 25 ANEF contour for an airport; «
{V(e) for aresidentiat purpose resulting in 100 or more allotments. ><
© (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
5 above, on land that—
[J (a) _ is completely or partly within a public transport corridor or a future public
transport corridor; = x
C1 (b) wilt result in work that encroaches into an airport's operational airspace. .<
raw) none of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guide 23, schedule C1 @ a material change of use assessable against the planning scheme for a purpose
SA ot the IPA & Schedule Zolthe EReaulaton mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that @
Unless you answered “none of the above’, the
application triggers referral ta QT as a schedule.
concurrence agency. LD (ii) reconfiguring a tot—
C1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(J (b) on Jand that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater, 6
C1 (¢) _ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases; ~
[1 (d) on land that abuts rail corridor land, commercial corridor land or future railway
- fand and an easement abutting the corridor or future railway land is created: ~
Cle) ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases; | *
[CO (f) for a residential purpose resulting in 100 or more allotments. < °
C1 (ii) operationat work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m?, on land that—
(1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure; <
( (b) is completely or partly within future railway land, or a sailway tunnel easement; @
LJ {c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary. <
A) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 20K the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es}—
vnesen answered “none ofthe abovet. th (1 (i) a material change of use assessable against the planning scheme and not associated
in| u answered “hone ve", the , . " .
application riggers ceferral othe holder of with reconfiguring a lot, and any structure or work will be located wholly or partly in the
_ pipeline licence No 1 issued under the Petrofeum easement.
At 1823, oureity Sanios QNT. Pay Lt, fo OO (i) reconfiguring a lot
vice,
C1 (ii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
[>¥(iv) none of the above.
Page 8
Page 14
INTEGRATED PLANNING ACT 1997
Koala habitat area
For mote information, efer to Guide 26 and
Schedule 2 of the IP Regulation.
. Unless you answered “none of the above’, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.
IDAS Assessment Checklist, Version 190, 2 March 2007
25. The application involves: {tick the applicable box/es)—
(1@ a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic.
activity and will result in —
(O(@) clearing of native vegetation over an area greater than 2500m?;
(J (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m?;
CL (©) anextension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than-1000m2,
(1d) extracting gravel, rock or sand from an area greater than 5000m2;
(Je) excavating or filling an area greater than 5000m?;, :
Oo additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day. -
Di reconf figuring a fot in a koala conservation area or koata sustainability area that will
result in-
{1} (a) anincreased number of lots;
C (b) clearing of native vegetation over an area greater than 2500m?.
C1 (iti) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a jot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.
LC (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (j} or reconfiguring a lot mentioned i in (ij) above) that is not for a domestic activity
and will result in —
C1 (a) clearing of native vegetation over an area greater than 2500m?;
(J (b) extracting gravel, rock or sand from an area greater than 5000m?;
(1 (©) excavating or filling an area greater than 5000m?.
ae none of the above.
Wild river area
For more information, refer to Guide 27
It you answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed :
development is “prohibited” in a wild river area.
Note: Davelopment can be “prohibited” in a wild
‘iver area because the application cannot be
accepted by the assessment manager.
26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?
NO
CIYes
Referral coordination
An information request requires referral
coordination if the application involves —
{i} Jor more concurrence agencies; or
(li) a facility or area assessable under a
“planning scheme and prescribed in
schedule7 or 8 of the [P Reauiation: or
{ii} development which is subject to an
application for preliminary approvat
mentioned in $3.1.6 of the IPA.
For more information go to Guide 2 and Guide 6.
27. Does the application trigger referral coordination?
0
(1 YES, as the application: (tick the applicable box/es)
(4) _ tigers 3 or more concurrence agencies;
Oo (ii) “involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;
Didi) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under-a planning scheme, or
reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation;
C1 (iv) | is for a preliminary approval mentioned in s3.1.6 of the IPA
Referral agency responses prior to
lodgement
Under $3.3.2 of IPA a referral agency may give a
referral agency response on a matter within its
jurisdiction about a proposal before an
application for the proposal is made to the
assessment manager.
This is commonty the case where an application
fequiras referral to a building referral agency (eg.
28. Did a referral agency give a referral agency response under $3.3.2 of the IPA before the
application was made to the assessment manager?
NO
(YES - attach a copy of the referral agency/s response/s
Qid Fire and Rescue Service}.
Page 9
Page 15
INTEGRATED PLANNING ACT 1997
SECTION 2 - ASSESSMENT IN A WILD RIVER AREA
(completion mandatory if the proposed development is located in a wild river area) _
IDAS Assessment Checklist, Version 19.0, 2 March 2007
ee
Wild River Area
* be accessed by contacting the Department of
It the responsibility of the applicant to
determine If the development is proposed in
a wild river area.
information about witd river areas Including the
geographical location and position of
Management areas In relation 10 properties, can
Natural Resources and Water (NRW}, accessing
the department's website www.nrw.ald.gov.au or f°
contacting the department by email on:
ld. [email protected] on Referrais
Referrals for development in a wild river area
(other than for agricultural activities and animal
husbandry activities} are not changed from the
existing referral arangements.
Notes on development assessable
against the Wild Rivers Code
For information regarding development in a wild
fiver area, see the relevant wild river dectaration
and Guide 27, The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from witd river requirements,
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant |
declaration will provide the information applying
to each wild river area.
Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development activities which may be made
inctuding those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a retevant
wild river declaration,
1,
Which wild river area is the development proposed in?
The proposed development is to be located in: (tick the applicable box/es)
(Ji) ahigh preservation area (HPA);
(J ii) a preservation area (PA) ;
(J iii) a wild river floodplain management area (FMA);
(iw) a wild river nominated waterway,
(1 v) a designated urban area (DUA).
Environmentally relevant activities
(ERAs) in a designated urban area
If you answered YES, your application for an
ERA is exempt from any wild river requirements,
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.
If you answered NO to Q2, please complete the
remaining questions in Section 2.
2.
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild. river declaration)?
i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
Ld YES (ensure you have completed Part G of Form 1)
Dono.
7”
x.
* Clearing native vegetation
ITYES and you ticked 04 box i) the application
If YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA,
may be made and is assessable agains! the Wild
Rivers Code. If YES and you ticked Q4 box ii)
the application will not be accepted,
Note: If clearing native vegetation is ina PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.
Is the application operational work for clearing native vegetation in a HPA?
NO
If YES, is the clearing?
(1 YES (ensure you have completed Part J of Form 1)
Oo i) clearing regrowth (as defined in the Vegetation Management Act 1999} in a registered
area of agricutture in a HPA (see Guide 27); or
(1 ii) in a HPA outside a registered area of agriculture?
Page 10
Page 16
INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas
If you answered YES to Q5, and ticked any
boxes in 06), your application is required to be
assessed against and must comply wilh the Wild
« Rivers Code.
If you answered YES to Q5 and licked box Ijin. =
O6, Your application s requirad to be referred to
the EPA.
_ Note: If specified ‘works are proposed in a local
- govemment area, it is prescribed tidal work — the
felavant local government will be the
assessment manager with the EPA as a
concurrence agency ~
li you answered YES to Q5, and ticked box ii} or
il} in Q6, your application requires referral to
OPIF.
If you answered NO to 05 and.ticked box i} in
G6, the appication will not be accepted.
If you answered NO to Q6, ticked box ii) in O6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or ifa
fequired permit is held, the application must be
assessed against and must comply with the Wid
Rivers Code. Applications for purposes other ©
than specified works or as described above will
not be accepted.
If you answered NO at 05 and ticked box iii) in
Q6, the application may be made if the works are
ina PA, These applications must be assessed
+ against and must comply with the Wild Rivers.
Code. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27
Residential, commercial or industrial
development
I you answered YES to Q7, your application is
fot subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment agaliist the retevant wild] g
diver declaration or Wild Rivers Code, you do not
need to complate the remaining questions In
Section 2.
If you answered NO to Q7 and ticked elther box
i) or ti) in Q8, the assessing agency is the
relavant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.
IDAS Assessment Checklist, Version 19.0, 2 March 2007
{s the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-_
Development in a wild river afea)
NO _ Oyes
The application is for one or more of the following:
(1) Operational works that is tidal works or works in a coastal management district (ensure you 9
have completed Part M and/or Part P of Form 1); Of .
oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF
(J iti) Building or operetional works in a fish habitat area (ensure you have completed Part O2 of Form 1).
ls the application for residential, commercial or industrial development in a designated urban
area?
[no ves
If NO, does the application for residential, commercial or industrial development involve:
(1) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 4); or
CD ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1}.
Animal husbandry activities
if you answered YES to Q9 your application
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for animat husbandry
activities will not be accepted If propased In a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?
NO -27 YES (ensure you have completed Part R of Form 1)
Agricultural activities
ff you answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.
The production of fodder ina PA, and pasture
improvement using fow impact soit disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more infofmation see Guide 27.
10.
Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA?
[Kio (11 YES (ensure you have completed Part Q of Form 1)
If YES is the application for:
O i) a material change of use; or
(J ii) operational works.
Page 14
Page 17
INTEGRATED PLANNING ACT 1997
Works that take overland flow water
The relevant wild river declaration wid state.
works that take overland flow waler are either
Self assessable or assessable, of are exempt
from wild river requirements.
Hf you ticked Q13 i}, your appfication must be
assessed by NRW against the Wild Rivers Code
+ and must comply with the code.
I you ticked Q13 ii} an application is not required
to be made however the works must comply with
the relevant seif-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
“is required and must be assessed by NRW
“against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q13 ili) your application is not
Subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessabie or
exempt will not be accepted. . .
13,
IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
/ [MiNio [AYES (ensue you have completed Part Ke of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
(J i) assessable works
Lil self-assessable works
LD ii) exempt works
Works that interfere with overland
flow water
The relevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.
Ifyou ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
tf you ticked Q15 ii) an application is nat required
to be made however the works must comply with
the relevant sell-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code,
MW you ticked Q15 iii) your application is not
subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
Does the application involve works that interfere with overland flow water in a FMA?
NO (21 YES (ensure you have completed the relevant Part K of Form 1)
If YES, is the application for works stated in the relevant wild rivers declaration to be?
(Zi) assessable works
[71 ii) self-assessable works.
(1 iii) exempt works
Waterway barriér works
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES {0 Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
16.
Does the application involve building or raising waterway barrier works in a PA?
[io (CI YES (ensure you have completed Part Os of Form 1)
Aquaculture (non ERA)
Applications for aquaculture in a HPA will not be
accepted.
If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve aquaculture ina PA?
fio O YES (ensure you have completed Part O: of Form 1)
Works that interfere with water in a
watercourse
Note: If the development is propased in a HPA,
applications for all works that interfere with water
in @ watercourse (including dams or weirs,
‘stream realignment or stream diversion) will not
be accepted.
In a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
if you ticked box i) in Q19, your application will
not be accepted. :
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
Fiver requirements.
More information and locations of nominated
waterways is available by conlact NRW,
accessing the department's website
‘Www.nrw.qld.gov.au or contacting the
department by email on:
wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
0 (J yes (ensure you have completed the relevant Part K of Form 1)
If YES, .
(i) The application is for an instream dam or welr, or
(J ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Page 12
Page 18
” INTEGRATED PLANNING ACT 1997 Environmentaily relevant activities Most applications for an ERA In a HPA will not . be accepted. Applications which may be mada - fequire referral to the EPA. The assessment of some ERAs is assessed by NRW, others have been devoNved to DPIF, NRW or delegated. ‘focal government (see EPA website for more ‘Information on devolved ERAs} “Ityou answered NO to 20 you do not need to complete Qs 21-24, If you answered YES to Q20 and the development is in a PA, your application must be “assessed by the administering authority?" against the Wild Rivers Code and must comply with the coda, unless the proposal'ls for development where an application will not be accepted, or is exempt from wild river fequirements (see Q2}. You will be able to determine if an application will not be adcepted for the development by answering Q21 ~ Q24. If you answered NO to 021, you do not need to” complete 022.’ if you answered YES to Q21 you are required to complete Q22. If you answered NO to Q22, the apptication will nat be accepted. If you answered YES to 022, * the application must be assessed by NRW agalnst the Wild Rivers Code and must comply with the code. . . If you answered NO to 023 and the development! is proposed in the HPA the application will not be accepted. If you answered YES to Q23, the application must be assessed by the EPA or NRW (as prescribed in schedule 8A of the IPA) against the Wild Rivers Code and must comply with the code. if you answered YES to 024 the application will not be accepted. If you answered NO to Q24, your application must be assessed by NRW against the Wik Rivers Code and must comply with the code, Exempt ERAs in a designated urban area if the development is proposed in a designated urban area there may be no wild river requirements. See Section 202° Note: All applications that can be accepted must be assessed against and must comply with the Wild Rivers Code (other han exempt ERAs in a designated urban area). . Documentation If you answered NO to Q25, your application may be subject to an information request and processing of the application may be delayed. IDAS Assessment Checklist, Version 19.0, 2 March 2007 20. Does the application involve an ERA? NO Ciyes (ensure you have completed Pat Gof Fort). 21. Is the application for an ERA 20 instream? NO C1 yes 22. 1s a quarry allocation notice held for the proposed ERA 20 instream? EAfio - Dyes 23. Does the application involve any of the following in a HPA? i) a level 2 ERA 11, (and is for specified works or a residential complex) il) an ERA 19 (dredging) iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in the Wild Rivers Act 2005, and Environmental Protection Act 1994) iv) an ERA 22 (out of stream) 10 Clyes 24, Is the proposed development for ERA 20 (out of stream) and; — inaFMA; and . ~ notlow impact; and — not for a residential complex in the area, or for specified works. CJNo (yes 25. Has documentation been included with the application describing how the applicant proposes to comply with the mandatory requirements, required outcomes, and/ or performance requirements as set out in the relevant part/s of the Wild Rivers Code? [ANo Clyves 24 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW. Page 13
Page 19
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 19.0, 2 March 2007
SECTION 3- BUILDING REFERRALS {completion not not mandatory)
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
"| For mare information go to schedule 2 of the IP
Requlation
Special fire services - + generally 1. An’application may trigger referral to Qld Fire and Rescue Services as an advice-agency if the building work
For more information go to schedule 2 table 1 and requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
schedule 2A of the IP Requlatian. (IP Regulation) or includes an altemative solution assessed against the performance requirements of the
Assessment period 15 days. No response is a Building Code of Australia.
deemes refusal. .
'| Fire safety for budget accommodation | 2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more Informnation go to schedule 2 of the IP * the subject of the application requires the installation of a fire safety system for a budget accommodation
Regulation building.
Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the eB if the application involves a workplace incorporating spray painting.
Regulation .
Retail meat premises | 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
For more information go to schedule 2 of the IP retail meat premises. :
Regulation : .
Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a private health facility.
Requiation
Workplace area fess than 2.3m? 6. An application may trigger referral to the Department of Industria! Relations (DIR) as an advice agency if the
For more Information go to schedufe 2 of the IP application involves a work place area less that 2.3m,
Requiation
Land contiguous to a State-controlled’} 7, An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
road agency if the application involves land contiguous to a State-controlled road.
For more information go to schedule 2 of the IP
Regulation
Pastoral workers accommodation 8. An application may trigger referral to the Department of industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the [P if the application involves pastoral workers accommodation.
Regulation
Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedule 2 of the IP application involves a childcare centre.
Requiation
Coastal development 10. An application may trigger referrat to the Envitonmental Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the {P if the application involves land completely or partly seaward of a coastal building line22,
Regulation
Heritage . 11. An application may trigger referral to the Heritage Council as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a heritage registered place. . .
Requiation .
Fisheries matters _| 12. , An-application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
For more information go to schedule 2 of the [P concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Regulation as an advice agency if the application involves assessable building work on land that adjoins a declared fish
_ habitat area.
Integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the application’
transport involves existing of future public transport corridors, or airport operational airspace”,
For more information go to schedule 2 of the IP
Regulation :
Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The focal government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
lime. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. !f no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class ta or class 10 building or structure (15), no
_ Tesponse is taken to be a deemed approval.
Amenity and aesthetic impact of
particular building work for single
detached class 1 building or class 10
building or structure
Fos more information go to schedule 2 table 1 of the
IP Regulation.
Assessment period 15 days. No response is a
deemed approval
15,
An application will trigger a referral to the local government if itis :
© fora single detached class 1 building or class 10 structure; and
* the local government has declared by resolution the following:
— the appearance of the builging or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality. . .
2 Coastal building fines are prescribed under the Coastat Protection and Management Act 1995.
2 Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vielnity of Certain Airports and Aviation Facilities”.
Page 14
Page 20
o
designated rainwater tank area
For more information go to schedule 2 table 1 of the
IP Regulation and the QOC part 25.
Assessment period 15 days. No response is a
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007,
Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes referral to the local goverment as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP Requiation. :
Assessment period 15 days. No response is a
deemes refusal. :
‘Design and siting 17. An application may trigger referral to the focal govemment as the concurrence agency if the building work
For tore information go fo- schedule 2 table 1 of tha’ does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code._ + |
IP Requiation. 18, An application may trigger referral to the locat government as the concurrence agency if the building work
Assessment pertod § days. No response is isa does not comply with the qualitative statement for building clearance and site.cover:
deemed refusal. "119. An application may trigger referral to the loca! government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or9 of the Queensland ,
: . .Development Code, part 110r 12. , A
Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Buiiding Act 1975 when the building work has
For mare information go to schedule 2 table 1 of the been completed.
IP Requlaon.
Assessment pertod 15 days. | Notesponse is ac
deemed refusal.
"| Higher risk personal appearance 21. An application may wigger referral to the local government as the concurrence agency to determine if the
services building work
For more information goto schede 2table t of the ¢ — complies with the performance criteria of the Queensland Development code part 15; and
JP Regulation and the QOC part 18, ¢ the work does not comply with an acceptable solution stated in the part. ™
Assessment period 15 days. No response Is a
deemed’ refusal . . : .
Buitding work for residential service |22. An application for building work for premises in which residential care service under the Residential
For more information go to schedule 2 tabla 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
{P Requtation and the QDC part 20. referral to the local government as the concurrence agency.
Assessment period 15 days. 'No-response is a
deemed refusal. . . . .
_[ Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding - teferral to the local government as the concurrence agency.
For more Information go to schedule 2 table 1 of the
IP Requlation. .
Assessment period 5 days, No response is a
deemed refusal, .
| Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the
building work or structure complies with the relevant performance criteria if -
* Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and
+ Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.
deemed refusa, .
Caupeldl_ ote eS uch.
Page 15
Page 21
PROJECT DESCRIPTION
LOT NO.S 1 & 2 ON GTP 4S2 OR RP 81559
PARISH OF NOOSA
COUNTY OF MARCH
LOCAL AUTHORITY : NOOSA COUNCIL
TOTAL ALLOTMENT AREA : 613m Sq
CONSTRUCTION NOTES
ACCESS & EGRESS:
THRESHOLDS:
FIRE HAZARD PROPERTIES:
FIRE RATINGS:
GENERAL
SITE VERIFICATION
CONTROL JOINTS
WINDOWS
EXTERNAL FIXINGS AND
FITTINGS
PLUMBING AND
ACCESS PANELS
e@ HANDRAILS
CARPARKS
SECURITY
SMOKE DETECTION
& EXTINGUISHERS
DESIGN / DRAWN :
ROBERT PATTERSON
LL) QBSA Lic.No, 1095554
fax : (07) 5449 1899
DESIGN to DETAIL m : 0401 394 964
: [email protected]
PROVIDE A CONTINUOUS PATH OF TRAVEL TO AND WITHIN THE BUILDING TO PROVIDE ACCESS TO ALL
REQUIRED FACILITIES. ACCESSWAYS, WALKWAYS, RAMPS AND LANDINGS SHALL HAVE AN
UNOBSTRUCCTED WIDTH OF NOT LESS THAN 900mm AND BE CONSTRUCTED WITH MIN. LIP OR STEP AT
JOINTS BETWEEN ABUTTING SURFACES. ALL GRADIENTS AND CROSSFALLS SHALL NOT EXCEED 1:40.
ALL THRESHOLDS FOR DISABLED ACCESS MUST HAVE A MAXIMUM CONSTRUCTION STEP TOLERANCE
OF 5mm WHICH {S ACCEPTABLE USING ROUNDED OR BEVELLED E0GES, PROVIDE RECESSED SLIDING
DOOR FRAMES WHERE REQUIRED. - GENERALLY 20mm TO 100MM STEP AS SHOWN ON DRAWINGS
ALL MATERIALS AND ASSEMBLIES MUST COMPLY WITH SPECIFICATION C1:10 OF THE BCA FOR CLASS 2
BUILDINGS.
EXTERNAL LOADBEARING WALLS 90/60/30
EXTERNAL LOADBEARING POSTS / COLUMNS 90/-/-
INTERNAL LOADBEARING WALLS lef
INTERNAL LOADBEARING POSTS / COLUMNS 60/-/-
COMMON WALLS OR FIRE-WALLS 90/90/30
FLOORS 60/-/-
ROOF a-f-
ALL WORK TO COMPLY WITH BUILDING CODE OF AUSTRALIA AND ITS MOST CURRENT AMENDMENTS
THIS
CONSTRUCTION BEING MIXED CLASSES 2 OF TYPE B CONSTRUCTION
BEFORE COMMENCING CONSTRUCTION ALL DIMENSIONS, EXISTING LEVELS, FINISHED LEVELS AND
ALL SITE'SERVICES ARE TO BE VERIFIED ARCHITECTURAL DRAWINGS ARE TO BE READ IN
CONJUNCTION WITH ANY ASSOCIATED CONSULTANTS DRAWINGS
GENERALLY WHERE FLUSH FINISH IS REQUIRED BETWEEN TWO BUILDING ELEMENTS, PROVIDE A V-
TYPE CONTROL JOINT PROVIDE CONTROL JOINTS AT MAXIMUM 3 METRE CENTRES TO EXTERNAL TILED
AREAS SUCH AS BALCONIES, ENTRANCES, ETC REFER TO STRUCTURAL ENGINEERS DRAWINGS FOR
CONSTRUCTION JOINTS. 6M CENTRES FOR EXTERNAL WALLS, OR AS PER ENGINEERS DESIGN.
WINDOW FRAME AND GLAZING TO BE INSTALLED TO THE CORRECT TERRAIN CATEGORY INCLUDING
LOCAL PRESSURE FACTORS IN ACCORDANCE WITH AS1288
TO BE NON-COMBUSTIBLE AND CORROSION-RESISTANT
ALL PLUMBING DUCTS TO HAVE ACCESS PANELS TO COUNCIL REQUIREMENTS
HANDRAILING AND BALUSTRADING TO COMPLY WITH PARTS 02.16 AND 02.17 OF BCA
ALL CARPARKS SHALL BE IN ACCORDANCE WITH THE AUSTRALIAN CARPARK STANDARDS AS 2890.1 -
4993 AND LOCAL COUNCIL REQUIREMENTS
SELECTED BY OWNER, UPON MANUFACTURERS RECOMMENDATIONS.
SMOKE DETECTORS SYSTEM TO AUSTRALIAN STANDARDS & BCA REQUIREMENTS LOCATEO BETWEEN
KITCHEN & BED RMS
FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER
SCALED MEASUREMENTS, VERIFY ALL ON SITE
DIMENSIONS AND LEVELS PRIOR TO THE
COMMENCEMENT OF ANY CONSTRUCTION.
CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY
OF ANY DISCREPENCIES.
BUILDER :
KJ CONSTRUCTIONS
QBSA Lic.No. 21815
fax : (07) 5447 1714
m : 0409 471 714
€: [email protected]
K) CONSTRUCTIONS
CLIENT
PLANNING PERAMETERS
THIS PROJECT REQUIREMENTS :
SITE AREA:
CURRENT ZONING :
ASSESMENT :
OVERLAY Y/N:
QLD DEV. CODE
SUSTAINABILTY REQUIREMENTS :
WATER SAVINGS TARGETS :
IDEAS CHECKLIST SUPPLIED Y/N:
MAX BUILDING HEIGHT :
POPULATION DENSITY :
MAX PLOT RATIO (GROSS FLOOR AREA) :
MAX. SITE COVER
MIN, SOFT LANDSCAPING :
CAR PARKING :
FLOOD LEVEL & DRAINAGE :
THIS PROJECT :
Notes :
613m Sq
MULTIPLE HOUSING TYPE 2 DUPLEX
MCU APPLICATION : CODE ASSESABLE :
PART 14 DIV 1-12.
NO
YES
YES - TO QLD DEVELOPMENT CODE PART 29
YES - TO QLD DEVELOPMENT CODE PART 25
YES
8m MAX. 2 STOREY
2 BED PLUS 3 BED ALLOWANCE
0.45 :1 (45 %)
40% (245m)
20% (122.6m) NATIVE SPECIES.
41 OCCUPIER SPACE PLUS 1 VISITOR SPACE MIN,
RL 2.500
The site has an existing Duplex on it that is occupied by the owner in No.1. The owner
will build & occupy the new Duplex in No.1.
The old Duplex will be demolished & recycled appropriately.
The site will be filled & compacted with approved imported earth.
Footings will be designed to suit by an Engineer.
The Proposed GFA is well under the requirement, and is actually less than the existing
dwelling, but the Proposed Site Cover is a mere 1 % over the allowance.
2 visitor Car Parking Spaces will be provided.
A3 -point turn & forward gear can be used to enter & exit the proposed carparks &
Double lockup Garages from the street.
Also Refer Page 2 for further Notations
PROPOSED DUPLEX at
JOB DESCRIPTION
LOTS 1&2 AT 23 EDWARD ST,
NOOSAVILLE A
DESCRIPTION
THIS PROJECT PROVISIONS :
AREAS:
EXISTING :
LOT 1: 233.28 sqm
LOT 2: 235.97sqm
COMMON AREA: 143.86 sqm
LIVING : 177.6 sqm
GARAGE : 36.9 sqm
COURT: 25.9
TOTAL : 240.1 or 39% or Plot Ratio of 0,39:1
EXISTING GFA: 177.6 sqm or 29%
EXISTING SITE COVER : 221.5 sq mor 36 %
PROPOSED :
LOT 1: 246.20 sqm (40.2 % ea.)
LOT 2: 246.20 sqm
COMMON AREA: 120.70 sqm (19.6% )
GROUND FLOOR :
LIVING: 73 sqm
GARAGE : 47 sqm
OPEN ENTRY COURT : 12 sqm
(reduce to 7sqm after 600 o/hang for GFA)
TOTAL: 132sqm EA. (264sqm) or 43%
or 0.43:1 Plot Ratio
FIRST FLOOR:
LIVING: 110sqm
BALCONY : 40 sqm
TOTAL: 150 sqm
PROPOSED GFA: 85 sqm ea.: 170 sqm or 27 %
SITE COVER : 127sq m ea. ( 254. sqm) or 414%
LANDSCAPING :
PAVED : 66 sqm ea. (122 sq m) (incl. entry court)
EX. AGG DRIVE-WAY : 46 sqm ea. (92sq m)
SOFTSCAPE GARDEN BEDS : 61 sqm (122sq m) or 20 % .
POOL : 10.8 sqm ea. (21.6 sq m)
TOTAL : 178.8 ea. (357.6 sqm) or 58%
DEVELOPMENT
APPROVAL
{ NOT FOR CONSTRUCTION }
Page 22
GENERAL:
The position of Site Services is schematic only. The drawings
demonstrate the general distribution requirements and NOT the
actual placement. "AS CONSTRUCTED" drawings together with
any approvals, test results, or warranties, shall be prepared by the
nominated subcontractor and lodged with the principal contractor
prior to the final commissioning of the works.
PROPOSED POOL:
The proposed location and shape of the pool is suggested only. Poo!
details are to be submitted under a separate application by others.
WATER SERVICE:
20mm Class PD UPVC trenched 300mm min into ground and
600mm min clear of external footings.
CHANNEL & GRATE:
Install "Everhard" 135 x 150 black "Everdrain” 1-100 min.
crossfall, to terminate at silt trap.
STORMWATER:
Stormwater drainage is to comply with AS/NZS 3500.3.2 and 3.1.2 of
the B.C.A. Generally stormwater run-off is to be disposed of on site
into wetland pond shown on plan which will have an outlet to the .
The position of any pipework shown is diagrammatic only, exact
locations including discharge points should be approved by the
appropriate authority prior to commencement. Prior to back filling,
photographic records of pipework shall be taken by the builder.
Rainwater Tanks: 1 5,000L required, 3 OF (10,000 G) PROVIDED
SANITARY DRAINAGE:
Sanitary drainage plans shall be prepared by the Plumber & a copy
Qi to the owner, the designer & the local government
‘authority, All drainage work shall be in accordance with the Council
approved plans and adhere to Queensland Development Code.
ARTICULATION : @)
Refer to Engineers drawings for Articulation / Control Joint locations.
No blockwork wall must have a continuous run of more than
9m without a control joint or change of direction.
DESIGN / DRAWN : BUILDER : FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER
ROBERT PATTERSON KJ CONSTRUCTIONS SCALED MEASUREMENTS, VERIFY ALL ON SITE
QBSA Lic.No. 1095554 RSA Lic.No. 21815 DIMENSIONS AND LEVELS PRIOR TO THE
LoL) fax : (07) $449 1899 fax : (07) $447 1714 COMMENCEMENT OF ANY CONSTRUCTION. KJ CONSTRUCTIONS
DESIGN to DETAIL. : 940! 394 964 m:0409 471 714 CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY CUENT
@:robert@designtodetallcamau —_e : [email protected]
SUSTAINABILTY :
WATER-SAVING DEVICES: Group 7 : 70kL per year req'd.
In accordance with PART 25 of Queensiand Development Code.
Semi-Submersed Polythylene Potable Rainwater Tanks complying
with AS 4766 and AS 1170.
Including backflow prevention device & low voltage energy rated
pump. Mosquito nets or flap valves at all openings. Overflow to be
deposited into stormwater system via. overtand flow.
In aqccordance with Part 29 of QDC & Water Act 2000, water saving
Shower Roses must be used as a minumum. Use water and energy
saving devices through-out.
Toilet Cisterns to have Dual Flush Capabilty not exceeding 6L on full
flush & 3 L on Half Flush.
Energy Efficient Lighting : 40 % of floor area to be fluorescent
lighting or Compact Fiuoro Lights (CFL)
Hot Water System : 5 Star Rated Gas Instant System. Two Bottle
Supply.
Insulation :
Roof & Externai Wall Framing to contain Batts to be of best Quality
Energy Rated Natural Product available.
Sarking to be of top quality, self insulated type.
Shading devices to exposed windows or tinted film applied to reduce
heat soak into house
Extra Notes :
Use High Quality, locally made products that will last.
Install natural products rather than manufactured products.
Recycle all waste possible.
install at least 1 compost bin.
Have seperation bins in kitchen for recycling.
Avoid chemical leaching from pest treatments e.t.c into earth or
water systems.
Only Use airconditioning & heating systems when absolutely
necessary.
Install quality blinds & use them to run your home effieciently.
OF ANY OISCREPENCIES.
CONSTRUCTION NOTES :
The site lies in an area zoned as Urban Residential by the council.
{tis intended to build up a compacted fill base, rising 500mm above existing ground
level for slab on ground construction for the house and garage.
The drive-way will also be built up with compacted fill accordingly to these areasand
have suitable culverts & drainage pits where required to drain water to not
change the existing overland fiow path of travel. Selected tiles and or floating timber
floor finishes will be applied with suitable w‘proofing & falls to floor wastes in wet areas.
External Walls will be core filled & reinforced concrete blockwork with wproof texture
coat render finish to base walls. Upper walls will be corefilled concrete blockwork.
Selected paint finishes to plasterboard linings to ail internai faces & feature stone wall
cladding & wail capping installed to manufac. spec. where required.
Intemaf walls will be of timber framed construction to BCA & Qid Timber Framing Code
Requirements.
Doors & windows with be p/c aluminium framed & glass will be to BCA requirements or
as specified by manufacturer.
The Roof seen at the front of the building will be a 15 deg. & 8 deg. pitches with a
small section of parapet wall with angled wing wall dteails to add a distinctive
character. The roof cladding will be a selected colorbond custom orb to council
required colour.
All exposed timber to be min. class 2 Treated to H3 F14-17 HWD
{f timber posts to be in contact with ground they must be class 1.
Drive-way to be a selected non-reflective Exposed Aggregate or the fike that fits in with
its natural surroundings.
Swimming Pool will be concrete & must be seperately approved & installed to
manufacturers spec.
PROPOSED DUPLEX at LOTS 1&2 AT 23 EDWARD ST,
JOB DESCRIPTION NOOSAVILLE
28-03-07
DESCRIPTION
DEVELOPMENT
APPROVAL
(NOT FOR CONSTRUCTION )
Page 23
QBSA Lic.No. 1095554
€ :[email protected] —e ; [email protected]
10.059 my——1p0K, __10.059 m
<a
i,
SS
‘Ti =r
at Balcony above shown dashed
pool safe gate & fence
pool safe auto closing
sliding doors that
access pool court
1,804 OMP Upper Level
(UNIT 2
3000L rainwater tank as
rainwater tank as
part of boundary walt o part of boundary wall
0|@
oO
Req
N
1,504 OMP
1,504 OMP.
pF [= Wall to Floor Above
1,804 OMP Upper Level, + Wh tS Ss Stormwater to local council system
VISITOR
PARKING
200L Native Trees to front & back corners.
Footpath to council 45L Native Screening Trees along side
requirements & rear boundaries with small native shrubs
& groundcovers & approved mulch over high
quality local garden bed soits.
Exposed Aggregate Concrete Slab Drive-way PiCoated Alumin. Auto Sliding Gate
with falls to Street and gradients to council
requirements. See Section C.
23 EDWARD STREET
SITE PLAN ———SN
DEVELOPMENT
APPROVAL
5m
LOT S 1&2 ON GTP 482 ON RP 81559
BUILDER : FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER
KJ CONSTRUCTIONS SCALED MEASUREMENTS, VERIFY ALL ON SITE
QBSA Lic.No. 21815 DIMENSIONS ANDO LEVELS PRIOR TO THE 28-03-07 (NOT FOR CONSTRUCTION )
fax : (07) 5447 1714 COMMENCEMENT OF ANY CONSTRUCTION. K} CONSTRUCTIONS PROPOSED DUPLEX at LOTS 1&2 AT 23 EDWARD ST,
01-03-07
om: 0409 471 714 CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY ESCR! NOOSAVILLE A
CLIENT JOB D SPTION
OF ANY DISCREPENCIES.
DATE DWwG NO. 6017
Page 24
* 16509 ye
1
yyig0 7,970 2190 7,969 190 11
“br 430, 190 430 “
Hy A80 3,510 190 64 1,950 + 4. 1,890 1,890 Hf. 1,950 He 90 3,510 190 bye
600), __y $00 4. 2,000 + 4,470 196}, |.190 4,470 4 2,000 900 » _ 800 cavity wall to house sliding doors
199 42 61 s ‘490
ee 2,479 ¥ A168) 1,050), 1,460 1.200 fp 1,200_1_ 1,460_y 1,050 p 1488 4. 2,479 ee
qoaseceeseee essa nnecessens UP... procs secee een cee ee UP
bulkhead at 2400 H
' ‘
' t
' '
°
Oo , Mn
9 ' 24 26 SGD youre! 2426SGD 4P | |d 24 26 SGD "|e" 4 26 SGD ' 2
= 1 en ' .
a s Ne se a
y +¥X & | ft x Sey ¥
step’
rr 8
BRD penn nnn rrr rrr rrr errr cr rrr rrr 4 Pree n enna nner rn en mn nnn ass secnsenn q !
{ By Auto closing sliding doors t t ' Qo 1
' a to rear courtyard ! ! ' iB '
2 1 zt ' 1 3
s nT { i ' a3 zl
a 1 8 ig | oj
=
' \ DINING ' ' DINING | \ 1
2 1 pj \ ‘d.p 3
g ' ' t ‘ . ' 4
2 ' ! Oaodod LIVING ' 1 LIVING OOd ' ! ' 2
+l 8 — ite | S| oF
Q
8 | & — if | 8
gl a ' et) < | x a
oo} ° | sy ' | Yy 74 ‘sah ’ N t 2 a
o 618 i 3g COOK ,: Pod ' 1 ooo, COOK IOI Is | 8] a
& ; 8 “ \ potby we TM 13 oa
*, en - ry a
Q QoQ
ve iy HOG wo REF. ' ' RL 2.500 REF. tl ary] WO lo ep -- 4 “
ne °
3 ol + >| C PPee @sy4) a) aa] H iz * ol g
oa oO}
2 Rg 2! (IL ENTRY | UP uP | ENTRY 12 qo. 2
al a 7 & U J a 7 3 o
a ql Bi 3 3 3 zie tin = g g 3 x a 7
- 3 & 970 OHC LA pod 5 the tod l oHC 970 | 8 a 8 oe
tJ 4a | (eee ==4[] Pa | | | | | | geiepeo! = a | eu TA &
+ | Fg 8 aa comb Bach CTI iste | | LPP NAIEIERT ae up «=o 8 ® +
FAH < 0 0) SW Lt teil Od | DO {esto , . “To
FE x +e 2 * _e ae ar tL 5
s 7 = & 4
-| wt, ! | x, |
ar = ' | COURT L'DRY L'DRY COURT| ; ~ 8
Ae ae
oO |
2 \
| 29 BS 820 RL 2.400 820 20 38 8
opén oben
ol GARAGE GARAGE P ol
fq 8 ! § g &
Fe \ 4 ‘6 cot TTTTT -c7 7 pact T TTT 7 | w a 3
rm ~ >
ge pos aan tooN “7 * gl
* | ~~ “7 | | ~A “7 | ' ol +
1100 ss “7 ~~ “7 1100 | =
2 d. | soo I | ~~ | 5. S
aI 2 gate 1 ee | | eos | gate 2
* nN 1208 | oo7 ws \ | ooo es i 42.08 a ar
1 s opeh leo 2454 PLD ss! | oe 24 84 PLD ~s! open ° a
a Qn
Ae we AX e+e ee
+ IS = | Oa 3 +
r ' _ _ —— eee I N
~ - +
PROPOSED GROUND
190), 1,500 y,1,050 y 1,370 1 1,200 yy 1,200 |} 1,370 1,050 y 1,500 1190
“ i i 4 00 * +2007 i i Ht 100
' 2 to py 12 ao FLOOR PLAN
+% 2.479 190), 1,500 _ 90 3,400 110 “yeh 3,400 204. 1,500_y)A90 2,479 120} . SCALE 4: 100
1,804
Hp —1.380_; 4490 6,400 pey'90 6,400 190 1,980 i 5 ; DEVELOPM ENT
# 16,509 # m
DESIGN / DRAWN : BUILDER : FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER A P P RO V A L
ROBERT PATTERSON KJ CONSTRUCTIONS SCALED MEASUREMENTS, VERIFY ALL ON SITE (NOT FOR CONSTRUCTION )
QBSA Lic.No. 1095554 QBSA Lic.No. 21815 DIMENSIONS AND LEVELS PRIOR TO THE 02-1
LoL fax : (07) 449 1899 fax : (07) 5447 1714 COMMENCEMENT OF ANY CONSTRUCTION, KJ CONSTRUCTIONS PROPOSED DUPLEX at LOTS 1&2 AT 23 EDWARD ST, “ ; ~
m : 0401 394 964 mm: 0409 471 714 CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY DESCRIPTI NOOSAVILLE [Preliminary | 703"
DESIGN to DETAIL sendeigmodealicaman «:Heniebopondaetay OF ANY DISCREPENCIES. CUENT jon ION ISSUE DATE. -«OWG NO. 6017
Page 25
# 8,555 ¥ 8.555
f-
4 1
# 1.100 ¥ 7,360 yA 7,169 wr! fi.100
140 4 yyigso 3,700 0 3,380 yylso 3,380 90) 3,700 190 |, 960_1,140
i — th 2%. © 90 4 30 1% i 9 5, 99 res 4000W awning roof at 45 deg pitch
19064 1,530 Mp 940 7 050 He 41,490 He 1,800 190 fey 4,800 yp 1,490 ys 050 Ye 941 He 1,530 pp timber battens or other pervious
. cladding over.
600mm roof overhang
g step wing wall down
ae Be
2 ~
a o |, Th toa—rteser Rtg ch rp pgre to Woe pp aster eee eR LP He SSS
a Al Pitta
ye ERE
oO oo} a c=}
3] 5) BS
Q
2
sy oJ
“| 3
|
oS oO
aS
Q wl
38 ol
wo
x | X&
o
2
NI
N
ol —
a
© |
“ 2
XeG
xX gS
8
e sg) 8
ny] 8 +
st o 7”
“| = os oO
a
a 2
2 3
8 7 S
ot
oa
2
=
2
9} Qo
S| gl Ste Powdercoated Alumin, Handrail
6] and Balustarding above and between
& core filled & rendered 1000 H block wall.
a see, elevations
8 C= =i
“) wir iWIRY.
7,77 Pea = == ar an] oF fal
g WIR | WIE g PROPOSED FIRST
N x 1 store - hws N
Nip--- HIE: f--4aY Z|
4 8 3 FLOOR PLAN
LEER OF ;
3 8 * 620 20 2| 3 8 SCALE 1: 100
J" - g oJ = F
g g ae 8 0 én
o Qa
* 235 2
angled wall ends by
Hehi rendered block parapet wall
300D x 800W bulk awning pitching beam supported with selected stone capping.
by painted Gal, steel struts 1000h above FFL of Balcony
angled wing wall to 100mm
above height of parapet wall awning roof extension
490
Hye 90 3,380 90 ye 950 #e 4,200 . 1,550 Hye 1,550 + 4,200 # 950 Ho 3,380 190
1 ' a
break in masonry wall with
eyes 3,380 yao 3.700 ye90____3,700 $0 ye 3.380 190 4 selected balustrading & handrail infill
140 190 3,980 _ 8,510 0 3,100 2190 3,100 90 3,980 190 960 140
ee 4 104 4 tf DEVELOPMENT
+ 100 ye 14,910 xd Oe
+ 17,110 a
DESIGN / ORAWN : BUILDER : FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER A P P RO VA L
Se ee anne (no Fon cone
QBSA Lie.No. 1095554 Lic.No. 21 c DA Issue 28-03-07
|| fax : (07) 5449 1899 fax : (07) $447 1714 COMMENCEMENT OF ANY CONSTRUCTION. KJ CONSTRUCTIONS PROPOSED DUPLEX at LOTS 1&2 AT 23 EDWARD ST, ; ° - ss y sone
m: 0401 394 964 m2 0409 471 714 CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY OB DESCRIPTION NOOSAVILLE reliminal -03- wo No.
DESIGN to DETAIL @ :robertOdesigntodetall.com.au = ¢ : [email protected] OF ANY DISCREPENCIES. CLIENT jl ISSUE DESCRIPTION DATE ® 60 1 7
Page 26
2109 -on 9ma avg NOLLADSIO anssl “SHIDNEGIUDSIO ANY 30 newaupucdtiqgniuoshy: _arwooyeapow5iaaguegos : >
90 20-€0-10 AreUIwl eA ¥ JTHAVSOON NOLLdniDs3q 8OF ANaITD ATALVIOIWWI Y3NDISIC AJLLON OL YOLIVULNOD PIL 12% 6000: W y96 poe tovo:u = WHO) NDISIO
20-£0-82 ones! va 5 “1g GUWM] EZ LV ZBL SLOT 18 XaTdNG GasodOUd SNOLLONYLSNOD Nt “‘NOLLINYISNOD ANY JO LNIW3INIWWOD LLL Lees (20): 6681 GbrS (ZO) xe}
(NOLLDNYLSNOD YOs LON) BHL OL YOId S19AT7 ONY SNOISNIWIO S1B1Z “ONIN vSBD —-«SSSEOL “ONIN SBD
3LIS NO TIV Adiu3A ‘SLNAWAUNSVAW OFWOS SNOLLIMWLSNOD NOSWALLVd 1U380U
TV. AOU ddV YJAO 3DNIOINd SAV OL SNOISNAWIG G3BNDIS :yaqina DNMWud / NDISIG
trem jadeved vey sayBiy adidumop 'g peayuies Uappiy 0}
WOOD 0} Jem Bupje Jey “Ul Ul BruUMe yINg ey
[em Woy syys uO
payoddns joo Bulume lem yadesed
———————
0OL ++ BIWOS
NVW1d 4008 GaSOd0ud
>
wd
‘930 Sb
4d) WV.
30 $930
p,bay sadjd-umop 9 sayn6 abue)
dA} TV.
30 21930
Page 27
8,000
Neautral or council approved
exterior wall colours over wproof
Texture coat finish on Core filled
concrete block walls
Parapet wail with Angled
wing & blade walls with w'proof
texture coat finish to macth walls.
Mesh Vents to match Garage.
or Timber Louvre Ventilation.
“ae ~ - - -_—- _ = _- ~_ - = _—- :
= Neautral or council Approved Colours
to 15deg. Pitched Colorbond roof sheeting,
fascia's, gutters and downpipes.
wT Ty Bier os Sa = ae eee
ae e ee
# so cally se “4 Mi Le 2
ol = bags He eg © LP o aatg e *
g é sé NS reer S as + : ee A awnings on struts fixed
“i x to wall beyond with
3 permeable natural finish.
8 . .
| Fu | = :
Bx. = = =e. — ‘
af ci : wa . Main Entry Gate
| a o
oO}
6]
“I
FLL. cw nee. Landscaping to council
requirements. Native Species
: wat Fees Ft to be used through-out.
8 natural ground level
3 9 Neautral coloured P/C Alumin.
STREET ELEVATION
SCALE 1:
gate & fencing
Neautral coloured Texture coat
finish to blueboard cladding
Drive-way Cross-over toc
council requirements
Neautral Paint finish or Stained or
Street Numbers, Name, Unstained Timber Vertical Paling fence
Letterboxes, Intercom & Light
Painted Steel Mesh Panel Lift Garage Doors,
Set back 400mm from wail face.
200mm H vents - painted steel mest
to match garage or timber louvre.
pic alumin. awningwindows
& sliding glass doors
2000 H rendererd block wall
common fence
natural ground level!
opening
NORTHERN ELEVATION
MIRROR REVERSE FOR
SOUTHERN ELEVATION
SCALE 1: 100
downpipes with rainheads
connected to council
stormwater system
glass block window / wall to laundry
p/c alumin. h'rail & balustrading between
low rendered block walls to balcony edge
FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER
SCALED MEASUREMENTS, VERIFY ALL ON SITE
DIMENSIONS AND LEVELS PRIOR TO THE
COMMENCEMENT OF ANY CONSTRUCTION.
CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY
OF ANY DISCREPENCIES.
BUILDER :
K) CONSTRUCTIONS.
QBSA Lic.No. 21815
fax ; (07) $447 1714
m : 0409 471 714
e: [email protected]
DESIGN / DRAWN :
Hl ROBERT PATTERSON
QBSA Lic.No. 1095554
DESIGN to DETAIL
KJ CONSTRUCTIONS
CLIENT
fax : (07) 5449 1899
m: 0401 394 964
es [email protected]
pool safe gate & fence
os . .
CL
8
5
NN
AFL —
Beer
= ZS a
2 po
ai >. SI ¢
XFL th IN. en a a ee Ys _—
compacted fill base ; —
concrete in ground
paved concrete steps swim pool shell
paved courtyard
DEVELOPMENT
APPROVAL
(NOT FOR CONSTRUCTION )
28-03-07
01-03-07
LOTS 1&2 AT 23 EDWARD ST,
NOOSAVILLE
PROPOSED DUPLEX at
JOB DESCRIPTION
DWC NO. 6017
Page 28
2 deg. raking kliplock roof to front wall
ae
15 deg. cfoond custom orb sheet roof
yw. d—.—. ae.
CL i
stone capping to block wall at balcony
5 LY
cs} + .
5 awnings on struts fixed
5 —— — Do to wall beyond
a AFL. ——— ee = ae eee
Bs oon TE SS Se SS SSS ee _— Le. _—
ore cl Ze =
gS fence beyond
a — - <_
selected pool fence &
; ate to side access
A - ooh g
FL. —_— z eee. —
compacted fill base
ak ---- ee Ne ee ee woe ee Le et eee ht ee —----——
© & natural ground tevel
oO paved steps down to pool area common fence wall
p/coated alumin. handrail & batustrading
concrete in ground over low block wall
WESTERN ELEVATION swim pool shell
@ SCALE 1: 100
J
p/coated alumin. doors & windows
bulkhead
taking wing walls
200 gap between roofs with louvre
4 _ oe Le. _ Cc — Fake walls _ oe. oe a or mesh vents to match garage doors
15 deg. c/bond custom orb sheet roof
cL . . | 8 deg. awning roof with painted
: : ; steel supporting struts fixed to wall
2
Q ae > awnings on struts fixed
a to wall beyond
3 SSS . =
_ t wo,
a AFL LL. cee He fA ee wee ei —- ae : ee we
Bx... aH Sf Ta ofp. Le ee : et aT Tees J--4--
oP Cl : -
- 2m H Stained Timber Paling Fence
oO
5
rs) é 2m H rendered block
aan boundary walls
FL. ee. | |. — Saul — _.— —- A il .
500mm H concrete block
+ compacted fill base —-—- ee _ eee ee ee — retaining wall
3 natural ground level 1
p/c alumin. handail and balustrading pi in H gate / f
painted steel mesh cladding to selected 2m H gate / fence
above & between rendered core filled panellift doors to allow
EASTERN ELEVATION tovtneonateenzn Mw toto ees
SEALE 1-10 | DEVELOPMENT
DESIGN / DRAWN : BUILDER : FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER A P P RO V, A L
ROBERT PATTERSON K} CONSTRUCTIONS SCALED MEASUREMENTS, VERIFY ALL ON SITE i (NOT FOR CONSTRUCTION )
QBSA Lic.No. 1095554 QBSA Lic.No. 21815 DIMENSIONS AND LEVELS PRIOR TO THE c 28-03-07
|| fax : (07) $449 1899 fax : (07) 5447 1714 COMMENCEMENT OF ANY CONSTRUCTION. K) CONSTRUCTIONS PROPOSED DUPLEX at LOTS 1&2 AT 23 EDWARD ST,
01-03-07
Preliminary
DESCRIPTION
DESIGN to DETAR 7 0401 394 964 m : 0409 471 714 CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY CLIENT JOB DESCRIPTION NOOSAVILLE
@ [email protected] —¢: [email protected] OF ANY DISCREPENCIES.
Page 29
care filled block party wall with kliplock or equal roof at 2deg. pitch
plasterboard on furring channels.
Fire rated wall to 80/90/90. 15 deg pitch to colorbond roofs
Extend block to u/side of roof sheeting, ;
sela with approved sealant. UNIT 2 UNIT 1 200mm H pop-up roof with
selected vent infill between roofs
raise walls around parents
ee. Pee ee ee ST pp en aa = = nn retreat to u/side of roof framing.
i I all bed rms & bath rms to have
= flat ceiling at 2700h
——, selected colerbond or stainless steel
ye : a ¥ (7 gutters on timber or colorbond metal
cl H lt profile fascia's
B1 Y B1 it raked soffits with exposed rafters
oO
eg BED 1 NSUITE ENSUIT BED 1 r :_ fall tited balcony to grates & rainheads
oi ( connected to stormwater system
Y Hy selected stone capping to top of balcony walt
3 4 Y
a a FL re | 4 4] pervious awnings
“| 9. ! Tepe oe ee ee = NS rendered face block walls externally.
3 cl H H €i plasterboard linings to internal face.
t ae {fixed on furring channels)
o| gS H ENTR
3 = DRY siraiR V1 STAIR ‘ORY { tendered block wall fence
Q
Beyond GARAGE — sevonp| (] BeYonD BEYOND] O ,
\ ( 1 water-tank built into
i i } fence line beyond
FLL | H N
: SS See : ieee
she eee ee nc ae -------
3 natural ground level
o
treated timber si concrete floor slab on Approx..4-500mm suspended concrete floor stab to
@ retaining walls under Deep approved compacted fill base first floor with selected linings over
fence ine SECTION A ae erate Secu! Dongs tenitearsceagn ne on le
water-tank built into SCALE 1: 100
fence line beyond
Auysu wing Wen lenucicu
hebal blocks
Awning roof at 8 deg pitch
stepped block
wall
PARENTS
2.700
8,000
300
7k 2.800
femfacte fill base
650
wee we a a ee er wr wr ww ew em ewer Sc ee ee ae ee ee ee ee
‘natutal ground tevel
water wall feature
glass block window / wall stairs beyond
SECTION GL seecetmigins srongnenuoon sen DEVELOPMENT
DESIGN / DRAWN : BUILDER : FIGURED DIMENSIONS TO TAKE PRECEDENCE OVER A Pp P ROVA L
ROBERT PATTERSON KJ CONSTRUCTIONS. SCALED MEASUREMENTS, VERIFY ALL ON SITE
(NOT FOR CONSTRUCTION )
QBSA Lle.No. 1095554 BSA Lic.No. 21815 DIMENSIONS AND LEVELS PRIOR TO THE
Lit fax : (07) 5449 1899 fax : (07) $447 1714 COMMENCEMENT OF ANY CONSTRUCTION. KJ CONSTRUCTIONS PROPOSED DUPLEX at LOTS 1&2 AT 23 EDWARD ST,
DESIGN to Dera, 20401 394 964 m: 0409 471 714 CONTRACTOR TO NOTIFY DESIGNER IMMEDIATELY CLIENT JOB DESCRIPTION NOOSAVILLE
er oben@designtodetallcomau —@: [email protected] OF ANY DISCREPENCIES.
Page 30
© $0147
oT
200 - $OWURO. SIRE
Spots 4 ‘exiaTine, HYDRAOLIC.
| SEeviee ~ SEWER Pairs ,
Page 31
To LAND USE SECTION FEES NOOSA | — . , RECEIPT TYPE SALE OF DOCUMENTS " Superseded Planning Scheme Documentation : 520 Copy of Permit/Approval Letter ‘ : 110 The Noosa Plan Documentation 7 411° APPLICATION FEES ° Material Change-of Use - Cesdrvet : Sconsisient ZSte- 521 Inconsistent . . ; 521 Assessment under Superseded Planning Scheme . : _ §2i . Modification to a Development Permit : 521 Extension of a Currency Period . . 521 Operational Works - Landscaping . §21 Bldg Work assessable against the Planning Scheme . 521 E LODGEMENT REVIEW / : ’ Half Hour , 522 — One Hour . : , _ §22 ADVERTISING : : Purchase Advertised Applications . 523 JETTIES . . . Jetty Application Fee =. oS : : 524 Jetty Bond: | 60° St (tH) BONDS. So , " Performance Bond : oo. . . - 50 SIGNS co a - Registration Fee , . : 222 ‘SEARCH FEE , oo . ‘ . Search of Land Use Section file . _ _ 112 / @ . Liquor Licensing Request Le . : 413 TOTAL $ ZA7O Name: KY Coc ec ttn “ADDRESS: ef [2B Corn revee He : oNwseuhi Sols FILENO: 7 | St DATE: 21] 7/09 RECEIPTNO: LE OS oO. _ Signature of TP Officer: P>) dae o AUTHORITY NO! ; : a, (3 (>eei/se7 | |
Page 32
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS — Details of Development FEE CALCULATION TOTAL FEES
Page 33
proposed existing building existing peraol
pergola
ELEVATION 1
Adon ET BUILT,
diuminium framed
windows
—— selected cladding
ELEVATION 2
ELEVATION 3
&
Os
megi neon nnn een gene =o
FLOOR PLAN
1:100
fea of Buiting
Addition 2.4 sq im -
Alt yeork to be carried out in accordonce with The Building
Code of Austrolic, Relevont SAA codes, & 7
qil dimensions to be varitied on ste prior to commencement
of cansteuction
af work shol comply with loco! cou:.:1 requements
%:
NOTE. Ail dimensions ore indicative only
ond are to be checked on site prios to
the commenceinent of ony construction.
Re shall be the responsibilty of th confroctor to ensure that
of work ig undertaken to ensure the structural stobilily of
the existing budding. Refer-ony unresloved support of lie
down deloi& to the designer or fo the engineer before commencing
OPEN COURTYARD
DINING
PLAN SHOWING EXISTING 4 PeoPosEeD
NEw SENER. HYORAUUICS.
ween
aluminium framed
windows
selected cladding
3600
5600
»
ELEVATION 4
FRAMING SCHEDULE
WALLS ~ EXTERNAL LOAD BEARING
70 x 35 studs at 450 centres, nol notched for bracing
2/70 x 35 top plates, 70 x 35 bottom plate
70 x 35 nogging, one row
WALLS, INTERNAL NON LOAD BEARING
70 x 35 studs of 450 centres, may be notched for bracing
70 x 35 top and bottom plates, and one row nogging
All lood bearing walls to be F8 seasoned Rodiota
Alt lintels to be F17 kilt dried hardwood
All non ioad bearing walls to be F5 seasoned Radiata
All framing to be in occordance with Tradac Timber Froming
Monudl w41n
_HYPZAVUe Notes .
INSTALL TEMPERING Devices To BOTH
VANUTY BASIN, TAPS 4 SHOES /BATH TAPS.
ALL NEL Wegkc TO ComPLy ts LocAL AutHOaty
HAVING JURISIIETION AND LITH REQUIZEMENTS
OP ALL RELEVANT AUSTZAUAN STANDAZDS.
PROPOSED ADDITIONS & ALTERATIONS TO EXISTING DUPLEX
UNITS AT 235 EDWARD STREET, NOOSAVILLE FOR K.T. MACKENZIE.
SECTION A
1:100
RECEIVED
31 OCT 2000
FRONT COUNTER
BUILDING PERMIT NO:..
ov esnonensausostaenvesaareedees
SANITARY DRAINAGE / PLUMBING
AND WATER SERVICE CHECKED BY
NOOSA COUNCIL PLUMBING SECTION
of quenaiond inc.
No. 247
20091-1
OFFICER
A.J. &P.E.SMITH
DRAFTING & DESIGN
PO 80x 257.COOROY 4563
07-5447—701)
Prion
ayn
SANDERS
Tony
Lie.
DATE:
0?7~$447—7310
07-5484--3463
Singh Le. No.
16/10/00
. AMAMOOR 4570
65540
undet {248GA Act 1991.
DRAW:
ASS.
Puan
Open
USING
Arnoe
Used in these records
07/0567 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.