Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

07/0567 - MCU - Multiple Housing Type 2 Duplex [As Published] · 132007.567

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 4997 IDAS Assessment Checklist, Version 19.0, 2 March 2007

integration of fand use and public |22. The application involves: (tick the applicable bowes)—
transport

 

 

For more information refer to Guide 23, schedule (Wi) a material change of use assessable against the planning scheme for a purpose
8A of the IPA, & scnedule 2 of lhe iP Regulation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the - schedule.
application triggers referral to QT as a
concurrence agency. Oi reconfiguring a lot—
: LJ {@) ‘on land that is completely or partly within a public transport corridor, and the
total number of tots increases; ~<
OJ (b)  ontand that is completely or partly within a future public transport corridor or
an airport's public safety area; <
[4 (c) _ on tand that is within 400m of a public passenger transport facility or a future: |
public passenger transport facility, and the total site area is 5000m? or greater;
(CO @) fora residential purpose within the 25 ANEF contour for an airport; «
{V(e) for aresidentiat purpose resulting in 100 or more allotments. ><
© (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
5 above, on land that—
[J (a) _ is completely or partly within a public transport corridor or a future public
transport corridor; = x
C1 (b) wilt result in work that encroaches into an airport's operational airspace. .<
raw) none of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guide 23, schedule C1 @ a material change of use assessable against the planning scheme for a purpose
SA ot the IPA & Schedule Zolthe EReaulaton mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that @
Unless you answered “none of the above’, the
application triggers referral ta QT as a schedule.
concurrence agency. LD (ii) reconfiguring a tot—

C1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(J (b) on Jand that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater, 6
C1 (¢) _ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases; ~
[1 (d) on land that abuts rail corridor land, commercial corridor land or future railway
- fand and an easement abutting the corridor or future railway land is created: ~
Cle) ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases; | *
[CO (f) for a residential purpose resulting in 100 or more allotments. < °
C1 (ii) operationat work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m?, on land that—
(1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure; <
( (b) is completely or partly within future railway land, or a sailway tunnel easement; @
LJ {c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary. <
A) none of the above.

 

Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 20K the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es}—
vnesen answered “none ofthe abovet. th (1 (i) a material change of use assessable against the planning scheme and not associated
in| u answered “hone ve", the , . " .
application riggers ceferral othe holder of with reconfiguring a lot, and any structure or work will be located wholly or partly in the
_ pipeline licence No 1 issued under the Petrofeum easement.
At 1823, oureity Sanios QNT. Pay Lt, fo OO (i) reconfiguring a lot
vice,

C1 (ii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

[>¥(iv) none of the above.

 

 

Page 8

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0567 - MCU - Multiple Housing Type 2 Duplex [As Published].pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.