Council archive · source document
07/0567 - MCU - Multiple Housing Type 2 Duplex [As Published] · 132007.567
INTEGRATED PLANNING ACT 1997
Works that take overland flow water
The relevant wild river declaration wid state.
works that take overland flow waler are either
Self assessable or assessable, of are exempt
from wild river requirements.
Hf you ticked Q13 i}, your appfication must be
assessed by NRW against the Wild Rivers Code
+ and must comply with the code.
I you ticked Q13 ii} an application is not required
to be made however the works must comply with
the relevant seif-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
“is required and must be assessed by NRW
“against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q13 ili) your application is not
Subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessabie or
exempt will not be accepted. . .
13,
IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
/ [MiNio [AYES (ensue you have completed Part Ke of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
(J i) assessable works
Lil self-assessable works
LD ii) exempt works
Works that interfere with overland
flow water
The relevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.
Ifyou ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
tf you ticked Q15 ii) an application is nat required
to be made however the works must comply with
the relevant sell-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code,
MW you ticked Q15 iii) your application is not
subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
Does the application involve works that interfere with overland flow water in a FMA?
NO (21 YES (ensure you have completed the relevant Part K of Form 1)
If YES, is the application for works stated in the relevant wild rivers declaration to be?
(Zi) assessable works
[71 ii) self-assessable works.
(1 iii) exempt works
Waterway barriér works
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES {0 Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
16.
Does the application involve building or raising waterway barrier works in a PA?
[io (CI YES (ensure you have completed Part Os of Form 1)
Aquaculture (non ERA)
Applications for aquaculture in a HPA will not be
accepted.
If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve aquaculture ina PA?
fio O YES (ensure you have completed Part O: of Form 1)
Works that interfere with water in a
watercourse
Note: If the development is propased in a HPA,
applications for all works that interfere with water
in @ watercourse (including dams or weirs,
‘stream realignment or stream diversion) will not
be accepted.
In a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
if you ticked box i) in Q19, your application will
not be accepted. :
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
Fiver requirements.
More information and locations of nominated
waterways is available by conlact NRW,
accessing the department's website
‘Www.nrw.qld.gov.au or contacting the
department by email on:
wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
0 (J yes (ensure you have completed the relevant Part K of Form 1)
If YES, .
(i) The application is for an instream dam or welr, or
(J ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0567 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.