Operational work that is tidal work or {9. The application involves operational work that is: ( tick the applicable boxes)
work in coastal management district my ge . .
For more information refer to Guide 18. For (1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
mare information about prescribed fidal work in Coastal Act) that is not prescrived tidal work - complete Part M of Form 1; OF.
local government tiga areas refer to Guide 24 LD (ii) tidal work that is prescribed tidal work" other than in a canal"? -complete Part P of Form 1; 0r
ne ophaien een ete? 08. Di fii) carried out within a coastal management district under the Coastal Act and for - complete
Environmentat Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (j) below are ticked.
If an agency other than EPA is the assessment (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
a ee ecenin other than those works in tidal water) where the development has been determined not
relation to this matter. to be assessable against the Water Act 2000 ;
Local government is the assessment manager : (1 (b) constructing a canal? intended to be connected to tidal waters;
i prescribed tidal work. a “es
{or €l presea : ™ LC (©) constructing an artificial waterway:
(1) reclaiming land under tidal water; .
Le) disposing of dredge spoil or other solid waste material in tidal water,
1 (f) interfering with quarry material on State coastal land above high-water mark;
(1g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
[(h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(7) (i) constructing a bank or bund wall to establish a ponded pasiure on land, other
we than State coastal land, above high-water mark; or ‘
(i
iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable boxes)
, re rm information eter to Guide 18, For (1 (i) tidal work's as defined under the Coastal Protection and Management Act 1995 (the
moe information about prescribed fidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
local government tidal areas refer onrnad (71 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; oF
Unle: answered “none of the above” to pon . wae ge
10, the application riggers referral io C (ii) carried out within a coastal management district'S under the Coastal Act and for -
Queensiand Transport (QT) (Marilme Safety [1 {@) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Qig) as a concurrence agency. .
Local government Is the assessment manager M of Form t “ .
for all prescribed tidal work. (1) (b) reclaiming land under tidal water - complete Part M of Form nor *
CI) constructing a canal", if the canal is associated with reconfiguring a lot - compiete
Part M of Form 1; ~ -
iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more information refer to Guide 18. C(i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above” to work carried out completely or partly in a coastal management district'5_-
Q11, the application requires assessment by the . . - 7 . ~ a
Environmental Protection Agency (EPA). Ci (i) a material change of use assessable under a planning scheme involving building
{fan agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is. -
manager for the apptication, EPA is a
concurrence agency for the application in + the construction of a new premises with a GFA'® of at least 1000m?_ ><
‘elation to this matter. « the enlargement of the GFA of existing premises by more than 1000m2 a
completely or partly in a coastal management district x
C1 (iv) reconfiguring a jot’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal'? - complete Part M of Form 1 °y¢
aw none of the above
LD (ii) reconfiguring a tot assessable under schedule 8 of the IPA where the land is situated e@
10 Tidal work is defined In sch 10 of the IPA. : :
11 Prescribed tidal work is defined in the Coasta! Protection and ‘Management Regulation 2003 and includes certain tidal works completety or partly within a local government tidal area.
12 Canat means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district Is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} of that Act. . . :
16 GFA is defined in sch 14 of the IPA t mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is belag assessed.
17 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is assoctated with the construction of an artificial waterway, must be
accompanied by the applicaton for the operational works fo construct the artificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0567 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.