Council archive · source document
RS-050
Plans and drawings: the text below has words only, no drawings.
Text sections not matched to the original PDF pages. See original document to check page numbers.
ai —2 £8
HEIGHT ABOVE a
OF CHANNEL (
Control joint
300 1500 1500 1500
Kerb invert min PT Garage/
Carport slab
_—re ee = — 1500min Slope may vary
[Tv Road surface c 1500 refer note 13 900 refer note 12 4 ink
Laz f Tension = Path zone _
—_—
1 in 40 1 in 20 4 in_&
Reinforced SL72 fabric min ® \ in 8 1 in 20 lin 4 | 1500
<
Roll under Garage/
Sand blinding layer 50 max Carport slab
Galvanised/stainless Saw cut all kerbs to Control joint Control joint
steel dowels 400 long allow clean removal of (If required)
R16 @ 450 centres back of kerb and
channel
BREAKOUT TYPE TYPICAL PROFILE DRIVEWAY ACCESS
SECTION A SECTION B
Refer drawing Refer drawing
RS-049 RS—049
NOTE
| All appropriate permits must be obtained from relevant council, specifying crossing type 13 Path zone width may vary to match existing concrete pathways and verge profiles
construction materials location levels, surface finishes and dimensions, prior to any excavation Path earthworks adjoining concrete must be well compacted
2 Alternative materials for construction, other than reinforced concrete refer to relevant council 14 Earthworks cut and fill batters from edge of driveway or path to natural surface to be
for approval maximum grade at 1 in 10 and fully turfed prior to council inspection
Crossing to be constructed square to the street alignment, wholly contained within the site 15 Existing path to be longitudinally transitioned to new driveway at a maximum grade of 1 in 10
frontage from invert of channel to property boundary 16 Plain concrete surfaces to be heavy broom finished
One access to be constructed per allotment unless otherwise approved by relevant Council 17 Decorative surfaces are subject to relevant council approval, where approved, to have a 5mm
To reduce impact on available street parking, consideration is to be given to visitors and max depth variation in the finished surface profile. All finished surfaces of driveways are to
neighbouring property s parking needs when selecting a crossing location comply with the requirements of AS/NZS 3661.1 slip resistance of pedestrian surfaces
Crossing to be located clear of existing gully pits. where this cannot be achieved, the gully pit Exposed aggregate finish subject to relevant council approval due to environmental reasons
and pipework may be relocated at the property owners expense, subject to approval of the 18 Expansion joints to be 10mm thick full depth closed cell cross linked polyethylene foam (85 —
relevant council 150 kg/m), or 8.5mm thick bitumen impregnated compressed granulated corkboard, installation
Crossing to be located clear of all service authority s fittings, manholes and pits. Subject to to manufacturers instructions. Seal surface of joint with a suitable polyurethane sealant
relevant Council approval, where this cannot be achieved, existing service pits are to be 19 Concrete surface tolerance to be +5mm
over 3 metre sections
-0mm
contained within the area of new driveway, pit surface to match approved driveway finished 20 Concrete to be minimum grade N32 in accordance with AS 1379 and AS 3600
levels 21 Concrete construction to comply with the requirements of AS 3600, concrete code
Kerb adaptors and associated roofwater drainage to be located clear of vehicular crossings 22 Reinforcement fabric to AS 1304, 50 top and edge cover, lap fabric 250
Council will not relocate traffic islands or provide breaks in traffic islands to allow driveway 23 Control joints are to be sealed with a low modulus self priming sealant to the manufacturers
access specification. refer RS—065
10 For water sensitive urban design verges, the vehicular crossing is subject to relevant council 24 Formwork and reinforcement shall be in place and inspected and approved by the relevant
design and approval council prior to placement of concrete
11 **Driveways must achieve a high point of 250mm above invert of kerb to ensure stormwater is 25 Maintenance of the crossings are the responsibility of the property owner
contained within the road reserve as per requirement of Q.U.D.M. (Queensland Urban Drainage 26 Drawing to be read in conjunction with RS—049
manual). This constraint may be varied upon the approval of the relevant Council 27 Cross fall of existing pavement adjacent to the driveway to be checked. If cross fall exceeds
12 Under special circumstances Council may approve a rising grade of 1:6 max or falling grade 5%, relevant Council will decide if driveway needs to be re-designed to ensure satisfactory
of 1:20 min Longitudinal grades along property boundary must allow for free drainage and clearance for vehicles
pedestrian safety 28 All dimensions are in millimetres unless shown otherwise
These drawings have been developed in consultation between the participating Councils
BEFORE USE, the user shall confirm that the drawing has been adopted by the appropriate Council
HE} 06/14 | Review DRIVEWAYS
re T06710 INSTITUTE OF PUBLIC WORKS ENGINEERING AUSTRALASIA RESIDENTIAL DRIVEWAYS RS—050
B88 be SSE STANDARD DRAWINGS PLAN 2 OF 2
06/09
Peel bare RSSSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RS-050(PDF, 103KB)Related documentPublic source context ↗
3705de43-3225-402d-b261-e17b6ddf7a81Related documentPublic source context ↗
sd-roads-rs-050Related documentPublic source context ↗
RS-050 Driveways - Residential Driveways - Plan 2 of 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 105 KB (small file)
- File type
No other editions are linked here.