2212-32645 SRA_Response with conditions__MCU22-0207_OPW22-0314

Attached to the e-mail MCU22/0207 and OPW22/0314 - SRA application correspondence - SARA referral agency response—24 Wesley Court, Noosa Heads.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                    2212-32645 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)


 No.     Conditions                                                                     Condition timing
 Development Permit – Operational Works
 Schedule 10, Part 17, Division 3, Subdivision 2, Item 1 – Tidal works or work within a coastal
 management district. The chief executive administering the Planning Act 2016 nominates the Director-
 General of the Department of Transport and Main Roads to be the enforcement authority for the
 development to which this development approval relates for the administration and enforcement of any
 matter relating to the following conditions:
 1.      The works must be carried out generally in accordance with the                 For the duration of
         following plans:                                                               works.

              (a) plans prepared by Lindsay Consulting dated 16/02/2023,
                  reference 22-0632-F3, revision B.
 2.      Internal user note: this condition applies for lighting during                 For the duration of
         construction and operation.                                                    works and for operation
                                                                                        to be maintained at all
              (a) Light/mark all vessels, structures, plant and equipment
                                                                                        times.
                  associated with:
                  i.       the works, in accordance with the following
                           specifications:
                           - any anchors deployed must be marked with
                               yellow buoys and fitted with FL yellow lights
                               fitted.
                  ii.      operations, in accordance with the following
                           specifications:
                           - provide pedestrian style lighting for jetty or
                               retroreflective tape to outer beacon pile or jetty
                               face
              (b) Lighting provided must not obscure, disguise or otherwise
                  interfere with the safe navigation of other vessels, including
                  the effectiveness of navigational lighting.




 State Assessment and Referral Agency                                                                   Page 3 of 6
Log in to download the original file

2212-32645 SRA_Response with conditions__MCU22-0207_OPW22-0314.pdf · 230 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.