Skip to the record
Every meeting, every word.

Original source · versioned page text

RFI - Attachment 2- Technical Memorandum

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

             Indicative Masterplan Access Locations




Source: Nearmap

The access types are summarised in Table 4-1.
             Indicative Masterplan Access Types
 Lot Access Type          Lots                            Permitted Movements
 Single Lot Access        4, 14, 15, 16, 21               All movements permitted, median break provided where
                                                          suitable.
 Shared Lot Access        2, 5 & 6, 10 & 11, 12 & 13,     Lot 2: Shared access with existing crossover to prevent
                          17 & 18, 19 & 20, 22, 23 - 25   conflicts with existing right turn lane
                                                          Lots 5 & 6: All movements permitted, provisions for turning
                                                          to be determined at detailed design
                                                          Lots 10 & 11, 12 & 13: All movements permitted
                                                          Lots 17/18, 19/20: All movements permitted, median break
                                                          provided on Hofmann Drive where suitable.
                                                          Lot 22: Shared access with existing crossover to prevent
                                                          conflicts with adjacent intersection
                                                          Lots 23-25: Additional all movements access via Walter Hay
                                                          Drive at roundabout. More detail at section 6.
 Restricted Lot Access    3, 7, 8 & 9                     Lot 3: Left in ,right out in interim stage with stub road
                                                          arrangement
                                                          Lot 7: Left in, left out access in interim stage
                                                          Lots 8 & 9: Right in, left out in interim stage with stub road
                                                          arrangement




QTT19017 Tech Memo 2019 04 23.docx                                                                                Page 8
Log in to download the original file

RFI - Attachment 2- Technical Memorandum.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.