Original source · versioned page text
RFI - Attachment 2- Technical Memorandum
6.3 SIDRA Analysis Results
The current configuration of this intersection is a three-legged roundabout arrangement, however has been
assessed with a fourth leg as the north-east approach for the proposed lot access road.
Two scenarios were assessed for the impact to the existing roundabout. Initially the traffic generation from
Lots 23, 24 and 25 were added to the background traffic (existing level of development at Noosa Civic) and
additionally a scenario where the whole masterplan was developed (lots 1-25). The impacts of these
scenarios are reported below.
The SIDRA assessed layout is illustrated on Figure 6-1.
SIDRA Assessed Layout
The results of the SIDRA assessment, for all assessed scenarios, are summarised in Table 6-3.
SIDRA Results
Saturday AM Peak Thursday PM Peak
Scenarios 95th %ile 95th %ile
DOS Delay DOS Delay
Queue Queue
2020BG + Lots 23-25 0.312 13.8 sec 12.7m 0.291 13.6 sec 11.4m
2020BG + Full Dev 0.325 13.9 sec 13.5m 0.381 14.5 sec 16.8m
2030BG + Lots 23-25 0.352 14.2 sec 15.1m 0.323 13.9 sec 13.5m
2030BG + Full Dev 0.365 14.3 sec 16.0m 0.416 15.0 sec 19.4m
QTT19017 Tech Memo 2019 04 23.docx Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.