Environment Management Plan Stage 2_Grasstree Court July 2021
The original of this document is very large (10.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEcological Management Plan – Grasstree Court – Lot 9
REHABILITATION MANAGEMENT PLAN – Stage 2
Prepared for Blue Care
Grasstree Court, Sunrise Beach, Qld, 4567
Lot 9 SP 252905 {& Lot 6 RP 901384}
1. INTRODUCTION
The primary objective of the rehabilitation management plan (RMP) is to establish a “rehabilitation program”
(vegetation offset proposal) that provides for a good ecological outcome by re-establishing habitat elsewhere in the
nearby locality.
For the purposes of the RMP, the subject land is the site to be cleared (approved development land) while the
rehabilitation site is the receiver site (land to be rehabilitated).
The receiver (rehabilitation) has been identified within the Girraween Sports Complex and Nature Refuge located at
100 Eenie Creek Road; Noosa Heads (off Wallum Lane), formally known as Lot 1 on SP239726 (FIGURE B1 – Receiving
Site Landscape).
Two treatment areas (T1 and T2) have been considered in consultation with Council (FIGURE B2 – Receiving Site
Treatment Areas).
Stage 1 of the development encompasses some 0.8ha of clearing and available soil/seed material (associated with Lot
6). Stage 2 includes the balance of the rehabilitation area and is associated with Lot 9. Stage 1 works was initiated in
April 2021 and described further below. While some rehabilitation activities have been completed as part of Stage 1,
the actions are retained in this plan for completeness.
2. SITE TREATMENT AND TRANSFER METHODS
2.1 Overview
Stage 1 (Lot 6 clearing and initiation of the rehabilitation exercise) is ongoing. As part of the Stage 2 rehabilitation
exercise, topsoil and subsoil containing the seed bank of the vegetation within Lot 9 will be scraped off post clearing
and mulching of all above ground vegetation. The live soil will be transferred via trucks to the receiver site.
Vegetation clearing for the subject land is described in the VFMP. The receiver site has been prepared as part of Stage
1. All vegetation on Lot 9 will be cleared and mulched prior to lifting out live topsoil and subsoil. All works will comply
with the conditions of the operational works approval and the VFMP.
Stage 1 works completed/ongoing as follows:
Step Action
1 Clear entire offset site. Mulch, strip and stockpile all top layers and weed material.
2 Install main infrastructure e.g. haul/access roads, irrigation water line from treatment plant, water tanks.
Provide weed treatment to entire receiver site after clearing, i.e. spray all weeds as they germinate for four
3
weeks prior to seed soil being moved to site.
4 Site soil from Lot 6 transported and installed into the northwest/west corner (0.8ha).
5 Plant she-oak tubes and other trees.
6 Install monitoring points.
7 Ongoing weed management.
22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.