Log in to see the plans as drawn Ecological Management Plan – Grasstree Court – Lot 9
Shed/Site storage area
Stage 1 Rehabilitation Area
FIGURE B4 – Receiving Site Set-out
Stage 1 area = green dashed outline denotes indicative area for establishment of soil
Stage 2 area = balance site
NOTE:
• areas and locations indicative
• updated in June 2021 following discussions with Council and Stage 1 progress
• white dashed line indicates general location of vine to be treated separately
• initial clearing for Stage 1 completed
• original plan (2018) by Arborcare
33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.