Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Environment Management Plan Stage 2_Grasstree Court July 2021

of 37

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Ecological Management Plan – Grasstree Court – Lot 9

2. STRUCTURE AND RESPONSIBILITY OF THE MANAGEMENT PLAN

The measures to be implemented to achieve the conditions of approval and appropriate ecological outcomes
are provided in two separate attachments, as follows:

Appendix A - Vegetation and Fauna Management Plan (VFMP) – Stage 2
   • Activities on subject land prior to and during clearing, including appropriate management of fauna

Appendix B – Rehabilitation Management Plan (RMP) – Stage 2
   • Management of subject land and rehabilitation of the offset site

The relevant Council (i.e. 12-20), and State (i.e. DERM 1-16) approval conditions associated with ecological
matters are identified in the Table 1 and 2 respectively, with corresponding Section/Attachment provided for
reference. Note that many of the DERM conditions simply require confirmation and no specific measure/action
within the VFMP or RMP.

The acceptable implementation of the VFMP and RMP will be the responsibility of contractors engaged by
Lendlease.

Due to the nature of the Council and State approval conditions, and for completeness, some sections are
repeated in both the VFMP and the RMP.




                                                                                                          3
Log in to download the original file

Environment Management Plan Stage 2_Grasstree Court July 2021.pdf · 10.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.