Original source · versioned page text
Appendix 2 - Code Assessment
Infrastructure PO51 Compliant Development is supported by adequate infrastructure and No acceptable outcome provided The subject site has access to reticulated water, sewerage, urban services including reticulated water, sewerage, stormwater drainage, sealed roads, pathways, electricity stormwater drainage, sealed roads, pathways, electricity and and telecommunications infrastructure. telecommunication infrastructure. PO52 Compliant Development does not adversely impact on the continued No acceptable outcome provided The proposed development does not adversely impact the operation, viability and maintenance of existing continued operation, viability and maintenance of existing infrastructure or compromise the future provision of planned or future infrastructure. infrastructure. Ref: 204099.T003 Page 16 214 David Low Way PEREGIAN BEACH QLD 4573
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.