Original source · versioned page text
Appendix 2 - Code Assessment
Water management
PO6 AO6 Compliant
Waste storage areas are designed to contain and The waste storage area is constructed of impermeable and The proposed waste storage area will be connected to
appropriately dispose of leakage from bins and wastewater durable surfaces and: sewer for appropriate drainage.
from bin washing. a) is bunded and graded so that washwater and bin
leakage are drained to the sewer or an on-
site effluent disposal system via a gully within the
storage area;
b) has a bund wall with a maximum height of 100
millimetres;
c) is serviced by a conveniently located hosecock and
backflow prevention device, and connected to a
water supply; and
d) is roofed or otherwise covered if the storage area
is—
(i) more than 1m²; or
(ii) storing wet waste; or
(iii) storing other waste with a high potential to
cause pollution if washed or leaked from the
bins, including waste oil or putrescibles.
Safety and protection of infrastructure when demolishing or removing buildings
PO7 AO7.1 Compliant
Demolition, removal, relocation or associated works do not Infrastructure including reticulated water, sewerage, All services and infrastructure will be protected during
result in: stormwater, and electricity are protected from damage demolition and construction.
a) 'live' or 'active' infrastructure that may present risk to and made safe to the standard required by the regulatory
people using the site or surrounding areas; or authority.
b) damage to infrastructure or other works.
AO7.2 Compliant
Editor's note— An approval will be required from Infrastructure is disconnected, capped or sealed including: Infrastructure will be disconnected when required during
Council's Building and Plumbing Services for decommissioning a) electricity meters are removed and electrical wires demolition and construction.
plumbing apparatus including: disconnected;
a) sanitary drains or reticulated water supply; and b) telephone lines are disconnected; and
b) septic tanks, holding tanks or on-site treatment systems. c) data cables are disconnected and removed.
AO7.3 Compliant
A temporary crossing is provided to protect road Where required, temporary crossing will be installed during
reserve infrastructure including kerb and channel. construction.
AO7.4 Compliant
Any damage to footpaths, street plantings, Any damage to footpaths, street planting, natural
natural vegetation, kerb and channel, bridges or vegetation, kerb and channel and roadways during
roadways at the removal site, the new site or between demolition and construction will be repaired or reinstated.
Ref: 204099.T003 Page 3
214 David Low Way
PEREGIAN BEACH QLD 4573
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.