Stormwater Management Plan (Quantity)

Attached to the e-mail Doonella Stage C (Email 6 of 7) Stormwater Management Plan - OPW14/0197.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
From: Denis Wallace [mailto:[email protected]]
Sent: Wednesday, 20 March 2013 12:21 PM
To: Sian Davis
Cc: Kerri Coyle; Conor Neville; Mark Lewis; Leon Rowlands; Rob Sewell
Subject: RE: Doonella - Stormwater Dicussion

Sian,

I’ve been able to get internal feedback on the material you’ve provided, which may allow us to
proceed with the change process.

Of the SWM options you’ve submitted, only Option 3 was presented as viable and doesn’t appear to
provide significant benefits over the original proposal in regard to soil hydrology and impacts on
existing vegetation. On this basis, council would be willing to amend the approval(s) to allow for the
originally proposed Dodonaea detention area, provided we can also do the following:

    -   Allow for fauna passage, including a fauna underpass;
    -   Rehabilitate the fauna corridor area post construction in relation to the construction
        disturbances and the changes to the soil hydrology and vegetation that will result from the
        detention area;
    -   Obtain an Op Works revegetation / rehabilitation approval for the above.

I assume you would be agreeable to this option but let me know if you have any concerns or if there
are aspects I haven’t addressed.

Regards

Denis Wallace | Senior Development Planner
Regional Strategy & Planning I Planning Assessment - North
Sunshine Coast Council

Phone: 07 54495179
Email: [email protected]
Website: www.sunshinecoast.qld.gov.au
Mail:    Locked Bag 72 Sunshine Coast Mail Centre Qld 4560
Log in to download the original file

Stormwater Management Plan (Quantity).pdf · 4.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.