Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Form 1 - Development application details - 125 Cooroy Belli Creek Rd, Cooroy

of 12
   10) Subdivision
   10.1) For this development, how many lots are being created and what is the intended use of those lots:
   Intended use of lots created               Residential              Commercial              Industrial               Other, plga^e specify:


   Number of lots created

   10.2) Will the subdivision be staged?
   □ Yes - provide additional details below
   □ No_________________________
   How many stages will the works include?
   What stage(s) will this development application
   apply to?


  11) Dividing land into parts by agreement - how many parts are being created and what is the intended use of the
      parts?
   Intended use of parts created              Residential              Co      iercial         Industrial              Other, please specify:


   Number of parts created

   12) Boundary realignment
   12.1) What are the current and proposed areas for each lot comprising the premises?
                                Current lot       /                                                         Proposed lot
   Lot on plan description              Area^-fn2)                            Lot on plan description               Area (m2)



   12.2) What is the reason for the boundary realignment?



  13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
  (attach schedule if there are more than two easements)
  Existing or                Width (m)        Length (m)       Purpose of the easement? (e.g.                      Identify the land/lot(s)
  proposed?                                                    pedestrian access)                                  benefited by the easement




Division 3 - Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
  14.1) What is the nature of the operational work?
  □ Road work                                              □ Stormwater                           □ Water infrastructure
  □ Drainage work                                          □ Earthworks                           □ Sewage infrastructure
  □ Landscaping                                            □ Signage                              □ Clearing vegetation
  KI Other - please specify:
  14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
  □ Yes - specify number of new lots:
 '0JMo




                                                                                                                                Queensland
                                                                                                                         Hr Government

Log in to download the original (Form 1 - Development application details - 125 Cooroy Belli Creek Rd, Cooroy.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.