Original source · versioned page text
2014-03-25 Planning & Organisation Committee Agenda Pages 15-38
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
Page 36 of 231
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
- staged progressive rehabilitation of the site as quarrying operations cease
on each face of the quarry;
- site preparation;
- weed removal and control;
- species ‘palettes’ and schedules;
- planting out procedures for rehabilitation purposes and horticultural
requirements;
- mulching procedures;
- fertilising procedures;
- irrigation and watering procedures;
- enhancement of environmental linkages and corridors;
- on-going maintenance;
- perimeter fencing design and location.
The Landscape Master Plan shall be consistent with Planning Scheme Policy
No. | — Landscaping Guidelines, and will primarily utilise native species that
have been recorded on the site. Landscaped areas shall be integrated
floristically and structurally with the surrounding native vegetation.
4. The Environmental Management Plan shall incorporate the requirement for
annual environmental compliance monitoring and annual audit reports to be
submitted to Council for the operation of the development. The format and
content of these reports shall demonstrate compliance with the Management
Plan and Consent Order and include a written discussion of the results and
recommend any necessary actions.
5. An Environmental Management Plan (EMP) shall be prepared and
implemented to ensure that the impact of the development on the environment
is minimised and that the environmental values of the site are protected and
enhanced. The Environmental Management Plan is to address the
implementation of the requirements of the ecological restoration plan, sediment
and erosion control plan, water quality management plan, landscape master
plan; and address all other environmental considerations deemed relevant to the
approved use and local environment, in order to minimize environmental harm
and provide for progressive self-sustainable landscape/ecosystem _ re-
habilitation. The EMP should be prepared to a standard necessary to meet
Council requirements and recognized industry standards. The EMP is to:
e Comply with AS00014.
e Demonstrate a high level of environmental care and responsibility and be
consistent with best practice for developments of this type in similar
environments.
Page 36 of 231See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.