Attachment 1 [OCR of page images] Attachment 1 In the Planning and Environment Court No 314 of 200 Held at: Maroochydore Between: JOHN HARDING, JOHN FORTH, Appellants ADRIENNE FORTH, JOAN ALEXANDER, IAN BENNETT AND PETER MOON And: SUNSHINE COAST REGIONAL COUNCIL Respondent And: COOROY MOUNTAIN SPRING WATER Co-Respondent PTY LTD ACN 053 498 285 JUDGMENT Before His Honour Judge Dodds Date of Hearing: 2 August 2010 Date of Judgment: 2 August 2010 THIS MATTER HAVING on this day come on for hearing by way of an appeal against the Respondent’s approval of a development application for a Development Permit for a Material Change of Use (Resource- Based Spring Water Bottling Plant) in relation to Land at 314 Cooroy Mountain Road, Cooroy and also described as Lot 2 on SP 143409. IT IS ADJUDGED that the appeal be dismissed. Filedon 06.06 . xnJ0/Q Filed by: Connor O’Meara Solicitors Service address: Level 5, 370 Queen Street, Brisbane 4000 Phone: (07) 3221 3033 Fax: (07) 3221 6661 JUDGMENT CONNOR O'MEARA » Filed on behalf of the Co-Respondent Solicitors Level 5, 370 Queen Street BRISBANE 4000 Phone: 3221 3033 Fax: 3221 6661
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 31 pages
Page 2
WB a
In the Planning and Environment Court No 318 of 2008
Held at: Maroochydore
Between: COOROY MOUNTAIN SPRING WATER Appellant
PTY LTD ACN 053 498 285
And: SUNSHINE COAST REGIONAL COUNCIL Respondent
And: JOHN HARDING, JOHN FORTH, Co-Respondents by
ADRIENNE FORTH, JOAN ALEXANDER, Election
IAN BENNETT AND PETER MOON
JUDGMENT
Before His Honour Judge Dodds
Date of Hearing: 2 August 2010
Date of Judgment: 2 August 2010
THIS MATTER HAVING on this day come on for hearing by way of an appeal
against the Respondent’s approval of a development application for a Development
Permit for a Material Change of Use (Resource- Based Spring Water Bottling Plant)
in relation to Land at 314 Cooroy Mountain Road, Cooroy and also described as Lot 2
on SP 143409.
UPON the Court being satisfied that the changes to the plans of development are
“minor” within the meaning of section 4.1.52(2)(b) of the Integrated Planning Act
1997 as amended by sections 821 and 350 of the Sustainable Planning Act 2009.
IT IS ADJUDGED that:
1. the appeal be allowed in part;
2. the changed application be approved subject to the amended conditions
attached hereto and marked “Attachment A”;
AAaN ARS JUDGMENT CONNOR O’MEARA
4 AS milly: Filed on behalf of the Appelia nt Solicitors
g Form PEC-7 : Level 5, 370 Queen Street
BRISBANE 4000
Phone: 3221 3033
Fax: 3221 6661
Page 3
» 3. there be liberty to apply. Filedon Olo. D06- SOr1WO Filed by: Connor O’Meara Solicitors Service address: Level 5, 370 Queen Street, Brisbane 4000 Phone: (07) 3221 3033 Fax: (07) 3221 6661
Page 4
__ _ Attroerct “A _ ~ o oe . . _. 1 APPLICATION DETAILS Application No: 2006/268 Street address: 314 Cooroy Mountain Road, Cooroy Mountain Real property Lot 2 SP 143409 description: Planning Scheme: The Noosa Plan 2 RELEVANT PERIOD OF APPROVAL The relevant period for this Development Approval is identified in the Assessment Manager conditions. 3 ASSESSMENT MANAGER CONDITIONS Land Use 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered SKO1 and SK02 dated 2 August 2010and as may be amended by these conditions. 2. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, tighting nuisance or other emissions. Vehicle and Truck Movements 3. All vehicles associated with the use shall travel to the site via the western end of Cooroy Mountain Road. 4 -. 5. -. 5A. Trucks are not to arrive at or leave the premises outside the hours of 7:00 am to 6:00pm Monday to Friday. 5B. Prior to the Council completing the staged upgrade works to Cooroy Mountain Road, weekly Trucks shall be limited as follows: (a) 40 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying water but excluding B-Doubles) per week; (b) 20 ancillary trucks (namely non-articulated trucks and non-water carrying trucks). 5C. After the Council has completed the staged upgrade works to Cooroy Mountain Road, weekly Trucks shall be limited as follows: (a) 50 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying water but excluding B-Doubles) per week; (b) 25 ancillary trucks (namely non-articulated trucks and non-water carrying trucks). Note: The road upgrade referred to is the upgrading of the remaining 2.2 kilometres of Cooroy Mountain Road to provide two (2) 3.5 metre wide traffic lanes with a 1.0 metre wide sealed shoulder to a total formation width of 9.0 metres. It is envisaged that the upgrade works to Cooroy Mountain road will be completed in the financial year 2012/2013. 5D. Truck drivers will comply with the requirements of the “Truck Drivers Code of Conduct” dated 2 August 2010 which requires, amongst other things but is not limited to: 10f8
Page 5
(a) the use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road be prohibited except in case of an emergency (i.e. safety requirement); (b) Maximum speed on Topaz Street and Cooroy Mountain Road to be 60 km/hr. Hours of operation 5£. The hours of operation for the use are limited to: * 6:00am to 10:00pm Monday to Friday; * 8:00am to 5:00pm on no more than five (5) Saturdays per year, where production has been disrupted during the week due to breakdown. Maximum staff 5F. Amaximum number of 48 staff (including drivers) are permitted on the premises during the hours of operation and are not permitted to arrive at the premises prior to 6:00 am except for: * 1 employee (maintenance worker) who is permitted to arrive at 5:00 am Monday to Friday; * 1 employee (maintenance worker) who is permitted to arrive at 5:30 am Monday to Friday; and +o * 8 employees (production workers) who are permitted to arrive at 5:45 am Monday | Friday. «x 5G. Administrative staff will be relocated from the site by 31 October 2012 such that the maximum number of staff on site from that time forward wilt be 30, generally represented by 15 production staff, 7 semi-trailer drivers, 3 management staff (from time to time), 2 ancillary truck drivers and 2 maintenance workers. Home and office deliveries 5H. No home or office delivery staff or vehicles shall operate from the premises. Miscellaneous 6. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. These landscape plans required to be submitted are to denote areas of existing vegetation or existing trees proposed or required to be retained. 7. Any advertising sign or device is to comply with Council's policies on advertising. Land Development Vehicle Access and Frontage works 8. The applicant shall relocate the existing site access to a location between 80 and 110 metres east of the existing site access on Cooroy Mountain Road, to the reasonable satisfaction of Council. The intersection between Cooroy Mountain Road and the relocated site access shall be designed and constructed to provide safe turning areas for the vehicles likely to use the access. In this respect the intersection between Cooroy Mountain Road and the relocated access shall be designed and constructed in accordance with the most recent edition of the Department of Main Roads Road Planning and Design Manual and The Noosa Plan Planning Scheme Policy 5 Engineering Design Standards - Roads, Drainage and Earthworks. The redundant access (i.e. the existing access driveway) shall not be used for vehicular access. To ensure vehicular access via the redundant access does not occur, the redundant access point within the Cooroy Mountain Road reserve shall be revegetated in accordance with Council standards. 9. The relocated driveway from Cooroy Mountain Road to the car parking loading area shall be sealed, designed and constructed in accordance with AS/NZS 2890.1-2004, AS 2890.2-2002 and The Noosa Plan Planning Scheme Policy 5 Engineering Design Standards - Roads, Drainage and Earthworks. The relocated driveway shall be designed and constructed to grades that prevent 20f8
Page 6
“ a © oe ee ee SE vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any step or level difference. Should any driveways be constructed to grades that do not comply with AS/NZS 2890.1-2004 and AS 2890.2-2002, Council will require that the driveway be removed and reconstructed to levels that do comply. 10. All vehicles shail enter and leave the site in a forward direction. Loading Areas 11. Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site generally as shown on drawing number SK-01, dated 2 August 2010and shail comply with the requirements of AS 2890.2-2002 where applicable. Car Parking 12. A sealed car parking area shall be provided on site generally as shown on drawing number SK-01, dated 2 August 2010 and shall comply with the requirements of AS/NZS 2890.1-2004 where applicable. 13. A minimum of 25 uncovered carpark spaces shall be provided on site, including 1 clearly defined disabled carpark space. 14. All carparking shall be kept, maintained and tine-marked in a condition fit for use. Roadworks Contributions 15. Accontribution of $5,960 shall be paid to the Council towards the cost of improvements to the major road network of Cooroy, as a result of increase traffic generation caused by the proposed development. The contribution shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from December 2007 until the date of payment. 16. Acontribution of $160,975 shall be paid to the Council towards the cost of improvements to Cooroy Mountain Road, as a result of increase traffic generation caused by the proposed development. The contribution shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from December 2007 until the date of payment. Water Quality 17. The applicant shall submit a Water Management Plan for Council approval prior to the issue of any Operational Works Permit. The Water Management Plan shall be prepared by a suitably qualified Environmental Engineer and certified by a Registered Professional Engineer of Queensland. The Water Management Plan shail detail water quantity and quality requirements of environments receiving runoff from the site. The Water Management Plan shall demonstrate that appropriate treatment measures will be incorporated into the proposed use to ensure the existing water quantity and water quality within environments receiving runoff from all aspects of the proposed use (i.e. including but not limited to effluent, carpark runoff and any by products of industrial use occurring on site) are maintained in accordance with The Noosa Plan and the Environmental Protection (Water) Policy 1997. Effluent Disposal 18. -. 18A. The design and construction of the on-site effluent disposal system and disposal area shall be in accordance with the Conceptual Effiuent Treatment and Disposal Strategy prepared by Gilbert and Sutherland, dated Geteber Eo: subject to the following requirements: Bonen Be & (i) ongoing monitoring of treatment process and disposal areas shall be undertaken to ensure both are functioning effectively over time. They shall be undertaken generally as follows: . 3of 8
Page 7
(ii) (iii) (iv) (v) (vi) (vii) (viii) * Annual monitoring shall be undertaken from the time of commissioning to determine the quality of the wastewater produced from the effluent treatment system; * Monitoring of the soils, vegetation and groundwater in the application area shall be undertaken every three years to establish that such is not percolating into the groundwater; * Sampling and testing shall be in accordance with relevant regulatory requirements and manuals such as those provided by the Environmental Protection Agency, with testing undertaken by an accredited Laboratory; * Continuous monitoring shall be undertaken by the system for any water on the surface of the application area, downslope resurfacing, changing plant growth on or around the application area and any other signs of problems, and addressed through maintenance or servicing. A reserve disposal area 100% the size of the primary disposal area shall be nominated and located outside required buffer areas. The location shal! be provided as part of the detailed design report at the Operational Works application stage. A minimum of secondary standard effluent treatment with disinfection to achieve the required microbiological quality (ie. 200 cfu/100 mL with no sample over 1000 cfu/100mL) shall be adopted. Detailed MEDLI modelling shall be undertaken at the operational Works application stage to confirm the appropriate size for the effluent disposal area to ensure this is equal to plant uptake, soil storage and environmentally acceptable release rates. More information on the source/s and respective volumes of wastewater produced during bottling etc shall be provided in a detailed site-based stormwater management plan (SBSWMP) at the Operational Works application stage, including monitoring of actual wastewater production rates. Washing plant, equipment or vehicles shall be undertaken off-site. If on-site washing of any plant or equipment is necessary, all wastewater shall be collected in a sump and disposed of off-site as trade waste by a registered operator. Additional monitoring of wastewater discharge at Outflow Point 1 (G & S$ drawing H J0085.1.7) is to be carried out to demonstrate compliance with the desired SVSWMP water quality objectives in support of an operational Works approval, and on an on-going basis to demonstrate continued compliance with SBSVWMP water quality objectives. This monitoring and assessment of the impact must be carried out compliance with the Ecoaccess operational policy “Wastewater Discharge to Queensland Waters’. Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan (Open Space-Conservation & Waterway Protection) is to be undertaken in addition to replanting as detailed in Drawing H J0085.1.2 of the Conceptual Site-Based Stormwater Management Plan. 40f8 month,
Page 8
18B. The Conceptual Effluent Treatment and Disposal Strategy prepared by Gilbert and Sutherland, 19. dated October 2009 assumes a combined bottled/bulk water production volume of 24 ML/annum, which produces 7.2 ML/annum of waste water. If the production rate increases over 24 MU/annum, additional settlement ponds, chemical treatment and flocculation is required in addition to those measures specified in the Conceptual Effluent Treatment and Disposal Strategy and condition 18A of this approval. These additional measures are to be achieved through larger (vertical) holding tanks and chemical dosing within the approved development footprint. Erosion & Sediment Control . Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site contro) measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the: Council for approval prior to obtaining a Development Permit for Operational Works. General 20. 21, 22. 23. 24. For the following classes of work associated with development, a Development Permit for Operational! Works must be obtained prior to commencement of works relating to that class of work. The application may combine any or all of these classes of work:- ° Access and/or Carparking. ° Roadworks. ° Stormwater Drainage. ° Frontage Works. ° Erosion & Sediment Control A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works that will become Council infrastructure, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application for Operational Works. Digital detailed designs inctuding drawings, calculations, specifications and a schedule of works, shall be submitted with any application for a Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The design shall be in accordance with Council's Planning Scheme Policy PSPO05 - Engineering Design Standards - Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council's records. : The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shail not be granted until all As Constructed information has been supplied and accepted by Council. 5 of 8
Page 9
Environmental Health 25. The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy No 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises’, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A roofed waste/bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, or approved wastewater disposal system via a bucket trap and grease arrestor. 26. The development must allow refuse-loading areas to be located off street. All vehicles associated with the collection of waste/recyclables, shall enter and leave the site in a forward direction, without the need for any unsafe maneuvering. 27. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises’, must be submitted for the day-to-day operation of the development and approved Y Council's Health Section prior to issue of development permit for operational works. It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9 explaining exactly how to predict waste quantities and design waste areas is available from Council and the web. The Pian shall include the following information: - ° The types of waste that will be generated from the activities approved within the development. ° Estimated volumes or tonnage of both recyclables and waste generated. ° Methods to be used for dealing with garden waste. ° Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling. ° Description of procedures for getting alt waste to the bins; the storage of bins and the collection of bins by the contractor. ° A description of the design details of waste storage and recycling areas including size, location, elevation and floor plan, methods of bin washing and system to prevent storm water getting into sewer via the bin wash. . A description of types and volume of waste storage containers to be used. ° The waste and recycling storage area shall include the provision of containers for all waste and recycling materials including putresable matter, non-recycling waste, paper/ « cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing facilities connected to sewer. ° A detailed description of vehicular access to collect waste. Where collection is off street, access must allow vehicles to enter and leave the site in a forward direction. . 28. As no Plumbing Final has been issued through Noosa Council Plumbing Services, all existing plumbing and drainage, along with Backflow Prevention Devices, are to be assessed to ensure compliance with current Legislation and Acts. i4- APPROVED ) PLANS/DOCUMENTS / The “approved plans and / or documents for this development approval are listed in the Assessment Manager conditions. 5 ADVISORY NOTES The following Advisory Notes are for information purposes only a and do not form conditions of approval: 6 of 8
Page 10
41. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the Disability Discrimination Act (DDA) in regard to the installation of disabled access and the provision of disabled facilities, and that access to this building and the provision of sanitary facilities may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia. 2. Noise from building works associated with commercial and or industrial development should comply with the following — ° Limited to between 7:00am to 6:30pm Monday to Saturday. ° All reasonable measures are taken to minimise noise emissions. . Not permitted on Sunday or public holidays. 3. In accordance with the Environmental Protection (Water) Policy 1997, al! sand, silt, mud, paint, cement, concrete, builder's waste or rubbish should not be permitted to enter or be placed where it ° could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines apply for such offences. 4. The applicant is informed that payment via credit card transaction will not be an acceptable method of payment for development contributions conditioned in this permit or for infrastructure charge notices issued separately. Aboriginai Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who caries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations under the ACH Act. 6 PROPERTY NOTES Not applicable 7, PRELIMINARY APPROVAL OVERRIDING SCHEME, Not applicable 7 of8
Page 11
8 FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit Subject of the required Development Permit required . Development Permit for Building Works All Building Works Development Permit for Operational Access, Carparking, Roadworks, Stormwater Drainage, Works Frontage Works and Erosion and Sediment Control. 9 SELF ASSESSABLE CODES The developer must comply with the following codes for self- assessable development related to the development approved under this Decision Notice: Advertising Devices Code 8 of 8
Page 12
SQORO’ Sey uate FACTORY BELOW STORE ‘STOREROOM ‘TELEMARKETERS FARM HOUSE é . sf a A Ay COOROY MOUNTAIN SPRING WATER FACTORY UPPER LEVEL PLAN /~™ SCALE 1:200 (42) * A
Page 13
. / “SCALE 1:200 (42) MOUNTAIN Spey Veter LOWER LEVEL PLAN preseee esses
Page 14
DRAFT
Truck Drivers Code of Co
Cooroy Mountain Spring Water
314 Cooroy Mountain Road, Cooroy
water. Access to the site from the Bruc
Topaz Street and Cooroy Mountain Road.
sidential dwellings.
Cooroy
e All drivers mt
other road use
bey all s nis, directions and instructions and display respect and courtesy for
«The use of engine is prohibited in residential areas in close proximity to the site including
along Topaz Street and Cooroy Mountain Road except in the case of an emergency ie safety
requirement, ;
¢ All vehicles entering our site must be fully roadworthy and maintained. CMSW reserve the right
to inspect any vehicle or request maintenance records for any vehicle. CMSW reserves all rights
to prohibit any vehicle from the site if we believe it may not be roadworthy, safe to operate or
generates excessive noise.
¢ Any accidents, incidents, complaints, spillages or near misses that occur are to be reported to
the CMWS General Manager as soon as possible after the occurrence.
17a
Page 15
e Any litter is to be placed in the litter bins provided on site.
e Notrucks are to access the site prior to 7am on any day of the week.
© Delivery hours for trucks are limited to the time period 7am to 6pm Monday to Saturday.
© The use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road is to be
prohibited except in the case of an emergency ie safety requirement.
¢ Maximum speed of Travel on Topaz Street and Cooroy Mountain Road is to be 60 km/h.
e Maximum speed of travel on site is 30 km/hr.
Drivers who are found to not comply with the above Code
subsequent infringements may result in disciplinary acti
duct shall be issued a warning, any
FHFEFEELEFE THEFT TE Tt tt tt ttt ttt tt ttt ttt $: Att ttt tet FFFFHEF FHF Ft t+ ttt tt +t+
Cooroy Mountain Spring Water a /
Confirmation of Understanding of the Code
(print)
Of (company)
Have read/had the Drivers : i ithe requirements of the Code. |
confirm that | will comply. fi ements of:the: Drivers Code:
Endorsed by:
(CMSW Repr.
sO 17b
Page 16
GILBERT+SUTHERLAN agriculture - water - environment! Conceptual Effluent Treatment . and Disposal Strategy Redevelopment of Cooroy Mountain Spring Water bottling facility Cooroy Mountain Road, Mt. Cooroy, Queensland Prepared for Cooroy Mountain Spring Water Pty Ltd November, 2009
Page 17
Cooroy Mountain Spring Water CEDA Cooroy Mountain Road, Mt. Cooroy QLD Document control Document: Title: Project Manager: Author: HJ0085-1_CEDA_RGH1F1 Conceptual Effluent Treatment and Disposal Strategy, Redevelopment of Cooroy Mountain Spring Water bottling facility, Cooroy Mountain Road, Mt. Cooroy, Queensland Neil Collins Greg Holland & Dan Smith Client: Client Contact: Client Reference: Cooroy Mountain Spring Water Pty Ltd Greg Dinsey Gilbert & Sutherland P/AL ABN 56 077 310 840 Originating Office: Kawana Suite 1, Level 2 Regatta Lake commercial 6 Innovation Parkway Birtinya, Q4575 Telephone 07 5493 9911 Facsimile 07 5493 9877 [email protected] Also at Robina and Brisbane Synopsis: This report describes the proposed wastewater loadings, treatment method and disposal strategy for the redeveloped Cooroy Mountain Spring Water bottling facility, Lot 2 SP143409, 314 Cooroy Mountain Road, Mt Cooroy, Queensland. Revision History Revision # Date Edition By Approved By 1 14.10.09 G. Holland D. Smith N. Collins 2 26.10.09 G. Holland D. Smith N. Collins 3 10.11.09 G. Holland D. Smith N. Collins Distribution Distribution Revision Number 5 Cooroy Mountain Spring Water IPA Law G&S library and file G&S Kawana 6 “is iy ast] HOU
Page 18
—_ oo om meme NCH 35 ly LHD GILBERT+SUTH ERLANG Summary This report describes the proposed wastewater loadings, treatment method and disposal strategy for the redeveloped Cooroy Mountain Spring Water bottling facility, Lot 2 SP143409, 314 Cooroy Mountain Road, Mt Cooroy, Queensland. An Effluent Disposal Report has been previously prepared for the site as part of the MCU Development Application. This current conceptual assessment constitutes a revision of the site effluent treatment and disposal strategy in accordance with AS/NZS 1547:2000 ‘On-site domestic wastewater management’ and the experts agreement dated 2 September 2009, and refers to the findings of the previous report where relevant. In performing this assessment site physical characteristics and site soil suitability have been reviewed. An approved secondary wastewater treatment system will be used to manage wastewater generated by the development. An irrigation area of 1,180m? will be required to assimilate the proposed volume of treated wastewater. We consider there is sufficient land area on the site to accommodate the irrigation area and an increase in area if required. This report concludes that sustainable irrigation of treated wastewater within the site, in accordance with the advice contained herein and applicable guidelines, is achievable. As this is a conceptual design, a further detailed effluent treatment and disposal strategy including MEDLI modelling will need to be prepared to support future operational works applications for this site.
Page 19
Cooroy Mountain Spring Water CEDA Cooroy Mountain Road, Mt. Cooroy QLD Table of contents 1) INtFODUCTION ..-.ssseccssseeescssseescssresssssesennesconteccesnseseusnscsstsueceestsnterssusseapersarersosensnacatanneransureesuneeesnueeess 2) Proposed development . _ 3) Site characteristics... 3.1 Site location 3.2 Geology ... 3.3 Soil classification 3.4 Topography and drainage. B.S Vegetation......cccssecsereeee 4) Previous assessment. 4.1. Wastewater loading. 4.2 Soil types... 4.3 Permeability. 44 Irrigation area 5) Effluent treatment system and land application area ..........csccccseescseessesesssesessssesessnveccavecesanecsese 5-1 5.1 Wastewater loadings ... 5.2 Bottling facility wash down 5.3 Licensing requirement....... 5.4 Proposed wastewater treatment system 5.5 Proposed method of disposal... 5.6 Proposed irrigation area. 5.7 Buffer distances............... 5.8 Additional buffer requirement. 6) System maintenance 6.1 Disinfection. 6.2. Unit maintenance. 6.3 Maintaining the land application area .. 7) CONCIUSIONS........-.ecssesseessecsessesstesnessecaceateseeenees lerepy wy 135 §-S8N0TH C
Page 20
a c -S Se co DUES Oy wos 1) Introduction Cooroy Mountain Springwater Pty Ltd commissioned Gilbert & Sutherland Pty Ltd (G&S) to prepare a Conceptual Effluent Treatment and Disposal Strategy for Lot 2 SP143409, 314 Cooroy Mountain Road, Cooroy Queensland (‘the site’). The site occupies a total area of 48.17 hectares and is shown on Drawing HJ0085.1.1. An Effluent Disposal Report was previously prepared for the site by Global Testing Pty Ltd in 2007'. This current assessment constitutes a revision of the site effluent treatment and disposal strategy in accordance with AS/NZS 1547:2000 ‘On-site domestic wastewater management’ and the experts agreement dated 2 September 2009. The issues raised in the Report of Experts Meeting September 2, 2009 relevant to this conceptual assessment are reproduced below. ° An updated effluent treatment and disposal strategy (ET&DS) is required for the project, to demonstrate that adequate treatment of wastewater from plant and wash down, and from staff and suitable on site disposal, ‘ Pinkney, M.S., 2007, Effluent Disposal Report - Existing residence & proposed extensions to existing factory, 314 Cooroy Mountain Road, Cooroy, Global Testing , Noosaville, Queensland, GILBERT+SUTHERLAND, taking account of current plant staffing and waste generation figures. A conceptual ET&DS should be completed by G&S to support the current application, to outline EP's to be treated, treatment process, and disposal areas and locations. This work should include suitable sampling and testing of the current waste stream discharge, appropriate to the relevant sources. A further investigation of actual EP's being generated by the combination of plant, wash down and staff wastewater is to be carried out by G&S to support the current application, and to assess if additional ERA licensing is required for the site. In performing this assessment site physical characteristics and soil suitability have been reviewed. 1-1
Page 21
ue ed ee es ee @ 8 e ° e°.”.- o YX e ° . , Ao a a ‘4g os & ¢ 2. a. o & a a : * a ° "3, os a e Lo o * a . es oo" i t a a a raancr ” : GILBERT+SUTHERLAN COOROY MOUNTAIN SPRINGWATER S a agriculture - water -environment\ | MT COOROY BOTTLING FACILITY * bles ° Sulte 1, Level 2 Regatta Lake Commercial | COOROY MOUNTAIN ROAD 2” or it 2] 6 Innovation Parkway, Bitinya Qid. 4575 4 may LEEEEME Phono 5493 9911 Fax 5453 9877 < | SITELOCATION =, —s <f ‘ - Sep een NPRNED . Rarrrorroccue) | ORANN 0.08, PVE Ae Tose ce ee NP ve seenee veecneD
Page 22
LdiHOW v. zy"! “S200fH a 2) Proposed development The proposed development the subject of the MCU application consists of: a single on-site residential dwelling, a steel framed shed complex containing bottle wash and filling areas, storage area, holding tanks and loading areas, © areas of hardstand surrounding the above shed for car parks, loading bays and site access; and ¢ office wing including reception, administration and staff amenities. Drawing HJ0085.1.5 shows the proposed redevelopment layout. GILBERT+SUTHERLANG It is proposed that wastewater generated by the redevelopment will be treated to a secondary standard before being irrigated onto an appropriate disposal area which meets all planning requirements. The calculation of the wastewater loadings used in this assessment is detailed in Section 5 of this report. The anticipated wastewater loadings from the development will be equivalent to a 17 EP sewage treatment system. Therefore, this proposal will not require an ERA63 licence. 2-1
Page 23
\ RpeSENEREMELSs
Are
irrigation’areaki
Ss Rarrciens
NeYelasdiaye)
GILBERT+SUTHERLAN
agriculture - water - environment
Suite 1, Level 2 Regatts Lake Commercial
6 Innovation Parkway, Birtinya Qid. 4575
PROJECT
COOROY MOUNTAIN SPRINGWATER. : 3
PROPOSED REDEVELOPMENT PLAN
MT COOROY BOTTLING FACILITY 70-3.
COOROY MOUNTAIN ROAD. ts
= Phone 6493 9911 Fax 54939877 -
ie Cara Fowenoumemaro | me camnom [mwnocs | >wmow
(GE READ 0k PREFERENCE . °
TOSCALNG. se ee bt sD pave secn08 CHECKED HJ0085.1.5~
=
Page 24
3) Site characteristics 3.1 Site location The proposed development site is located at 314 Cooroy Mountain Road, Mt. Cooroy, Queensland. The site is properly described as Lot 2 on $P143409, Parish of Tewantin. 3.2 Geology A review of the Queensland Department of Mines and Energy 1:100,000 Gympie Special Sheet? geology map indicates that the elevated sections of the site are underlain by Tertiary Rhyolite formations while the Jower portions of the site surrounding waterways are located over early to middle Triassic Arenite, Argillite and Phyllite of the Kin Kin Beds formation. 3.3 Soil classification While no on-site soil studies have been undertaken by Gilbert & Sutherland as part of this assessment, the above geology is known to give rise to a number of soil types’. Soils based on Tertiary Rhyolite formations are generally acidic in nature and produce Tenosols, Sodosols and Kurosols. Kin Kin bed derived soils tend not to be as acidic and have been found to produce red and yellow Chromosols and Tenosols. A detailed soil survey and permeability testing would be undertaken as part of the detailed assessment at Operational Works application stage. 3.4 Topography and drainage Elevation at the site ranges from approximately RL105 metres along the central waterway to greater than RL140 metres in the steeper south-eastern and eastern portion of the site. The slopes are 2 Queensland Department of Mines and Energy, 1999, Gympie Special Sheet, 1:100,000 geology map, Queensland Government, Brisbane. 3 Shields, P., 1995, Geology and Soils'of Noosa Shire, Noosa Shire Planning Scheme Review, Noosa Shire Council, Tewantin, Queensland. GILBERT+SUTHERLAND, typically ‘very gently inclined’ (<3%) to ‘moderately inclined’ (>20%).* Runoff from the site flows towards a small un-named waterway flowing across the site. This waterway flows from the south- west corner of the site toward the north- east and eventually onto Lake McDonald. A number of small dams are located on-site which serve to provide water for grazing stock and capture site run-off for irrigation of landscaped areas. 3.5 Vegetation With the exception of the relatively smalt The majority of the site is cleared and covered by pasture grasses for cattle grazing purposes. The bottling facility site was also previously cleared and planted to pasture for this purpose. A significant area of mature trees and other planted vegetation is located to the east of the bottling facility and incorporates the eastern drainage line, with scattered riparian vegetation (both pre-existing and planted) occupying the banks of the main tributary to the west of the bottling facility and towards the northern boundary. This vegetation is currently mapped as regrowth area under the Queensland Regional Ecosystem (RE) classification. Further dense vegetation exists on the eastern boundary which is mapped as dominant “Of Concern” and remnant “Not of Concern” under the Queensland Regional Ecosystem (RE) classification. “ McDonald, RC, tsbell, RF, Speight, JG, Walker, J and Hopkins, MS 1990, Australian Soil and Land Survey Field Handbook, Australian Soil and Land Survey Handbooks, 2nd edn, vol 1, Inkata Press, Melbourne. 3-1
Page 25
Cooroy Mountain Spring Water CEDA Cooroy Mountain Road, Mt. Cooroy QLD 4) Previous assessment The outcomes of the previous assessment by Global Testing are as follows. 4.1 Wastewater loading At the time the report was prepared the predicted wastewater loading was a total of 1950L/day comprised of: * 900L/day from the existing 3 bedroom household; and ¢ 1050L/day from the extended bottling facility (21 persons @ 50L per person per day). 4.2 Soil types Soil encountered at the site of the proposed irrigation area was defined as a moist brown silty, sandy clay overlying a moist red/brown silty, sandy clay. No indication of soi! structure was given. 4.3 Permeability Three separate infiltration tests were used to determine that the average permeability for the chosen disposal site was 0.22m/day and consequently a design irrigation rate (from AS1547) of 20mm/week was adopted. 4.4 Irrigation area Based on the above information Global Testing recommended that a gypsum treated surface spray irrigated area of 683m? would be sufficient to assimilate the wastewater generated. In accordance with the required Noosa Shire setback distance for properties located with the Lake MacDonald catchment the proposed area was to be jocated near the western lot boundary to the south of the access road.
Page 26
5) Effluent treatment system and land application area This Conceptual Effluent Treatment and Disposal Strategy was conducted using a combination of new data and data taken from the previous site investigation undertaken by Global Testing in 2007. The proposed treatment and application methods to be employed on-site are based on the following guidelines and authorities: « the ‘Queensland Plumbing and Wastewater Code, 2006’ © AS/NZS 1547:2000 ‘On-site Domestic Wastewater Management’ 5 * Planning Guidelines for Water Supply and Sewerage © * Queensland Water Recycling Guidelines, 2005.’ Based on previous testing detailed in Section 3 of this report and the proposed site use, it is proposed that the most effective and flexible method of irrigating treated wastewater for the site would be via surface sprinkler. In calculating a suitable disposal area for the predicted wastewater loadings, the site was assigned a conservative permeability of 0.22m/day in accordance with Category 5 soils as detailed in Table 4.2A4 of AS/NZS 1547:2000. A conservative proposed irrigation area for the expected effluent Joadings was therefore calculated incorporating the recommended design irrigation rate (DIR) of 20 mm/week for a category 5 soil from Table 4.2A4 of AS/NZS 1547 (2000). This is detailed in Section 5.4. 5.1 Wastewater loadings The following proposed wastewater loadings are based on interviews with Cooroy Mountain Spring Water staff and 5 Standards Australia/Standards New Zealand, 2000, ASINZS 1547:2000 On-site domestic wastewater management. ’ Department of Natural Resources & Mines, 2005, Planning Guidelines for Water Supply and Sewerage. Chapter 5 - Demand/Flow and Projections - Table A. 7 Queensland Government, Environmental Protection Agency, 2005, WaterWise Queensland. Queensland Water Recycling Guidelines 2005. GILBERT+SUTHERLANG data obtained from Appendix 4.2D of AS/NZS 1547:2000. Table 5.1.1 lists the wastewater generating activities at the redeveloped site during the peak summer period when the facility is fully staffed (48 persons). Table 5.1.1 Proposed wastewater volumes Source Volume | Number | Volume per of of waste- person | people water (L) (Uday) On-site 180 5 3900 residence Dual flush 27.5 48 1,320 toilet* Hand . 8 48 384 washing** Kitchen 5 48 240 Misc. 10 48 480 TOTAL - 3,324 *Assumes 11/5.5 dual flush cistern, with 1 fult flush and 3 half flushes per person per day. ** Assumes 4 x 2L washes per day. For the on-site residence it is assumed that it will be a permanent 5 person household connected to a bore water supply (i.e. 180L/person/day). For the bottling facility and administration block, the above loadings assume a total of 50.5L/person/day. This is in line with the loadings for industrial use (50L per person) from AS1547:2000. . 5.2 Bottling facility wash down In addition to the above tabled wastewater generation projections there is a volume of water used on a weekly basis to hose down the internal shed floors. This is performed once a week using a pressure cleaner to conserve water and expedite the task. This water is currently collected in a connected series of concrete drains embedded in the shed floor. It is proposed that these will drain to a central underground sump equipped with a pump and float switch to enable the contained waters to be pumped to the effluent disposal system as the sump level requires. Assuming that the pressure cleaner uses 600L per hour and the wash down takes half an hour, it is estimated that the 5-1
Page 27
Cooroy Mountain Spring Water CEDA Cooroy Mountain Road, Mt. Cooroy QLO volume of water required undertaking this task will be 300L per week or an average of 43L per day. Added to the total above the total volume of wastewater to be treated will be 3,367Uday. Wastewater loadings from the bottling plant process are dealt with in the Conceptual Stormwater Assessment report by Gilbert & Sutherland (2009). 5.3 Licensing requirement Using the formulae presented in the Queensland Environmental Protection policy (Water) 1994 - Environmental Protection Regulation (2008) Section 63, one Equivalent Person (EP) generates 200L per day. Thus the proposed development will require a ~17 EP wastewater treatment system. As this is less than the 21 EP threshold the system does not constitute an Environmentally Relevant Activity (ERA) 63 licence and does not require Department of Environment and Resource Management (DERM) approval. 5.4 Proposed wastewater treatment system It is proposed that wastewater generated on-site will be treated to a secondary standard within a water treatment plant (WTP) utilising either of the following treatment methods: * activated sludge system * biological trickling filter system * extended aeration system * aerated/aerobic sand filter system 5.5 Proposed method of disposal It is proposed that the treated effluent from the bottling facility redevelopment will be surface irrigated onto a designated irrigation area. The surface-spray irrigation system proposed will allow regular small applications to be applied to the nominated irrigation area to maintain optimal soil moisture levels while minimising deep percolation and surface run-off. Additionally, surface spray applications maximise evaporation further assisting with wastewater disposal. All such irrigation would be undertaken in accordance with the requirements of the 5-2 Queensland Water Recycling Guidelines and AS/NZS 1547:2000, including the following: + The designated land application area must comply with setback distance requirements. + The presence of buried pipes shall be indicated by using underground marking tape to AS/NZS 2648.1 or be indicated by warning signs at the boundaries of the designated area, clearly visible to property users, which would read in English and any other appropriate community language: ‘Sewage effluent pipework installed below. DO NOT DIG’. + Warning signs should be erected near the wastewater treatment system, be clearly visible and read in English and any other appropriate community language: “RECYCLED WATER BEING USED - DO NOT ORINK’. + All recycled water signs should comply with AS1319-1994 Safety Signs for the Occupational Environment. « No run-off or seepage of effluent should occur beyond the designated irrigation area. + Effluent must not come into contact with people, domestic or farm animals or any crops intended for human consumption. + The owners of the system must enter into @ contract with an organization authorised by Council and/or EPA for the servicing of the unit on a regular basis. + The land application area/s should be maintained with purposely planted grass/turf or trees/shrubs to maximise the nutrient uptake and minimise deep percolation of nutrients through the soil profile. 5.6 Proposed irrigation area In order to estimate an appropriate land application area for the expected loadings, the method of catculation for an irrigation area from AS1547—1994 was used. The equation for sizing a surface irrigation area from Section 3.6.2(c) of AS1547—1994 is as follows: Ai = qw/DIR Where Ai = irrigation area required qw = total quantity of effluent generated in a week, in litres
Page 28
| DIR = = design irrigation rate in mm/week
Therefore:
qw = 3,367L (from Table 5.1.1) x 7 days
t = 23,569L/week
ro DIR = 20mm/week (adopted from Global
' Testing report in Section 3)
I Ai = 23,569/20 = 1,180m?
| Assuming the conservative DIR of
20mm/week determined above, a minimum
| of 1,180m? is required for irrigation.
| Drawing number HJ0085.1.5 shows the
proposed redevelopment layout and
proposed irrigation area locations.
5.7 Buffer distances
Code (2007)*):
Secondary treated effluent
© 6m from an in-ground rainwater tank
used as a potable water supply for
i humans or animals.
* 30m from a dam, bore, weil or
permanent watercourse (embankment).
{ * 30m from an intermittent watercourse
(embankment) or drainage channel
t provided that they are not
. directly/indirectly used as a potable water
| supply for humans or animals.
* 6m from the water's edge of swimming
[ pool when located lower than the
: disposal area or 3m when higher (must
| also be outside of the pool enclosure).
t
~S800fH
ge wgI>”
a
and Wastewater Code’ (2007).
{ To protect downstream environmental
| values and prevent potential human health
impacts, the following setback distances
apply for effluent irrigation areas
L . (Queensland Plumbing and Wastewater
t
8 Queensland Department of Local Government,
Planning, Sport and Recreation ‘Queensland Plumbing
GILBERT+SUTHERLANG
© 4m from property boundaries, pedestrian
paths, footings of buildings, walkways,
recreation areas or retaining wall
footings and the like when focated
downslope from the disposal area, or 2m
when upslope or level.
For public health reasons the disposal areas
must have signage in accordance with
AS/NZS 1547:2000.
5.8 Additional buffer requirement
Further to the above recommended setback
distances the Noosa Shire Plan Planning
Scheme Policy 24 - Effluent Disposal
(effective February 3, 2006) requires that all
effluent disposal irrigation areas are to be
located not less than 100m from any
permanent or intermittent watercourse.
To this end it is proposed that the irrigation
area for this site will be located near the
western fot boundary to the south of the
access road, See Drawing No.HJ0085.1.6 (at
the end of this section).
5-3
Page 29
ee —a—a—a—a—<—a aie a es i ea a ei aes a SS cae = G82222 . 272?) eam _ agriculture - water -environment\ | MT COOROY BOTTLING FACILITY” q oe Pyaar Suite 1, Level 2 Regatta Lake Commercial: COOROY MOUNTAIN ROAD | Image Source: Google Early 6 Innovation Parkway, Birtinya Qld. 4575 3 , a . Phone 5493 9911 Fax 5493 9877 100m IRRIGATION AREA BUFFER EXTENT FIQURED ORENSIONS TO APPROMED SCALE AS SHOWN ORAWH OG. ORR to, ‘ GE READ IM PREFERENCE : ‘ Toscuma wo ey Ponte omen = HJ0085.1.6 ' GILBERT+SUTHERLAN PROJECT - COOROY MOUNTAIN SPRINGWATER
Page 30
meee —_— oe ee 6) System maintenance 6.1 Disinfection Where effluent is irrigated across the ground surface, disinfection is considered necessary and may include chlorine addition or the use of UV, Ozone or membrane technology. 6.2 Unit maintenance To reduce any risk associated with the operation of aerobic treatment plants, they must be maintained regularly by a registered service agent so that the discharge criteria for the reclaimed effluent are satisfied at all times. This maintenance must be carried out in accordance with the requirements of the manufacturer and to the satisfaction of Council. As part of the quarterly service, studge and scum levels should be monitored. Anaerobic chambers should be desludged by an approved contractor, as required. GILBERT+SUTHERLANG 6.3 Maintaining the land application area The fand owner or occupier is responsible for the maintenance of the land application area and should ensure ponding and runoff from the area does not occur. The irrigation area requires regular harvesting (mowing/pruning) and removal of clippings to ensure that nutrients are removed from the system and to promote continued growth, nutrient assimilation and water uptake. A high level of ground cover must be maintained at all times to minimise potential erosion. The land application area must be inspected regularly to assess its physical condition. The most obvious signs of system failure would be odour or surface ponding of water. Any irrigation area rectification work is to be performed by a licensed drainer. 6-1
Page 31
-SS00re “woay7 MOE 7) Conclusions A conservative assessment of site conditions was undertaken to determine its suitability to accept on-site disposal of treated wastewater generated by the proposed bottling facility development. An approved secondary wastewater treatment system will be used to manage wastewater generated by the development. An irrigation area of 1,180m? will be required to assimilate the proposed volume of treated wastewater based on the conservative loadings of 3,367 week. The size of the site will ensure this area is available and that an increase in area is also possible if required. GILBERT+SUTHERLANG This report concludes that irrigation of treated wastewater within the site, in accordance with the advice contained herein and applicable guidelines is achievable. As this is a conceptual design, a further detailed effluent treatment and disposal strategy including MEDLI modelling will need to be prepared to support future operational works applications for this site.
Page 32
8) Limitations of reporting Gilbert & Sutherland Pty Ltd has attempted to be accurate providing this information. The interpretation of scientific data, however, involves professional judgement. As such, interpretation is open to error. In recognising the potential for errors in scientific interpretation, Gilbert & Sutherland Pty Ltd does not guarantee that the information is totally accurate or complete and clients are advised not to rely solely on this information when making commercial decisions. Any representation, statement, opinion or advice, expressed or implied is made in good faith and on the basis that the authors, Gilbert & Sutherland GILBERT+SUTHERLANG Pty Ltd, their agents or employees are not liable (whether by reason of lack of care or otherwise) to any person for any damage or loss whatsoever which has occurred or may occur in relation to that person taking or not taking (as the case may be) action in respect of any representation, statement or advice referred to above. Furthermore, this information should not be relied upon by any other persons than the client for whom this information was compiled. This information reflects the specific brief and the budget of the client concerned, who enjoys an individual tolerance of risk.
Used in these records
132006.268.03 - Original Court Approval - Attachment 1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.