132006.268.03 - Original Court Approval - Attachment 1

of 32

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Attachment 1


[OCR of page images]
Attachment 1

 

In the Planning and Environment Court No 314 of 200
Held at: Maroochydore

Between: JOHN HARDING, JOHN FORTH, Appellants
ADRIENNE FORTH, JOAN ALEXANDER,
IAN BENNETT AND PETER MOON

And: SUNSHINE COAST REGIONAL COUNCIL Respondent
And: COOROY MOUNTAIN SPRING WATER Co-Respondent
PTY LTD ACN 053 498 285
JUDGMENT

Before His Honour Judge Dodds
Date of Hearing: 2 August 2010
Date of Judgment: 2 August 2010

THIS MATTER HAVING on this day come on for hearing by way of an appeal
against the Respondent’s approval of a development application for a Development
Permit for a Material Change of Use (Resource- Based Spring Water Bottling Plant)
in relation to Land at 314 Cooroy Mountain Road, Cooroy and also described as Lot 2
on SP 143409.

IT IS ADJUDGED that the appeal be dismissed.

Filedon 06.06 . xnJ0/Q

Filed by: Connor O’Meara Solicitors
Service address: Level 5, 370 Queen Street, Brisbane 4000
Phone: (07) 3221 3033

Fax: (07) 3221 6661

 

 

JUDGMENT CONNOR O'MEARA

» Filed on behalf of the Co-Respondent Solicitors

Level 5, 370 Queen Street
BRISBANE 4000

Phone: 3221 3033

Fax: 3221 6661

   
Full text of the other 31 pages

Page 2

WB a

 

 

 

 

In the Planning and Environment Court No 318 of 2008
Held at: Maroochydore

Between: COOROY MOUNTAIN SPRING WATER Appellant
PTY LTD ACN 053 498 285
And: SUNSHINE COAST REGIONAL COUNCIL Respondent
And: JOHN HARDING, JOHN FORTH, Co-Respondents by

ADRIENNE FORTH, JOAN ALEXANDER, Election
IAN BENNETT AND PETER MOON

JUDGMENT

Before His Honour Judge Dodds
Date of Hearing: 2 August 2010
Date of Judgment: 2 August 2010

THIS MATTER HAVING on this day come on for hearing by way of an appeal
against the Respondent’s approval of a development application for a Development
Permit for a Material Change of Use (Resource- Based Spring Water Bottling Plant)
in relation to Land at 314 Cooroy Mountain Road, Cooroy and also described as Lot 2
on SP 143409.

UPON the Court being satisfied that the changes to the plans of development are
“minor” within the meaning of section 4.1.52(2)(b) of the Integrated Planning Act
1997 as amended by sections 821 and 350 of the Sustainable Planning Act 2009.

IT IS ADJUDGED that:
1. the appeal be allowed in part;
2. the changed application be approved subject to the amended conditions

attached hereto and marked “Attachment A”;

 

    

  

  

AAaN ARS JUDGMENT CONNOR O’MEARA
4 AS milly: Filed on behalf of the Appelia nt Solicitors
g Form PEC-7 : Level 5, 370 Queen Street

BRISBANE 4000
Phone: 3221 3033
Fax: 3221 6661

Page 3

»

3.

there be liberty to apply.

Filedon Olo. D06- SOr1WO

Filed by: Connor O’Meara Solicitors
Service address: Level 5, 370 Queen Street, Brisbane 4000
Phone: (07) 3221 3033

Fax:

 

(07) 3221 6661

   

Page 4

__ _ Attroerct “A _ ~

o oe . . _.

 

 

1 APPLICATION DETAILS

Application No: 2006/268

Street address: 314 Cooroy Mountain Road, Cooroy Mountain
Real property Lot 2 SP 143409

description:

Planning Scheme: The Noosa Plan

2 RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager conditions.
3 ASSESSMENT MANAGER CONDITIONS

Land Use

1. Development undertaken in accordance with this approval must generally comply with the approved
plans of development. The approved plans are numbered SKO1 and SK02 dated 2 August 2010and
as may be amended by these conditions.

2. The development must be undertaken and operated in a manner that causes no detrimental effect
upon the amenity of the neighbourhood by reason of the creation of excessive noise, tighting
nuisance or other emissions.

Vehicle and Truck Movements

3. All vehicles associated with the use shall travel to the site via the western end of Cooroy Mountain
Road.

4 -.
5. -.

5A. Trucks are not to arrive at or leave the premises outside the hours of 7:00 am to 6:00pm Monday to
Friday.

5B. Prior to the Council completing the staged upgrade works to Cooroy Mountain Road, weekly Trucks
shall be limited as follows:

(a) 40 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying water but
excluding B-Doubles) per week;

(b) 20 ancillary trucks (namely non-articulated trucks and non-water carrying trucks).

5C. After the Council has completed the staged upgrade works to Cooroy Mountain Road, weekly
Trucks shall be limited as follows:

(a) 50 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying water but
excluding B-Doubles) per week;

(b) 25 ancillary trucks (namely non-articulated trucks and non-water carrying trucks).

Note: The road upgrade referred to is the upgrading of the remaining 2.2 kilometres of Cooroy
Mountain Road to provide two (2) 3.5 metre wide traffic lanes with a 1.0 metre wide sealed shoulder
to a total formation width of 9.0 metres. It is envisaged that the upgrade works to Cooroy Mountain
road will be completed in the financial year 2012/2013.

5D. Truck drivers will comply with the requirements of the “Truck Drivers Code of Conduct” dated 2
August 2010 which requires, amongst other things but is not limited to:

10f8

 

Page 5

  

 

(a) the use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road be
prohibited except in case of an emergency (i.e. safety requirement);

(b) Maximum speed on Topaz Street and Cooroy Mountain Road to be 60 km/hr.

Hours of operation
5£. The hours of operation for the use are limited to:

* 6:00am to 10:00pm Monday to Friday;

* 8:00am to 5:00pm on no more than five (5) Saturdays per year, where production has
been disrupted during the week due to breakdown.

Maximum staff

5F. Amaximum number of 48 staff (including drivers) are permitted on the premises during the hours of
operation and are not permitted to arrive at the premises prior to 6:00 am except for:

* 1 employee (maintenance worker) who is permitted to arrive at 5:00 am Monday to Friday;
* 1 employee (maintenance worker) who is permitted to arrive at 5:30 am Monday to Friday;

and
+o
* 8 employees (production workers) who are permitted to arrive at 5:45 am Monday | Friday. «x

5G. Administrative staff will be relocated from the site by 31 October 2012 such that the maximum
number of staff on site from that time forward wilt be 30, generally represented by 15 production

staff, 7 semi-trailer drivers, 3 management staff (from time to time), 2 ancillary truck drivers and 2
maintenance workers.

Home and office deliveries

5H. No home or office delivery staff or vehicles shall operate from the premises.
Miscellaneous

6. Existing trees on the site and within road reserves are to be retained, except where required to be
removed due to building operations or the conduct of the approved use. These landscape plans

required to be submitted are to denote areas of existing vegetation or existing trees proposed or
required to be retained.

7. Any advertising sign or device is to comply with Council's policies on advertising.
Land Development

Vehicle Access and Frontage works

8. The applicant shall relocate the existing site access to a location between 80 and 110 metres east
of the existing site access on Cooroy Mountain Road, to the reasonable satisfaction of Council. The
intersection between Cooroy Mountain Road and the relocated site access shall be designed and
constructed to provide safe turning areas for the vehicles likely to use the access. In this respect the
intersection between Cooroy Mountain Road and the relocated access shall be designed and
constructed in accordance with the most recent edition of the Department of Main Roads Road
Planning and Design Manual and The Noosa Plan Planning Scheme Policy 5 Engineering Design
Standards - Roads, Drainage and Earthworks. The redundant access (i.e. the existing access
driveway) shall not be used for vehicular access. To ensure vehicular access via the redundant
access does not occur, the redundant access point within the Cooroy Mountain Road reserve shall
be revegetated in accordance with Council standards.

9. The relocated driveway from Cooroy Mountain Road to the car parking loading area shall be sealed,

designed and constructed in accordance with AS/NZS 2890.1-2004, AS 2890.2-2002 and The
Noosa Plan Planning Scheme Policy 5 Engineering Design Standards - Roads, Drainage and
Earthworks. The relocated driveway shall be designed and constructed to grades that prevent

20f8

Page 6

“

a
© oe ee

ee

SE

 

vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the
footpath without any step or level difference. Should any driveways be constructed to grades that
do not comply with AS/NZS 2890.1-2004 and AS 2890.2-2002, Council will require that the
driveway be removed and reconstructed to levels that do comply.

10. All vehicles shail enter and leave the site in a forward direction.
Loading Areas

11. Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site generally as
shown on drawing number SK-01, dated 2 August 2010and shail comply with the requirements of
AS 2890.2-2002 where applicable.

Car Parking

12. A sealed car parking area shall be provided on site generally as shown on drawing number SK-01,
dated 2 August 2010 and shall comply with the requirements of AS/NZS 2890.1-2004 where
applicable.

13. A minimum of 25 uncovered carpark spaces shall be provided on site, including 1 clearly defined
disabled carpark space.

14. All carparking shall be kept, maintained and tine-marked in a condition fit for use.
Roadworks Contributions

15. Accontribution of $5,960 shall be paid to the Council towards the cost of improvements to the major
road network of Cooroy, as a result of increase traffic generation caused by the proposed
development. The contribution shall be paid to the Council prior to obtaining a Development Permit
for Operational Works. This amount will be subject to variations in the Consumer Price Index, All
Groups Brisbane from December 2007 until the date of payment.

16. Acontribution of $160,975 shall be paid to the Council towards the cost of improvements to Cooroy
Mountain Road, as a result of increase traffic generation caused by the proposed development. The
contribution shall be paid to the Council prior to obtaining a Development Permit for Operational
Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane
from December 2007 until the date of payment.

Water Quality

17. The applicant shall submit a Water Management Plan for Council approval prior to the issue of any
Operational Works Permit. The Water Management Plan shall be prepared by a suitably qualified
Environmental Engineer and certified by a Registered Professional Engineer of Queensland.
The Water Management Plan shail detail water quantity and quality requirements of environments
receiving runoff from the site. The Water Management Plan shall demonstrate that appropriate
treatment measures will be incorporated into the proposed use to ensure the existing water quantity
and water quality within environments receiving runoff from all aspects of the proposed use (i.e.
including but not limited to effluent, carpark runoff and any by products of industrial use occurring on

site) are maintained in accordance with The Noosa Plan and the Environmental Protection (Water)
Policy 1997.

Effluent Disposal
18. -.

18A. The design and construction of the on-site effluent disposal system and disposal area shall be in
accordance with the Conceptual Effiuent Treatment and Disposal Strategy prepared by Gilbert and
Sutherland, dated Geteber Eo: subject to the following requirements:
Bonen Be &

(i) ongoing monitoring of treatment process and disposal areas shall be undertaken to
ensure both are functioning effectively over time. They shall be undertaken generally
as follows: .

3of 8

 

Page 7

 

 

(ii)

(iii)

(iv)

(v)

(vi)

(vii)

(viii)

 

* Annual monitoring shall be undertaken from the time of commissioning to determine
the quality of the wastewater produced from the effluent treatment system;

* Monitoring of the soils, vegetation and groundwater in the application area shall be
undertaken every three years to establish that such is not percolating into the
groundwater;

* Sampling and testing shall be in accordance with relevant regulatory requirements and
manuals such as those provided by the Environmental Protection Agency, with testing
undertaken by an accredited Laboratory;

* Continuous monitoring shall be undertaken by the system for any water on the surface
of the application area, downslope resurfacing, changing plant growth on or around
the application area and any other signs of problems, and addressed through
maintenance or servicing.

A reserve disposal area 100% the size of the primary disposal area shall be nominated
and located outside required buffer areas. The location shal! be provided as part of the
detailed design report at the Operational Works application stage.

A minimum of secondary standard effluent treatment with disinfection to achieve the
required microbiological quality (ie. 200 cfu/100 mL with no sample over 1000
cfu/100mL) shall be adopted.

Detailed MEDLI modelling shall be undertaken at the operational Works application stage
to confirm the appropriate size for the effluent disposal area to ensure this is equal to
plant uptake, soil storage and environmentally acceptable release rates.

More information on the source/s and respective volumes of wastewater produced during
bottling etc shall be provided in a detailed site-based stormwater management plan
(SBSWMP) at the Operational Works application stage, including monitoring of actual
wastewater production rates.

Washing plant, equipment or vehicles shall be undertaken off-site. If on-site washing of
any plant or equipment is necessary, all wastewater shall be collected in a sump and
disposed of off-site as trade waste by a registered operator.

Additional monitoring of wastewater discharge at Outflow Point 1 (G & S$ drawing H
J0085.1.7) is to be carried out to demonstrate compliance with the desired SVSWMP
water quality objectives in support of an operational Works approval, and on an on-going
basis to demonstrate continued compliance with SBSVWMP water quality objectives. This
monitoring and assessment of the impact must be carried out compliance with the
Ecoaccess operational policy “Wastewater Discharge to Queensland Waters’.

Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan (Open
Space-Conservation & Waterway Protection) is to be undertaken in addition to replanting

as detailed in Drawing H J0085.1.2 of the Conceptual Site-Based Stormwater
Management Plan.

40f8

month,

Page 8

 

 

18B. The Conceptual Effluent Treatment and Disposal Strategy prepared by Gilbert and Sutherland,

19.

dated October 2009 assumes a combined bottled/bulk water production volume of 24 ML/annum,
which produces 7.2 ML/annum of waste water. If the production rate increases over 24 MU/annum,
additional settlement ponds, chemical treatment and flocculation is required in addition to those
measures specified in the Conceptual Effluent Treatment and Disposal Strategy and condition 18A
of this approval. These additional measures are to be achieved through larger (vertical) holding
tanks and chemical dosing within the approved development footprint. Erosion & Sediment
Control .

Any person acting on this permit shall prevent erosion and sediment export from leaving the site.
Site contro) measures such as silt fencing, controlled gravel access to the site and controlled
disposal of waste, will be necessary. In this regard plans detailing the methods of controlling
erosion and sediment are required to be submitted to the: Council for approval prior to obtaining a
Development Permit for Operational Works.

General

20.

21,

22.

23.

24.

For the following classes of work associated with development, a Development Permit for
Operational! Works must be obtained prior to commencement of works relating to that class of work.
The application may combine any or all of these classes of work:-

° Access and/or Carparking.
° Roadworks.

° Stormwater Drainage.

° Frontage Works.

° Erosion & Sediment Control

A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works. In
this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
submitted in conjunction with any application for Operational Works.

Digital detailed designs inctuding drawings, calculations, specifications and a schedule of works,
shall be submitted with any application for a Development Permit for Operational Works in respect
of roadworks and stormwater drainage works. The design shall be in accordance with Council's
Planning Scheme Policy PSPO05 - Engineering Design Standards - Roads, Drainage and
Earthworks. To avoid conflict with underground pipes or services, all existing and proposed
services required by the development shall be shown on the plans.

To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
ADAC are available at www.adac.com.au).

As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for
design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of

all services and structures. All of which shall be submitted to Council for checking and for Council's
records. :

The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in the
Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
available at www.adac.com.au).

Approval of works shail not be granted until all As Constructed information has been supplied and
accepted by Council.

5 of 8

Page 9

 

 

Environmental Health

25. The developer must provide waste storage and disposal facilities in accordance with Planning
Scheme Policy No 9 “Waste Management Multi-Dwellings and Commercial and Industrial
Premises’, including an external imperviously paved area correctly sized for all refuse and recycling
containers and suitably screened from public places and neighbouring properties. A roofed
waste/bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, or
approved wastewater disposal system via a bucket trap and grease arrestor.

26. The development must allow refuse-loading areas to be located off street. All vehicles associated
with the collection of waste/recyclables, shall enter and leave the site in a forward direction, without
the need for any unsafe maneuvering.

27. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9
“Waste Management Multi-Dwellings and Commercial and Industrial Premises’, must be submitted
for the day-to-day operation of the development and approved Y Council's Health Section prior to
issue of development permit for operational works.

It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9
explaining exactly how to predict waste quantities and design waste areas is available from Council
and the web. The Pian shall include the following information: -

° The types of waste that will be generated from the activities approved within the
development.

° Estimated volumes or tonnage of both recyclables and waste generated.

° Methods to be used for dealing with garden waste.

° Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.

° Description of procedures for getting alt waste to the bins; the storage of bins and the

collection of bins by the contractor.

° A description of the design details of waste storage and recycling areas including size,
location, elevation and floor plan, methods of bin washing and system to prevent storm
water getting into sewer via the bin wash.

. A description of types and volume of waste storage containers to be used.

° The waste and recycling storage area shall include the provision of containers for all

waste and recycling materials including putresable matter, non-recycling waste, paper/

« cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing
facilities connected to sewer.

° A detailed description of vehicular access to collect waste. Where collection is off street,
access must allow vehicles to enter and leave the site in a forward direction.

. 28. As no Plumbing Final has been issued through Noosa Council Plumbing Services, all existing
plumbing and drainage, along with Backflow Prevention Devices, are to be assessed to ensure
compliance with current Legislation and Acts.

i4- APPROVED ) PLANS/DOCUMENTS /

The “approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.

5 ADVISORY NOTES

The following Advisory Notes are for information purposes only a and do not form conditions of approval:

6 of 8

 

Page 10

 

 

41. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities
under the Disability Discrimination Act (DDA) in regard to the installation of disabled access and the
provision of disabled facilities, and that access to this building and the provision of sanitary facilities
may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the
Building Code of Australia.

2. Noise from building works associated with commercial and or industrial development should comply
with the following —

° Limited to between 7:00am to 6:30pm Monday to Saturday.
° All reasonable measures are taken to minimise noise emissions.
. Not permitted on Sunday or public holidays.

3. In accordance with the Environmental Protection (Water) Policy 1997, al! sand, silt, mud, paint,
cement, concrete, builder's waste or rubbish should not be permitted to enter or be placed where it °
could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse.
On the spot fines apply for such offences.

4. The applicant is informed that payment via credit card transaction will not be an acceptable method
of payment for development contributions conditioned in this permit or for infrastructure charge
notices issued separately.

Aboriginai Cultural Heritage Act 2003

There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals
pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).

The ACH Act establishes a cultural heritage duty of care which provides that: “A person who caries out
an activity must take all reasonable and practicable measures to ensure the activity does not harm
Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary
penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be
issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue
stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.

You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations
under the ACH Act.

6 PROPERTY NOTES
Not applicable

7, PRELIMINARY APPROVAL OVERRIDING SCHEME,
Not applicable

7 of8

 

Page 11

8 FURTHER DEVELOPMENT PERMITS REQUIRED

Type of Development Permit Subject of the required Development Permit
required .

Development Permit for Building Works All Building Works

Development Permit for Operational Access, Carparking, Roadworks, Stormwater Drainage,
Works Frontage Works and Erosion and Sediment Control.

9 SELF ASSESSABLE CODES

The developer must comply with the following codes for self- assessable development related to the
development approved under this Decision Notice:

Advertising Devices Code

8 of 8

 

Page 12

 

 

 

 

  

 

 

 

 

SQORO’
Sey uate

 

 

 

 

 

 

 

 

FACTORY BELOW

 

 

 

 

 

 

 

 

 

 

 

STORE ‘STOREROOM

 

 

 

‘TELEMARKETERS

 

 

 

 

 

 

 

 

FARM HOUSE

 

 

 

 

 

 

 

 

 

 

 

é .
sf a
A
Ay COOROY MOUNTAIN SPRING WATER FACTORY UPPER LEVEL PLAN /~™ SCALE 1:200 (42)

*
A

Page 13

 

.
/
“SCALE 1:200 (42)

MOUNTAIN
Spey Veter

 

LOWER LEVEL PLAN

   

 

 

preseee esses

 

Page 14

 

DRAFT

   
   
   
 
  

Truck Drivers Code of Co

Cooroy Mountain Spring Water
314 Cooroy Mountain Road, Cooroy

water. Access to the site from the Bruc
Topaz Street and Cooroy Mountain Road.

sidential dwellings.

  
    
   

Cooroy

e All drivers mt
other road use

bey all s nis, directions and instructions and display respect and courtesy for

«The use of engine is prohibited in residential areas in close proximity to the site including
along Topaz Street and Cooroy Mountain Road except in the case of an emergency ie safety
requirement, ;

¢ All vehicles entering our site must be fully roadworthy and maintained. CMSW reserve the right
to inspect any vehicle or request maintenance records for any vehicle. CMSW reserves all rights
to prohibit any vehicle from the site if we believe it may not be roadworthy, safe to operate or
generates excessive noise.

¢ Any accidents, incidents, complaints, spillages or near misses that occur are to be reported to
the CMWS General Manager as soon as possible after the occurrence.

17a

 

Page 15

e Any litter is to be placed in the litter bins provided on site.

e Notrucks are to access the site prior to 7am on any day of the week.

© Delivery hours for trucks are limited to the time period 7am to 6pm Monday to Saturday.

© The use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road is to be
prohibited except in the case of an emergency ie safety requirement.

¢ Maximum speed of Travel on Topaz Street and Cooroy Mountain Road is to be 60 km/h.

e Maximum speed of travel on site is 30 km/hr.

    
  

Drivers who are found to not comply with the above Code
subsequent infringements may result in disciplinary acti

duct shall be issued a warning, any

 

FHFEFEELEFE THEFT TE Tt tt tt ttt ttt tt ttt ttt $: Att ttt tet FFFFHEF FHF Ft t+ ttt tt +t+

 

 

Cooroy Mountain Spring Water a /

   
   
 

Confirmation of Understanding of the Code

 

 

 

(print)

Of (company)

Have read/had the Drivers : i ithe requirements of the Code. |
confirm that | will comply. fi ements of:the: Drivers Code:

 

 

 

 

 

 

Endorsed by:

 

(CMSW Repr.

sO 17b

 

Page 16

 

 

 

GILBERT+SUTHERLAN

agriculture - water - environment!

Conceptual Effluent Treatment

. and Disposal Strategy
Redevelopment of Cooroy Mountain
Spring Water bottling facility
Cooroy Mountain Road,

Mt. Cooroy, Queensland

Prepared for
Cooroy Mountain Spring Water Pty Ltd

November, 2009

Page 17

Cooroy Mountain Spring Water CEDA Cooroy Mountain Road, Mt. Cooroy QLD

Document control

 

Document:
Title:

Project
Manager:

Author:

HJ0085-1_CEDA_RGH1F1

Conceptual Effluent Treatment and
Disposal Strategy, Redevelopment of
Cooroy Mountain Spring Water bottling
facility, Cooroy Mountain Road,

Mt. Cooroy, Queensland

Neil Collins

Greg Holland & Dan Smith

 

 

Client:
Client Contact:

Client
Reference:

Cooroy Mountain Spring Water Pty Ltd
Greg Dinsey

 

Gilbert & Sutherland P/AL
ABN 56 077 310 840

Originating Office: Kawana
Suite 1, Level 2

Regatta Lake commercial

6 Innovation Parkway
Birtinya, Q4575

Telephone 07 5493 9911
Facsimile 07 5493 9877
[email protected]

Also at Robina
and Brisbane

 

Synopsis:

This report describes the proposed wastewater loadings, treatment method and disposal
strategy for the redeveloped Cooroy Mountain Spring Water bottling facility, Lot 2
SP143409, 314 Cooroy Mountain Road, Mt Cooroy, Queensland.

 

Revision History

 

 

 

 

 

 

 

 

 

Revision # Date Edition By Approved By
1 14.10.09 G. Holland D. Smith N. Collins
2 26.10.09 G. Holland D. Smith N. Collins
3 10.11.09 G. Holland D. Smith N. Collins

 

 

 

Distribution

Distribution

Revision Number

5

Cooroy Mountain Spring

Water
IPA Law

G&S library and file

G&S Kawana

 

6

 

“is

iy

ast]

HOU

Page 18

—_ oo

om meme

NCH

35

ly

LHD

GILBERT+SUTH ERLANG

Summary

This report describes the proposed wastewater loadings, treatment method and disposal
strategy for the redeveloped Cooroy Mountain Spring Water bottling facility, Lot 2 SP143409,
314 Cooroy Mountain Road, Mt Cooroy, Queensland.

An Effluent Disposal Report has been previously prepared for the site as part of the MCU
Development Application. This current conceptual assessment constitutes a revision of the site
effluent treatment and disposal strategy in accordance with AS/NZS 1547:2000 ‘On-site
domestic wastewater management’ and the experts agreement dated 2 September 2009, and
refers to the findings of the previous report where relevant.

In performing this assessment site physical characteristics and site soil suitability have been
reviewed.

An approved secondary wastewater treatment system will be used to manage wastewater
generated by the development. An irrigation area of 1,180m? will be required to assimilate the
proposed volume of treated wastewater. We consider there is sufficient land area on the site to
accommodate the irrigation area and an increase in area if required.

This report concludes that sustainable irrigation of treated wastewater within the site, in
accordance with the advice contained herein and applicable guidelines, is achievable.

As this is a conceptual design, a further detailed effluent treatment and disposal strategy

including MEDLI modelling will need to be prepared to support future operational works
applications for this site.

Page 19

Cooroy Mountain Spring Water CEDA Cooroy Mountain Road, Mt. Cooroy QLD

Table of contents

1) INtFODUCTION ..-.ssseccssseeescssseescssresssssesennesconteccesnseseusnscsstsueceestsnterssusseapersarersosensnacatanneransureesuneeesnueeess
2) Proposed development .
_ 3) Site characteristics...

 

 
  
   
 
 
 
  
 
 
 
 

3.1 Site location
3.2 Geology ...
3.3 Soil classification
3.4 Topography and drainage.
B.S Vegetation......cccssecsereeee

4) Previous assessment.

 

4.1. Wastewater loading.
4.2 Soil types...
4.3 Permeability.
44 Irrigation area

5) Effluent treatment system and land application area ..........csccccseescseessesesssesessssesessnveccavecesanecsese 5-1

5.1 Wastewater loadings ...
5.2 Bottling facility wash down
5.3 Licensing requirement.......
5.4 Proposed wastewater treatment system
5.5 Proposed method of disposal...
5.6 Proposed irrigation area.
5.7 Buffer distances...............
5.8 Additional buffer requirement.

6) System maintenance

6.1 Disinfection.
6.2. Unit maintenance.
6.3 Maintaining the land application area ..

 

 

  
 
 
 

7) CONCIUSIONS........-.ecssesseessecsessesstesnessecaceateseeenees

 

lerepy wy

135 §-S8N0TH

C

Page 20

a
c
-S
Se
co

DUES

Oy wos

 

1) Introduction

Cooroy Mountain Springwater Pty Ltd
commissioned Gilbert & Sutherland Pty Ltd
(G&S) to prepare a Conceptual Effluent
Treatment and Disposal Strategy for Lot 2
SP143409, 314 Cooroy Mountain Road,
Cooroy Queensland (‘the site’). The site
occupies a total area of 48.17 hectares and
is shown on Drawing HJ0085.1.1.

An Effluent Disposal Report was previously
prepared for the site by Global Testing Pty
Ltd in 2007'.

This current assessment constitutes a
revision of the site effluent treatment and
disposal strategy in accordance with AS/NZS
1547:2000 ‘On-site domestic wastewater
management’ and the experts agreement
dated 2 September 2009.

The issues raised in the Report of Experts
Meeting September 2, 2009 relevant to this
conceptual assessment are reproduced
below.

° An updated effluent treatment and
disposal strategy (ET&DS) is
required for the project, to
demonstrate that adequate
treatment of wastewater from
plant and wash down, and from
staff and suitable on site disposal,

 

‘ Pinkney, M.S., 2007, Effluent Disposal Report -
Existing residence & proposed extensions to existing
factory, 314 Cooroy Mountain Road, Cooroy, Global
Testing , Noosaville, Queensland,

GILBERT+SUTHERLAND,

taking account of current plant
staffing and waste generation
figures. A conceptual ET&DS
should be completed by G&S to
support the current application, to
outline EP's to be treated,
treatment process, and disposal
areas and locations. This work
should include suitable sampling
and testing of the current waste
stream discharge, appropriate to
the relevant sources.

A further investigation of actual
EP's being generated by the
combination of plant, wash down
and staff wastewater is to be
carried out by G&S to support the
current application, and to assess if
additional ERA licensing is required
for the site.

In performing this assessment site physical
characteristics and soil suitability have been
reviewed.

1-1

Page 21

 

 

ue ed
ee es ee

 

 

 

 

 

 

 

 

 

@ 8 e ° e°.”.-
o
YX
e
° . ,
Ao a
a ‘4g os
&
¢ 2.
a.
o &
a
a : *
a ° "3, os a
e
Lo
o
*
a
. es
oo" i
t a a
a raancr ” :
GILBERT+SUTHERLAN COOROY MOUNTAIN SPRINGWATER S
a agriculture - water -environment\ | MT COOROY BOTTLING FACILITY * bles
° Sulte 1, Level 2 Regatta Lake Commercial | COOROY MOUNTAIN ROAD 2” or
it 2] 6 Innovation Parkway, Bitinya Qid. 4575 4 may
LEEEEME Phono 5493 9911 Fax 5453 9877 < | SITELOCATION =, —s <f ‘
- Sep een NPRNED . Rarrrorroccue) | ORANN 0.08,
PVE Ae Tose ce ee NP ve seenee veecneD

 

 

 

 

 

 

 

 

Page 22

LdiHOW v.

zy"!

“S200fH

a

2) Proposed development

The proposed development the subject of
the MCU application consists of:

a single on-site residential dwelling,
a steel framed shed complex containing
bottle wash and filling areas, storage
area, holding tanks and loading areas,
© areas of hardstand surrounding the
above shed for car parks, loading bays
and site access; and
¢ office wing including reception,
administration and staff amenities.

Drawing HJ0085.1.5 shows the proposed
redevelopment layout.

GILBERT+SUTHERLANG

It is proposed that wastewater generated
by the redevelopment will be treated to a
secondary standard before being irrigated
onto an appropriate disposal area which
meets all planning requirements.

The calculation of the wastewater loadings
used in this assessment is detailed in Section
5 of this report. The anticipated wastewater
loadings from the development will be
equivalent to a 17 EP sewage treatment
system. Therefore, this proposal will not
require an ERA63 licence.

2-1

Page 23

 

 

 

 

 

    

 

\ RpeSENEREMELSs

 

   

Are

irrigation’areaki

    

 

Ss Rarrciens

 

NeYelasdiaye)

 

  

 

GILBERT+SUTHERLAN

agriculture - water - environment

Suite 1, Level 2 Regatts Lake Commercial
6 Innovation Parkway, Birtinya Qid. 4575

PROJECT

COOROY MOUNTAIN SPRINGWATER. : 3

PROPOSED REDEVELOPMENT PLAN

MT COOROY BOTTLING FACILITY 70-3.
COOROY MOUNTAIN ROAD. ts

 

 

 

 

 

 

 

= Phone 6493 9911 Fax 54939877 -
ie Cara Fowenoumemaro | me camnom [mwnocs | >wmow
(GE READ 0k PREFERENCE . °
TOSCALNG. se ee bt sD pave secn08 CHECKED HJ0085.1.5~
=

 

 

 

Page 24

 

3) Site characteristics

3.1 Site location

The proposed development site is located
at 314 Cooroy Mountain Road, Mt. Cooroy,
Queensland. The site is properly described
as Lot 2 on $P143409, Parish of Tewantin.

3.2 Geology

A review of the Queensland Department of
Mines and Energy 1:100,000 Gympie Special
Sheet? geology map indicates that the
elevated sections of the site are underlain
by Tertiary Rhyolite formations while the
Jower portions of the site surrounding
waterways are located over early to middle
Triassic Arenite, Argillite and Phyllite of the
Kin Kin Beds formation.

3.3 Soil classification

While no on-site soil studies have been
undertaken by Gilbert & Sutherland as part
of this assessment, the above geology is
known to give rise to a number of soil
types’.

Soils based on Tertiary Rhyolite formations
are generally acidic in nature and produce
Tenosols, Sodosols and Kurosols.

Kin Kin bed derived soils tend not to be as
acidic and have been found to produce red
and yellow Chromosols and Tenosols.

A detailed soil survey and permeability
testing would be undertaken as part of the
detailed assessment at Operational Works
application stage.

3.4 Topography and drainage

Elevation at the site ranges from
approximately RL105 metres along the
central waterway to greater than RL140
metres in the steeper south-eastern and
eastern portion of the site. The slopes are

 

2 Queensland Department of Mines and Energy, 1999,
Gympie Special Sheet, 1:100,000 geology map,
Queensland Government, Brisbane.

3 Shields, P., 1995, Geology and Soils'of Noosa Shire,
Noosa Shire Planning Scheme Review, Noosa Shire
Council, Tewantin, Queensland.

GILBERT+SUTHERLAND,

typically ‘very gently inclined’ (<3%) to
‘moderately inclined’ (>20%).*

Runoff from the site flows towards a small
un-named waterway flowing across the
site. This waterway flows from the south-
west corner of the site toward the north-
east and eventually onto Lake McDonald.

A number of small dams are located on-site
which serve to provide water for grazing
stock and capture site run-off for irrigation
of landscaped areas.

3.5 Vegetation

With the exception of the relatively smalt
The majority of the site is cleared and
covered by pasture grasses for cattle
grazing purposes. The bottling facility site
was also previously cleared and planted to
pasture for this purpose.

A significant area of mature trees and other
planted vegetation is located to the east of
the bottling facility and incorporates the
eastern drainage line, with scattered
riparian vegetation (both pre-existing and
planted) occupying the banks of the main
tributary to the west of the bottling facility
and towards the northern boundary. This
vegetation is currently mapped as regrowth
area under the Queensland Regional
Ecosystem (RE) classification.

Further dense vegetation exists on the
eastern boundary which is mapped as
dominant “Of Concern” and remnant “Not
of Concern” under the Queensland
Regional Ecosystem (RE) classification.

“ McDonald, RC, tsbell, RF, Speight, JG, Walker, J and
Hopkins, MS 1990, Australian Soil and Land Survey
Field Handbook, Australian Soil and Land Survey
Handbooks, 2nd edn, vol 1, Inkata Press, Melbourne.

3-1

Page 25

Cooroy Mountain Spring Water CEDA Cooroy Mountain Road, Mt. Cooroy QLD

4) Previous assessment

The outcomes of the previous assessment
by Global Testing are as follows.

4.1 Wastewater loading

At the time the report was prepared the
predicted wastewater loading was a total
of 1950L/day comprised of:

* 900L/day from the existing 3
bedroom household; and

¢ 1050L/day from the extended
bottling facility (21 persons @ 50L
per person per day).

4.2 Soil types

Soil encountered at the site of the
proposed irrigation area was defined as a
moist brown silty, sandy clay overlying a
moist red/brown silty, sandy clay. No
indication of soi! structure was given.

 

4.3 Permeability

Three separate infiltration tests were used
to determine that the average permeability
for the chosen disposal site was 0.22m/day
and consequently a design irrigation rate
(from AS1547) of 20mm/week was adopted.

4.4 Irrigation area

Based on the above information Global
Testing recommended that a gypsum
treated surface spray irrigated area of
683m? would be sufficient to assimilate the
wastewater generated.

In accordance with the required Noosa
Shire setback distance for properties
located with the Lake MacDonald
catchment the proposed area was to be
jocated near the western lot boundary to
the south of the access road.

Page 26

 

 

5) Effluent treatment
system and land
application area

This Conceptual Effluent Treatment and
Disposal Strategy was conducted using a
combination of new data and data taken
from the previous site investigation
undertaken by Global Testing in 2007.

The proposed treatment and application

methods to be employed on-site are based on

the following guidelines and authorities:

« the ‘Queensland Plumbing and
Wastewater Code, 2006’

© AS/NZS 1547:2000 ‘On-site Domestic
Wastewater Management’ 5

* Planning Guidelines for Water Supply and
Sewerage ©

* Queensland Water Recycling Guidelines,
2005.’

Based on previous testing detailed in
Section 3 of this report and the proposed
site use, it is proposed that the most
effective and flexible method of irrigating
treated wastewater for the site would be
via surface sprinkler.

In calculating a suitable disposal area for
the predicted wastewater loadings, the site
was assigned a conservative permeability of
0.22m/day in accordance with Category 5
soils as detailed in Table 4.2A4 of AS/NZS
1547:2000. A conservative proposed
irrigation area for the expected effluent
Joadings was therefore calculated
incorporating the recommended design
irrigation rate (DIR) of 20 mm/week for a
category 5 soil from Table 4.2A4 of AS/NZS
1547 (2000). This is detailed in Section 5.4.

5.1 Wastewater loadings

The following proposed wastewater
loadings are based on interviews with
Cooroy Mountain Spring Water staff and

 

5 Standards Australia/Standards New Zealand, 2000,
ASINZS 1547:2000 On-site domestic wastewater
management.

’ Department of Natural Resources & Mines, 2005,
Planning Guidelines for Water Supply and Sewerage.
Chapter 5 - Demand/Flow and Projections - Table A.
7 Queensland Government, Environmental Protection
Agency, 2005, WaterWise Queensland. Queensland
Water Recycling Guidelines 2005.

 

GILBERT+SUTHERLANG

data obtained from Appendix 4.2D of
AS/NZS 1547:2000.

Table 5.1.1 lists the wastewater generating
activities at the redeveloped site during the
peak summer period when the facility is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

fully staffed (48 persons).
Table 5.1.1 Proposed wastewater volumes
Source Volume | Number | Volume
per of of waste-
person | people water
(L) (Uday)
On-site 180 5 3900
residence
Dual flush 27.5 48 1,320
toilet*
Hand . 8 48 384
washing**
Kitchen 5 48 240
Misc. 10 48 480
TOTAL - 3,324
*Assumes 11/5.5 dual flush cistern, with 1 fult
flush and 3 half flushes per person per day.
** Assumes 4 x 2L washes per day.

 

 

For the on-site residence it is assumed that
it will be a permanent 5 person household
connected to a bore water supply (i.e.
180L/person/day).

For the bottling facility and administration
block, the above loadings assume a total of
50.5L/person/day. This is in line with the
loadings for industrial use (50L per person)
from AS1547:2000. .

5.2 Bottling facility wash down

In addition to the above tabled wastewater
generation projections there is a volume of
water used on a weekly basis to hose down
the internal shed floors. This is performed
once a week using a pressure cleaner to
conserve water and expedite the task.

This water is currently collected in a
connected series of concrete drains
embedded in the shed floor. It is proposed
that these will drain to a central
underground sump equipped with a pump
and float switch to enable the contained
waters to be pumped to the effluent
disposal system as the sump level requires.

Assuming that the pressure cleaner uses
600L per hour and the wash down takes
half an hour, it is estimated that the

5-1

Page 27

 

Cooroy Mountain Spring Water CEDA Cooroy Mountain Road, Mt. Cooroy QLO

volume of water required undertaking this
task will be 300L per week or an average of
43L per day. Added to the total above the
total volume of wastewater to be treated
will be 3,367Uday.

Wastewater loadings from the bottling
plant process are dealt with in the
Conceptual Stormwater Assessment report
by Gilbert & Sutherland (2009).

5.3 Licensing requirement

Using the formulae presented in the
Queensland Environmental Protection policy
(Water) 1994 - Environmental Protection
Regulation (2008) Section 63, one Equivalent
Person (EP) generates 200L per day. Thus the
proposed development will require a ~17 EP
wastewater treatment system. As this is less
than the 21 EP threshold the system does
not constitute an Environmentally Relevant
Activity (ERA) 63 licence and does not
require Department of Environment and
Resource Management (DERM) approval.

5.4 Proposed wastewater
treatment system

It is proposed that wastewater generated
on-site will be treated to a secondary
standard within a water treatment plant
(WTP) utilising either of the following
treatment methods:

* activated sludge system

* biological trickling filter system

* extended aeration system

* aerated/aerobic sand filter system

5.5 Proposed method of disposal

It is proposed that the treated effluent
from the bottling facility redevelopment
will be surface irrigated onto a designated
irrigation area.

The surface-spray irrigation system
proposed will allow regular small
applications to be applied to the
nominated irrigation area to maintain
optimal soil moisture levels while
minimising deep percolation and surface
run-off. Additionally, surface spray
applications maximise evaporation further
assisting with wastewater disposal.

All such irrigation would be undertaken in
accordance with the requirements of the

5-2

Queensland Water Recycling Guidelines and

AS/NZS 1547:2000, including the following:

+ The designated land application area must
comply with setback distance
requirements.

+ The presence of buried pipes shall be
indicated by using underground marking
tape to AS/NZS 2648.1 or be indicated by
warning signs at the boundaries of the
designated area, clearly visible to property
users, which would read in English and
any other appropriate community
language: ‘Sewage effluent pipework
installed below. DO NOT DIG’.

+ Warning signs should be erected near the
wastewater treatment system, be clearly
visible and read in English and any other
appropriate community language:
“RECYCLED WATER BEING USED - DO NOT
ORINK’.

+ All recycled water signs should comply
with AS1319-1994 Safety Signs for the
Occupational Environment.

« No run-off or seepage of effluent should
occur beyond the designated irrigation
area.

+ Effluent must not come into contact with
people, domestic or farm animals or any
crops intended for human consumption.

+ The owners of the system must enter into
@ contract with an organization
authorised by Council and/or EPA for the
servicing of the unit on a regular basis.

+ The land application area/s should be
maintained with purposely planted
grass/turf or trees/shrubs to maximise the
nutrient uptake and minimise deep
percolation of nutrients through the soil
profile.

5.6 Proposed irrigation area

In order to estimate an appropriate land
application area for the expected loadings,
the method of catculation for an irrigation
area from AS1547—1994 was used.

The equation for sizing a surface irrigation
area from Section 3.6.2(c) of AS1547—1994
is as follows:

Ai = qw/DIR

Where

Ai = irrigation area required
qw = total quantity of effluent

generated in a week, in litres

Page 28

| DIR = = design irrigation rate in mm/week

Therefore:

qw = 3,367L (from Table 5.1.1) x 7 days

t = 23,569L/week

ro DIR = 20mm/week (adopted from Global
' Testing report in Section 3)

I Ai = 23,569/20 = 1,180m?

| Assuming the conservative DIR of
20mm/week determined above, a minimum

| of 1,180m? is required for irrigation.

| Drawing number HJ0085.1.5 shows the

proposed redevelopment layout and
proposed irrigation area locations.

5.7 Buffer distances

Code (2007)*):

Secondary treated effluent
© 6m from an in-ground rainwater tank
used as a potable water supply for

i humans or animals.

* 30m from a dam, bore, weil or
permanent watercourse (embankment).
{ * 30m from an intermittent watercourse
(embankment) or drainage channel
t provided that they are not
. directly/indirectly used as a potable water
| supply for humans or animals.
* 6m from the water's edge of swimming
[ pool when located lower than the
: disposal area or 3m when higher (must
| also be outside of the pool enclosure).
t

~S800fH

ge wgI>”

a

and Wastewater Code’ (2007).

 

{ To protect downstream environmental

| values and prevent potential human health
impacts, the following setback distances
apply for effluent irrigation areas

L . (Queensland Plumbing and Wastewater

t

8 Queensland Department of Local Government,
Planning, Sport and Recreation ‘Queensland Plumbing

GILBERT+SUTHERLANG

© 4m from property boundaries, pedestrian
paths, footings of buildings, walkways,
recreation areas or retaining wall
footings and the like when focated
downslope from the disposal area, or 2m
when upslope or level.

For public health reasons the disposal areas
must have signage in accordance with
AS/NZS 1547:2000.

5.8 Additional buffer requirement

Further to the above recommended setback
distances the Noosa Shire Plan Planning
Scheme Policy 24 - Effluent Disposal
(effective February 3, 2006) requires that all
effluent disposal irrigation areas are to be
located not less than 100m from any
permanent or intermittent watercourse.

To this end it is proposed that the irrigation
area for this site will be located near the
western fot boundary to the south of the
access road, See Drawing No.HJ0085.1.6 (at
the end of this section).

5-3

Page 29

ee —a—a—a—a—<—a aie a es i ea a ei aes

 

 

 

 

 

 

 

 

a

SS cae =

 

G82222 . 272?)
eam _ agriculture - water -environment\ | MT COOROY BOTTLING FACILITY”
q oe Pyaar Suite 1, Level 2 Regatta Lake Commercial: COOROY MOUNTAIN ROAD |
Image Source: Google Early 6 Innovation Parkway, Birtinya Qld. 4575 3 , a .
Phone 5493 9911 Fax 5493 9877 100m IRRIGATION AREA BUFFER EXTENT
FIQURED ORENSIONS TO APPROMED SCALE AS SHOWN ORAWH OG. ORR to, ‘
GE READ IM PREFERENCE : ‘
Toscuma wo ey Ponte omen = HJ0085.1.6 '

 

 

GILBERT+SUTHERLAN

PROJECT -
COOROY MOUNTAIN SPRINGWATER

 

 

 

 

 

 

 

 

 

 

Page 30

meee

—_— oe

ee

 

6) System maintenance

6.1 Disinfection

Where effluent is irrigated across the
ground surface, disinfection is considered
necessary and may include chlorine
addition or the use of UV, Ozone or
membrane technology.

6.2 Unit maintenance

To reduce any risk associated with the
operation of aerobic treatment plants, they
must be maintained regularly by a
registered service agent so that the
discharge criteria for the reclaimed effluent
are satisfied at all times. This maintenance
must be carried out in accordance with the
requirements of the manufacturer and to
the satisfaction of Council.

As part of the quarterly service, studge and
scum levels should be monitored.

Anaerobic chambers should be desludged
by an approved contractor, as required.

GILBERT+SUTHERLANG

6.3 Maintaining the land
application area

The fand owner or occupier is responsible for
the maintenance of the land application
area and should ensure ponding and runoff
from the area does not occur.

The irrigation area requires regular
harvesting (mowing/pruning) and removal
of clippings to ensure that nutrients are
removed from the system and to promote
continued growth, nutrient assimilation
and water uptake. A high level of ground
cover must be maintained at all times to
minimise potential erosion.

The land application area must be inspected
regularly to assess its physical condition. The
most obvious signs of system failure would
be odour or surface ponding of water. Any
irrigation area rectification work is to be
performed by a licensed drainer.

6-1

Page 31

-SS00re

“woay7

MOE

7) Conclusions

A conservative assessment of site
conditions was undertaken to determine
its suitability to accept on-site disposal of
treated wastewater generated by the
proposed bottling facility development.

An approved secondary wastewater
treatment system will be used to manage
wastewater generated by the development.

An irrigation area of 1,180m? will be
required to assimilate the proposed volume
of treated wastewater based on the
conservative loadings of 3,367 week.

The size of the site will ensure this area is
available and that an increase in area is also
possible if required.

GILBERT+SUTHERLANG

This report concludes that irrigation of
treated wastewater within the site, in
accordance with the advice contained
herein and applicable guidelines is
achievable.

As this is a conceptual design, a further
detailed effluent treatment and disposal
strategy including MEDLI modelling will
need to be prepared to support future
operational works applications for this site.

Page 32

 

 

8) Limitations of reporting

Gilbert & Sutherland Pty Ltd has attempted
to be accurate providing this information.
The interpretation of scientific data,
however, involves professional judgement.
As such, interpretation is open to error.

In recognising the potential for errors in
scientific interpretation, Gilbert &
Sutherland Pty Ltd does not guarantee that
the information is totally accurate or
complete and clients are advised not to rely
solely on this information when making
commercial decisions. Any representation,
statement, opinion or advice, expressed or
implied is made in good faith and on the
basis that the authors, Gilbert & Sutherland

GILBERT+SUTHERLANG

Pty Ltd, their agents or employees are not
liable (whether by reason of lack of care or
otherwise) to any person for any damage or
loss whatsoever which has occurred or may
occur in relation to that person taking or
not taking (as the case may be) action in
respect of any representation, statement or
advice referred to above.

Furthermore, this information should not
be relied upon by any other persons than
the client for whom this information was
compiled. This information reflects the
specific brief and the budget of the client
concerned, who enjoys an individual
tolerance of risk.

Used in these records

About this file

File size
6.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

132006.268.03 - Original Court Approval - Attachment 1.pdf · 6.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.