27 June 2007 q iy 2?
" {eo .
a) | ae COUNCIL ©
NOOSA 5 USE
Robert G Utz & Stephen J Clague 0 Ww
CARE Kidd & Co Designers / 4
| PO Box 262 Cu Ww
NOOSA HEADS QLD 4567
| Dear Sirs,
Re: Application for Operational Works for 18 Weyba Street, Sunshine Beach
| refer to the above-mentioned application for Operational Works, which was lodged
with Council on 24 May 2006. —
Council received correspondence dated 20 July 2006 indicating that the other
information requested as part of Council's Information Request dated 21 June 2006, _
was to be forwarded upon receipt of the Decision Notice for the Material Change of — at
Use approval (06/0138). This Decision Notice was issued on 14 July 2006, andtodate i;
Council has not received this outstanding information, which includes further details on’
the design of soakage pits, existing site and soil conditions to cater for infiltration and ~~ a
the provision of rainwater tanks. SS
In addition, there has been no payment of bonds and coniributions in accordance with -
the conditions of the Material Change of Use approval and evidence that Portable Long
Service Levy has been paid has not been provided.
Should the above not be received by 18 July 2007, then a Preliminary Approval for the
above application may be issued. The Preliminary Approval does not grant approval
for the works to commence. A further application for a Development Permit, together
with the relevant forms and fees will need to be fodged with Council for assessment.
You are reminded that these permits, if issued, do not extend the relevant (currency)
period for any other approval, which may lapse independent of this application. .
. Should you have any queries in relation to this matter, please do not hesitate to contact
me on the above number.
Yours faithfully,
TruflQ fe . .
Tracy Arthur h ,
PLANNING OFFICER f 3B3PY cheque
18fn fo?
te
NOOSA COUNCIL ABN OF Go& 14:12)
9 Pelican Street Tewantin PO Box 141 Tewantin Q 4365
A c:\datawrks\temp\1 660668\document2.doc Phone: 07 5449 5200 Fax: 07 S47 1062 1
Email: mailbon@monsa ald one auSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 sections
Section 2
rg
4 July 2007
&) ) © SCG Ref: 16078(L1)
CONSULTING ENGINEERS
Kidd & Co Designers,
PO Box 262
Noosa Heads Q 4567
Dear Sirs,
Re: 18 Weyba Street, Sunshine Beach
We have reviewed the recent letter from Noosa Shire Council dated 27th of June 2007,
regarding the application for Operational Works for the above project. In short, the letter
states that there remains additional information required to complete the Operational Works
approval.
We have reviewed our current Operational Works documentation and in particular our
drawing 16078 — OW1, Revision A. This drawing shows details of the information
requested by Council and was issued back in September 2006. In particular stormwater
soakage pits and the provision of rainwater tanks for re-use. However, in reading through
council's decision notice, it became apparent that there was a request to ensure that
overflow from water tanks was to be directed to the street. We have therefore revised our
current drawing by relocating the water tanks towards the front of the property to enable the
overflow to reach the street. We have enclosed copies of the revised drawings, 16078 —
OW1, Revision B.
Furthermore Council has requested in their recent letter that details be provided for the
design characteristics of the soakage pits and the ability of the surrounding soils to cater for
infiltration of the stormwater. We can confirm that as the geotechnical engineers for the
project, the natural sand is capable of absorbing the proposed stormwater run-off. These
soil conditions were confirmed in our site investigation report 16078(S). We have also
included a copy of this report for your information. The pits were also designed for a Q100
storm event.
Trusting the enclosed information is adequate for your client to obtain Operational Works
approval. PleaSe do not hesitate to contact the undersigned should further information be
required
Yours Fait ,
SEAN SHARP-RICHARDSON
For and on behalf of
SCG CONSULTING ENGINEERS
_ Enc.
ese emsameanmapee nantes
. Oreo Lae blo)
LAC CUMS L | : °
2 emait@scg-engineers,com
po box 1661 noosa heads g.4567
18 duke st sunshine beach q. 4567
STRUCTURAL * CIVIL * GEOTECHNICAL
DEBUILD PTY LTD TRADING AS ABM 40 098 481 899Section 3
. si ¥
: —_ ICE COP |
| - OFFICE COPY
. | | (cS 1Ro aracned |
eee | 31 March, 2006
, SCG Reference: 16078(S)
_ Utz + Clague
C/- Kidd & Co. .
, ae P O Box 262 .
NOOSA HEADS QLD 4567 . oe
’ 0 SOIL TEST & FOOTING REPORT: 18 Weyba Street, Sunshine Beach ,
oe | 4.0 * INTRODUCTION: | |
! / . This company has performed a site classification in accordance with AS 2870-1996 and . ;
‘ made recommendations based upon the classification for a building to be constructed —
a . at the above site. This report does not include an assessment of Slope Stability, -
. Landslide Risk, or specifications for*damp proofing, termite protection, moisture
oe barriers, tie down, bracing or structural member sizing.
7 oo - This report relates only to the above property and proposed construction as described |
e “ below: . ‘
- po "=" Proposed Construction © Residential Duplex
SO ee external Walls... os ; Block / Timber
. = intemalWalls. | [Timber
oO Passes... Ground Floor Slab on Ground
he Building Platfom:. =. | [Cut Pad
- [o.oo Blockwork Articulation | | _s«sRequired @ centres - |
” This report must be read and considered as a whole. All of our recommendations,
foundation sections and appendices must be read, considered and followed by all-
. people involved in this project to ensure adequate long term performance of the footing
-. + system and the structure it supports. If you are unsure of any of the requirements
BT , herein, you must seek clarification from this office. , .
| 2.0 SITE CLASSIFICATION: | oe .
*. . After considering the results of our field investigation performed on 24/3/2006 we have.
; classified this site as: .
. | ’ ~. Class P/S
CCL Aen . ;
‘ f 07 5447 2634 ‘
e emailascg-engineers.com /
feraRerey Mich MrT heads q.4567 Se :
. Yet Cased ar ulata elaine: ae . . ‘
STRUCTURAL * CIVIL «GEOTECHNICAL
. Pls teehee Se ee se cid / . .Section 4
The classification has been calculated from test work performed on the soil profile encountered on the
day of our fieldwork and consideration .of AS2870-1996. The ‘P’ Classification relates to the loose sands
encountered in the upper profile of our test sites. Any disturbance of the soil profile, may result in a
change to the classification. The attached design, has allowed for the influence of the earthworks
described in section 5.0 below.
3.0 SITE DESCRIPTION:
; The construction area has a gradient in the order of 4%.
Vegetation on the construction area (and nearby surrounds) consists of grasses and scattered trees.
The existing surface drainage is fair and sub-surface drainage is good.
4.0 FINDINGS:
The soil profiles encountered are shown on the attached log sections.
No water table was encountered during our testing program.
The sandy soils encountered are susceptible to collapse when unconfined. This may effect excavations
and result in additional earthworks and increased concrete volumes. For further information please refer
to the attached critical line diagram.
The samples classified on site were assessed as having low to negligible plasticity, therefore laboratory
testing was considered unnecessary.
We have assessed the expected differential movement of the soil profiles encountered to be the
equivalent of a site with a Ys of less than 20mm.
For buildings within the scope of AS 2870-1996, safe bearing is available at 300mm into the MEDIUM
DENSE SAND. This strata is shown shaded on the attached logs
‘ 5.0 SITE PREPARATION DETAILS:
We recommend scraping this site free of all organic material and debris, then cutting the construction
area to form a level pad. There must be no fill placed beneath the foot-print of the building. The
’ prepared construction pad must be entirely on cut natural ground. A small surface spoon drain with a
suitable outflow should be excavated at the base of the cut. Any fill placed outside the foot-print should be
clean material from the cut, laid out in 150mm (maximum) layers and tracked rolled with the excavator
(six passes in each direction). Cut batters of 1 to 2 (vertical to horizontal) and fill batters of 1 to 3 will be
stable providing ail fill is compacted as above and exposed banks are protected against erosion.
Where a retaining wall is required, a cut batter of 1 to 2 (vertical to horizontal) in the sand profile taken
from the base of the proposed walt should be excavated. These earthworks must incorporate shallow
surface spoon drains at the base and along the high side of the cut. Drains must have an efficient outflow
down-slope and clear of the construction area. The exposed face should also be protected against the
potential for stormwater erosion. Should these recommendations be un-achievable the builder should -
seek guidance from this office on temporary shoring, benching or other suitable techniques.
Areas where existing structures or trees are removed shail be backfilled with engineer approved fill
materia! compacted in accordance with AS2870-1996, or alternative measures to be provided by the
engineer.Section 5
. ‘a ff .
Any loose or soft material uncovered in the site preparation shall be removed and replaced with approved
fill material compacted in accordance with AS2870-1996, or alternative measures to be provided by the
engineer.
Site drainage during construction is important. Stormwater run-off should be diverted away from any
foundation excavations and not be able to pond within 5.0m of the building footprint. Temporary spoon
drains or other practical methods should be used.
We recommend using a footing system as per the attached plans and details on the prepared
construction pad.
Where site drainage and landscaping does not conform to the specifications of AS 2870-1996 and CSIRO
information Service Sheet BTF 18 (2003) significant damage to the building can be expected. A single
copy of this document is issued with the original issue of this report. Please consult your builder or
contact this office to obtain a copy.
6.0 FOOTING AND SLAB SPECIFICATIONS:
Footing Details: .
Alt footings must be founded a minimum of 300mm into MEDIUM DENSE SAND (shaded on the attached
log sections). Dimensions and reinforcement requirements are detailed in the following footing plan and
cross-sections.
Where the founding tevel is deep or is covered by the introduction of fill the footings are to be increased in
depth to reach the level. Alternatively the footings can be supported on backhoe dug or drilled piers
founded at or below the founding level. Refer to this office for details.
Drilled Piers Supporting the Footings: ,
Where the MEDIUM DENSE SAND is deep or to be covered by fill the footings can be supported on
350mm diameter drilted piers founded at a minimum of 300mm into the MEDIUM DENSE SAND.
Aiternatively the footings can be founded on steel screw piers. The piers are to be designed and installed
by a specialist contractor to achieve the loads nominated on the structural plans.
Drilled Piers Supporting the Slab:
. Slab piers are required where there is more than 300mm of uncontrolled fill beneath the slab. They are to
be founded at a minimum of 300mm into the MEDIUM DENSE SAND. Special attention must be paid to
the extra thickening and reinforcement required over each pier as detailed in the attached plan and
details. ;
Where drilled piers supporting columns or posts are not poured with the slab they must be connected to
the slab in the following manner:
« 4x N12 bars must be anchored 500mm into the drilled pier and be bent 300mm horizontally into the
footing or slab as required.
¢ Where a column penetrates a beam or footing 3x N12 bars must be bent around the column to lap the
trench mesh by 500mm both sides.
SCG CONSULTING ENGINEERS 3 SCG Ref: 16078(S)Section 6
Driited Pier Reinforcement:
Pier Depth mm Slab Piers
up to 1500
1500-2500 2xN12bars
2500-4000 4xN12bars 2xN12bars
4000-6000 6xN12 bars 4xN12bars
Floor Slab Details:
. We recommend reinforcing the floor slab as shown with SL82 slab fabric and the thickenings as
specified.
Where the foundation level of these thickenings is below prepared pad level, it may be advantageous to
excavate them at the same time as the perimeter footing.
Where the beams intersect the perimeter footing, their base must be graded down to the footing base
level, 3 x N12 bars must be cogged into the footing, and lapped 500 with the beams trench mesh. Refer
to the attached details.
A levelling layer under the floor slab is to comprise of granular material compacted in 150mm layers.
Either well graded sand or crusher dust can be used.
An approved polyethylene damp proof membrane of 0.2mm (min.) thickness is to be placed over the
levelling layer. Laps are to be a minimum of 200mm and be taped. All service penetrations and punctures
are to be fully taped. The membrane is to be extended down the inside face of the perimeter footings.
Where rock is encountered within the slab area and encroaches within the slab depth it should be
excavated to a level which enables placement of a 100mm (min.) layer of granular material under the
slab.
Notes:
All building dimensions are to be obtained from the approved pians. The builder must ensure that the final
pier placement meets all the requirements of this report (both written specifications and cross-sections).
All excavations must be totally free of all loose material and debris before pouring. They must be cleaned
out so that the concrete is poured onto undisturbed ground. Tamping and/or watering loose material is
not acceptable.
We strongly recommend footing excavations be inspected by a qualified person with appropriate
experience to confirm the founding material and level is as nominated herein.
Similarly all preparations should be inspected prior to the pouring of concrete by a qualified
person with appropriate experience to confirm that the workmanship and construction conforms
with the details and recommendations contained herein.
Tiled Areas:
In areas where ceramic floor tiles or brittle coverings alike are required we recommend increasing the
size of the slab mesh by one grade. Use flexible adhesives when affixing tiles and delay the laying for as
long as possible (at least 3 months, preferably 6 months) after the slab is poured.
$CG CONSULTING ENGINEERS 4 SCG Ref: 16078(S)Section 7
Reinforcement:
Reinforcement is to comply with the following :
a) Concrete cover around the reinforcement must be 40mm to unprotected ground, 40mm to external
exposure, 30mm to the membrane in contact with the ground, and 20mm to the internal surface. The
slab fabric shall be placed towards the top of the slab within the zone defined by these limits. We
recommend 30mm top cover.
b) Slab fabric must be lapped by one full panel of fabric so that the two outermost transverse wires of one
- sheet overlap two outermost transverse wires of the sheet being lapped. Slab fabric is to be supported on
bar chairs placed at 800mm ctrs. -
¢) Trench mesh must have ail cross wires cut flush with the outer main wires. Trench mesh in slab and
edge beams must be overlapped by the width of the fabric at “T” & “L” intersections. Trench mesh must
be spliced, where necessary, by a !ap of 500mm.
d) Pre-Fabricated footing cages or reinforcing bars at “T” & “L” intersections are to have a Y12 comer
lapping bar top and bottom and lapped 500mm with adjacent bars.
e) The minimum fap length of reinforcing bar is to be 500mm or 25 bar diameters, whichever greater.
7.0 ARTICULATION REQUIREMENTS:
The specifications in this report have been specifically formulated for articulated masonry construction.
This usually results tower construction costs. All masonry walis must have full height articulation at a
maximum spacing of 8 meters. The articulation joint must separate the masonry from footing to eaves
fevel at this spacing. Masonry must be supported on each side of the joint in an approved manner to
retain its structural integrity. : ;
Where used, internal masonry walis should be articulated in accordance with the masonry manufacturers
requirements for the width and type of unit used. In no instance should the spacing exceed 4.0m and
articulation should always be provided at an abutment with an external wall.
If articulation of masonry is found to be unacceptable, the footing system will require re-designing.
in addition to joints in masonry, articulation is achieved wherever a 40mm (min) separation in masonry
from footings to eaves is achieved. For example, where timber panels are used above and / or below
doors and windows.
_ Where it is necessary to construct construction joints to meet the articulation requirements, they can be
placed in places of limited visibility. For example behind downpipes. Internal masonry walls should be
articulated where they abut the perimeter walls.
The designer of the building must also ensure that articulation is established: .
1, Adjacent to a change in floor level which exceeds 400 mm.
2. if any proposed extension abuts any existing structure, full height articulation must be established
where the new masonry joins the old.
3. Where a masonry wall transgresses from one footing type to another - e.g. from a perimeter
footing to a continuous footing.
If the building has any masonry arches we must be contacted for further advice.
Methods of articulation are well documented in “Technical Note 61” by the Cement & Concrete
Association.
$CG CONSULTING ENGINEERS 5 SCG Ref: 16078(S)Section 8
: 8.0 LIMITATIONS: |
Field Testing Limitations The soil profiles reported in our Log Section should be representative of
the soil conditions over this site. In some cases soil conditions may change dramatically over short
distances, therefore exploration programs may not locate all variations. If site excavations reveal soil
conditions that are different from those shown in the attached log sections we must be immediately
notified. Changes to the site classification and/or footing design may be necessary.
Previous Excavations The recommendations contained in this report have not taken into consideration
the long term effects of any previous, current or potential subsurface excavation mining or potential slope
instability problems. {f a slope stability assessment is required for this allotment we can arrange for this to
be done, but that type of report is beyond the scope of our commission and fees in this report.
Client Supplied Information In writing this report we have considered all the information supplied to us
by the client. Should the client or his agent have omitted to supply us with relevant information our report
may be irrelevant and / or inappropriate. We do not take responsibility for the consequences in such
cases and we will make an additional charge if as a result, more testing or re-writing of the report is
necessaly.
General Recommendations for Builders/Owners: :
Underground Services —__ Where structures are built over uncontrolled fill, services will need to be
supported so that settlement of this fill does not cause them damage or cause incorrect alignment.
‘Plumbing Arrange plumbing fixtures so that the slab and beam penetrations are kept to a minimum
and where necessary sleeved to allow for movement with 40mm thick closed cell polythene or similar
material. Where the penetration is within 150mm of the base of a beam or footing, the depth of this
footing element should be deepened by approximately twice the diameter of the penetration. All plumbing
and drainage must comply with the requirements of the Nationa! Plumbing and Drainage Cade.
Drainage The ground surrounding the building site must be graded and drained so that water is
shed away from the house area in all directions. Particular attention should be given to ail drainage and
plumbing trenches so that they do not introduce water to the foundation soil, and destabilise the footings.
Correct drainage is an essential part of our recommendations and design. If the site is not prepared
correctly, excessive soit moisture may accumulate in some areas, which may lead to wall and/or floor
movements. Roof water should be diverted away for the building as soon as the roof is installed. Where
building delays occur, temporary downpipes may be necessary.
Bracing for Wind Forces Untess noted, we do not detail slab thickenings or pad footings to
. conform to wind bracing. Where a bracing wall is to be bolted to a slab, 40mm bottom concrete cover
attained for a radius of 150mm is required around the bolts unless noted by other consultants.
inspections:
We require 24 hours notice if you require engineers site inspections. Inspections can be booked between
8.30am and 4.30pm Monday to Friday by telephoning 07 5447 5544.
Site Classification: The site classification is calculated in accordance with the “AS2870-1996 Residential
slabs and footings-Construction” and relates to the estimation of Ys, “The characteristic surface
movement” within reactive soil profiles. The limits used for this classification are as follows;
Predicted Surface Movement
(Ys=<s2omm SSs*~—C~d SS SSSigt
PYs=>20-40mm TM Moderate
r¥s=>40-7omm SSC TH CHigh
Problem sites P Problem
$CG CONSULTING ENGINEERS 6 SCG Ref: 16078(S)Section 9
a ‘Foundation Maintenance and Owners Responsibilities
Trees and dense shrubs must be kept well away from the building. In alt types of soil conditions, if an
automatic watering system irrigates within 2.5 meters of a footing, instability problems may occur. Water
should not be allowed to pond on the ground near the building.
Definitions:
Controlled Fill - Man placed soil which has sufficient bearing to support a structure according to AS
2870-1996. Fill certified at Level 1 according to AS 3798 is controiled fill. ..
; Partially Controlled - Man placed soil which appears to have been compacted under controlled
conditions, but as the time of preparing this report, no compaction certificate suitable for compliance to
-Level 1 of AS 3798-1996 had been presented. CO
‘Uncontrolled Fill — Man placed soil (overlying the natural soils) which is not adequate to support a
‘normally loaded footing or floor slab.
oO ‘Unexcavatable Rock — Strong material including shaley material and strongly cemented sand or gravel
that does not soften in water or collapse under the combination of loading and wetting. Material that
. cannot readily be excavated by a backhoe may be taken to be rock.
Excavatable Rock — A rock-like material which does not shrink or sweil with changes in soil moisture, but
is readily excavatable with a conventional backhoe. . -
Load Bearing Wall - in our design work a load bearing wall is defined as any wall imposing on the
. footing a service load greater than 10kN/m. A load bearing wall will normally be supported by a slab
, thickening or footing in our slab designs.
Natural (Strata) — Refers to soil that is neither fill or imported material but one that is in its original
undisturbed state and position. ot
Gravel - Coarse soil particles, larger than sand size, but less than 60mm in diameter.
. Cobbles - Rocks greater than 60mm in diameter but less than 600mm in diameter. .
Boulders — Rocks larger than 600mm in diameter.
te ‘NOTE : The information contained herein has been compiled following our field and laboratory
testing, accepted engineering theory and discussions with, and information supplied by our
client, whom is noted at the head of this report. We offer no warranty for the use of this report by
other parties without prior written consent from this office.
. forandonbehalf
- _ $CG CONSULTING ENGINEERS
SCG CONSULTING ENGINEERS . 7 SCG Ref: 16078(S) ;Section 10
ag, me .
SCG CONSULTING ENGINEERS LOG SECTIONS Ref No.16078
Depth TEST SITE No 1 P | Depth TEST SITE No 2 P
Silty Sand SM [4] 100 | Silty Sand SM | 1 |
Fine Grained ,PaleGrey [1 | 200 | FineGrained,PaleGrey [1 |
Roots , Moist , Loose. | 1 [ 300 | Roots , Moist , Loose.
| 400 _|
| 500_| [1 | 500_|
Silty Sand SM Silty Sand SM
Fine Grained ,PaleGrey [1 | 800 | Fine Grained , Pale Grey
900 | (White), Moist, Loose. [1 | 900 | (White) , Moist , Loose.
1000 1000 rt]
4100 1100 rt |
1200 , 1200
1300 1300
1400 | + | 1400 |
| 1500 | Becoming Med Dense {1 | 1500 Becoming Med Dense
| 41600 | End Hand Auger | 1 | 1600 End Hand Auger | 2 |
4700 | 2 | 1700 zn
1800 | 2 | 1800 3
| 1900 _| | 2 | 1900
| 2000 | 3 | 2000 _| | 4 |
| 2100 | | 3 | 2100 | | 4 |
2200 2200 5 |
| 2300 _| | 4 | 2300 | |S
2400 | 5} 2400 |
| 2500 | | 7 | 2500 _|
2600 | 7 | 2600_|
2700 2700
2800 2800
| 2900 | | 7 | 2900 |
| 3000 | [7 | 3000_|
3100 | | 3100 | |
SPEATREPEIE STORER SR EE REOE RSI RE CIEE OS SEUSS See REIS bet teeo tment tater nae een tne Sate eee eked pea iettreser poset Brae
Depth = mm below ground level. iN
P = blows per 100mm penetration with an approved 9kg penetrometer. 5:
Notation such as (SP) refers to the soil description to Table A1 AS1726 ‘Guide to the description i
identification and classification of soils’. f
Solid lines represent sharp interface between different soil types. Dotted lines represent i
gradation form one soil type to another. 3
Abbreviations used i
UTP - unable to penetrate, Bec. ~ becoming, N.S.L. — Natural Surface Level E
Med. — medium, MW - Moderately weathered ti
EW - extremely weathered, Plast. - Plasticity :
. No recovery means unable to extract samples from the base of the bore hole because the soil Bs
will not bind in the auger head. i
The colour of the soil is often abbreviated, for example Gy = grey Or = orange. z
. (Ls=?.?%) Indicates sample location and Linear Shrinkage result. :
The footings must be dug into or supported on piers dug into the shaded material. &
$CG CONSULTING ENGINEERS 8 SCG Ref: 16078(S)Section 11
wid, . age , fRevson [Oesetpion |
"som "en fT OCC
3 i pf
1 —_—— — — —_—_ 7 ; .
§ |
|
| | |
2 | BH 2
BE ee:
| e
co ~—__---lt-—-, .
k l
| -_-— |
| {
] | .
iy po dil .
| | | |
| | | .
| - J : L = | 3 ;
| | 8 ‘
e| |ige® wyal}] -
a) |1°3e Seei]) |. |
8 33
*| | | |
rm L— , ca “|
l |
| ee
\ | |
| |
PMO
9
, 9 .
3 5 of 2 4
SITE PLAN :
WEYBA STREET .
(Property Boundaries are diagramatic only)
DeSUILD 17A
vegetation | Grosses CONSULTING ENGINEERS (G39
* Grasses _| SCG sirwetural - elsil - geotechnical
Vegetation + . Ea
BH2 ABN 40 098 481 899
@- Borehole location. 48 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634
measured as a percentage gradient from
high ground to low ground. Project 8 Weyba at ch
3 unshine Bea
DO NOT DIMENSION OFF THIS DIAGRAM. = # pate: March 2006 rg No. 16078-S|
. 3 .Section 12
JA Schematic added, water tanks added 43.09.06
EXISTING STRUCTURE /OWELUING [e._ [WATER TANKS RAGED —_————_—*aaarar,
PROPOSED BASEMENT SPRAYED RC FACING TO ET
ALLOTMENTS ENVELOPE. EXCAVATED FACE TO
Tj Yj THE BULDER/CONTRACTOR azar TD mt} RP BOUNDARY DETAIL. +700
Y RELEVANT LEVELS FRR TO CREATE BUNOING IN [ — ee n+ ences ceverene-----5
SHALL CONFI ALL gu Gua NN aa ED 7.718 ETE)
LZ, TEMPORARY HARDSTAND l / per ase. ae he UNIT t nner weep eros 7= 5 .
creo
ad level FOR DIVERISION INTO vis ¢ “ie ’
W ay, F J Ths FOOTNG wsTHOUT SILT FENCES. le yo Ue s ma GARAGE ', le “| \ 8
ao. ’ A Lae weeneenee— de... Yor
ly, 4 7
THS FOOTING {S FOUNDED ABOVE CRITICAL DEPTH s A FFL 49.850
BELOW CRITICAL DEPTH UME AND IS UNSTABLE us Wi Ks Faq Tm V“ Agecrapapr crass
coe 7 ¢
UNE AND [S STABLE. a a “os 7 ’ s , e r / ’ coos Fr
GY ia / ¢ / ’ ¢ ’ ,
/ / 7 s ’
| ? EXISTING HOUSE TO BE nt THE COMPRACTON 15 70 STALL APPROMED SAT CTENBON FEACES:
PIERS OR UNDERPINNING Fi UNE OF PROP 20-40mm AGGREGATE ! o c sy 4 rennet s SPMES AND PROOR TD COMMEMUNG ANY EAIHODNKS. THE FENCE 5 7 BC
| EXCAVATION EXCAVATION HARD STAND OVERLAY “os // .DEMOUSHED ¢ 900(#) GEO-FABRIC SRT CONSTRUCTED MONG THE LOWEST BOUNDARY AND
8 a FOED QQUNEARES TD DEURE Fu STOMEER ENTRAPEDW'
BELOW THE CRITICAL DEPTH UNE OR NCH, FOR DEUIVERY'S DURING Z Porro ary Coe Cos eprtas a BURED 300 INTO STABLE ~ PUNT FRC RTO PE ALLOTMENT MAS) CAO TORIES THE
S€ MEDED TO T CONSTRUCTION. te Vy cous FENCE AnD SHALL NOT ENTER MEGHECUEIES
@NY FOOTING THAT IS FOUNDED foe Ir at WHE Se OF SUE BUNS DP COUR PROTECTED RSG. THE
ABOVE THE CRITICAL DEPTH LINE st A= ne boy way oy Words , os Yq FENCE MUST ROWAN DY PLACE (AM. SUCH TE THAT AORSHED
MO 4, or4 fos f= meg HOSLAPG Sl) ORAWAGL MEASURES ANE SESTALLED
bv os
“oe coe fi ly Pete
TH DETAL AL50 APPUES 70 EXISTING FOUNDATIONS. Ie aL A wire a “ vt CnC nee ee ene we 1 =n
LT NV ?
PROPERTIES. PRUNG MUST BUMDER TO MAINTAIN STABILITY 1s f ’ 4
BE INSTALLED HERE DUSTING FOOTINGS MLL BE OF ALL NEIGHBOURING STRUCTURES, SS Bok in Kerb & 1 7} GARAGE pect diet ie attic to EI mer
rounoeD ABOVE ANY EXCAVATION CRITICAL DEPTH REFER CRITICAL DEPTH LINE Weare May z| Vv eo FFL 49,850 | 1 $200{L) 50 Sq. HOWE SPRES, ee
RL 51-61 1)’ tan wee iene --- nnn ne eee eee anne Ve mH
FOR GUIDANCE. ALLOW FOR SPRAYED 148 sue &! fw c-— | -+- wneud yh — Ye
Te FACING TO EXPOSED CUT =a wee nao - =a ene
BATTERS 10 PROTECT AGAINST SCOUR. See Bcuae nie 22909 ee nm Ws
SL72 WESH Ml OG
ee ee a ee ee see
w7.719
RP BOUNDARY
SPRAYED RC FACING TO
EXCAVATED FACE TO
Wet tooled 125 Thick DETAH. TYPICAL SECTION ~ SILT FENCE
\ driveway slab. SITE_PLAN Scale 1; 200
contro} joint. sim nn
Seale 1: 200
meu
Cut every 2nd SL72 mesh FIMSHED SITE DRAINAGE IN 1.5x4.5x1,0m{D)
ACCORDANCE WITH HYDRAULICS
wire along {ine middie DOCUMENTATION, BLOCK RETAINING WALL STORMWATER SOAKAGE PIT
of joint. up Sand TO DETAIL.
“2-0 RP BOUNDARY 4700
37.79 a7
1 ORFLOR ann nnnn enna nee-- ee eed wanna nanan ree eee
| | (wm) | LDS) S UNIT 4 wenn eee nen n naan nn a | g 1 $182 Mesh
ee IJ ee GARAGE henna nena eee. i zp middle
FFL 49.850
8 he
\° (65) gal | wo ee
=>---_-
at. Tithe 2
(05) DRIVEWAY } 1s.) GRATED ROOF DRANAGE 70 BE PIPED a: ef Reus
TO THE ROAD RESERVE VIA
‘Ground Level Ie fe i a FalLy UW WATER TANKS & APPROVED 4) SOomm
ESS | | nn KERB ADAPTORS. Sow cut and Compacted
=| | <= SPRAYED 25MPa TW alt RARSIER, SEMI-HOUNTABLE, MOUNTABLE sond bed
[Pane Td Files cee breakout
iif
| li IN ld awl pase en awe ce nese nee e--————— _ back of kerb KER® & CHANNEL OR INVERT CROSSING
{=I El CONCRETE FACING
pay c a or UNIT 2 CROSSOVER DETAIL
|| | x SL72 MESH MIDDLE te. GARAGE
I x mj wee FFL 49.850
Manan nnn eee eed
SATURATE GROUND AQUACENT = eat Exaaed Level 26 sus ‘my ORMFLOF (Scale 1:20)
EXCAVATION FOR A MINIMUM OF I= mecccenacnnsesencanena=q pean ynn-n---- n= wee en --nnd a
24 HOURS PRIOR TO WORKS Sil DRIVEWAY CROSS OVER DETAILS RP BOUNDARY — Fis
COMMENCING. =| LD LEE} 70 BE IN ACCORDANCE WITH (W1} ACTION TANKS SPLITMASTER oe ee ee eee GENERAL:
| —— =| f= NOOSA SHIRE COUNCIL'S STD 1,5x1.5x1.Om(D
l TT DRAWINGS 9005 & 9019. SOL TANKS FOR EACH UNIT. STORMWATER SOAKAGE PIT 4, Do nol scale from this drawing.
SUPPLY VIA ROOF DRAINAGE, TO DETAIL.
OVERFLOW 10 KERB & CHAWNEL. 2. All dimensions in millimetres
Ly HON ™~ Con EL) CONCRE T +41 AMEN na um PLUMB FOR RE-USE IN WC's AND 3. Setting out dimensions are to be obtained from the orchitectural
LT ty
ne esi EXTERNAL APPLICATIONS. SITE PLAN — DRIVEWAY AND DRAINAGE DETAILS drawings.
4. Any discrepancies between these drowing and the architectural drawings
Scole 1: 200 are to be referred to the engineer immediately.
5. The builder is responsible for locating all existing services within ond
adjacent the diatment and shall ensure thot afl new works ore in
accordance with the attached critical depth line diagram.
FOOTPATHS AND DRIVEWAYS:
1. Existing footpaths to be saw cut prior to removal
2. Crossings ore not designed for commercial vehicles
3. Concrete driveway to be 125mm thk. excluding ony finished treatments,
LEGEND wo eg. stamping
ao 4. Concrete surfoce toleronce +5.0mm over 3.0m
ao a> a
~ wo 5. Concrete N25 in accordance with AS 1379 and AS 3600
Indicates existing surface contour Surface | 4 6. Reinforcement fabric to AS 1304, ploced central slob depth.
49,007 and level to AHD. pe Capped Concrete encased 7. Expansion joints to be 10mm wide wet tooled with every 2nd mesh wire
906 backflush point cul along pint.
8. One access point permitted for each allotment.
Indicates proposed finished spot iii 9. For curved driveways, maximum grades apply to inside edge of curve
surface levels to AHD. Aull 10. All services to be lacoted and protected os required prior to work
YY, LLM Slotted horizontal commencing
x 12.78 Existing surface spot levels. 10 99 laterals
pipes equally spaced
Issue:
wl Denotes wet tooled joint to aS ISSUE FOR CONST.
TT |
driveway slab, refer to details. Flow CEBUILD TA CONSULTING ENGINEERS
125 Thk. Driveway slob on compacted Slatled Agg pipe ey SCG structural - civil - geotechnical
150 min clearance
material, SL72 mesh, top 40 cover, to base. As per plan 20mm clean TYPICAL SECTION « A — cr | ago |" aw GARAGE ABN 40 098 481 899
200(1#) x 200(D) edge thickening at aggregate fully DETALS FFL 49.85 18 DUKE STREET SUNSHINE BEACH QLD.4567
un—supported edges, Flexible joint against encased in
brickwork. geofabric, Refer Driveway Ph (07) 5447 5544 Fax (07) 5447 2634
Crossover Detail Above
— Ensure the inflow into the pit is protected with
FALL. y Indicates direction of fall STORMWATER SOAKER PIT DETAIL an approved leaf and sit quord Groted
to finished driveway surfoce. ~ The pit MUST be sropped in geofobric cloth os drain
ecified
—_— —si— — Indicates position of approved silt = The pit should be backflushed on a regular basis DRIVEWAY CENTRE PROFILE
(3 months) to remove any sills or similiar
thateriols,
retension fence. — The pit should only be used for the disposal of (V&H 1: 200)
stormwater,
/Used in these records
0015CE08.001.pdfRelated documentPublic source context ↗
06/1101 - Application for Op Works 18 Weyba St [As Published]Related documentApplication case desk ↗
About this file
- File size
- 702 KB (small file)
- File type
No other editions are linked here.