1003JS.na NC IR response · REC15/0011

Attached to the e-mail REC15/0011 - Information Response.

of 4

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Sunshine Coast Office

| Innovation Parkway, Birtinya, PO Box 149,Wurtulla QLD Australia 4575

T +61 75436 7888 F +61 7 5493 6630 E [email protected] W rpsgroup.com.au
Our Ref: PR122205-3:1003JS.na
Council Ref: REC15/0011
Date: 12" October 2015

Attn: Jack Lewis

Noosa Shire Council
PO Box 141
TEWANTIN, QLD 4565

Via Email ([email protected]) and Mail

Dear Jack

RE: INFORMATION REQUEST RESPONSE PURSUANT TO SECTION 278 OF THE
SUSTAINABLE PLANNING ACT 2009
1 GEORGE STREET, TEWANTIN - LOT 1 RP220516

We act on behalf of Sunshine Beach Constructions, regarding the abovementioned Development
Application. This Development Application seeks approval for the following aspects of
development:

= Development Permit for a Reconfiguration of a Lot (1 into 11 lots plus a balance lot)

On 9 July 2015 an Information Request was received from Noosa Shire Council and we
understand that Tod Engineers & Project Managers’ Doug Reynolds has since been liaising with
Council officers regarding the issues raised. Pursuant to Section 278 of the Sustainable
Planning Act 2009, we provide our response to this information request below.

INFORMATION REQUEST RESPONSE
Access Driveways

Council has concerns with the potential impact of vehicle access driveways on the existing
significant trees within the George Street road reserve and recommend the following trees be
retained:

1 x Large Blackbutt Eucalypt species in front of proposed lot 1
Group of Melaleuca species in front of proposed lot 7

2 x Bloodwood species in front of proposed lots 10 and 11

2 x Blackbutt Eucalypt species in front of proposed lot 11

Information Required

4 Please provide a detailed driveway layout plan indicating the retention of the
abovementioned trees. In this regard, please amend the driveway locations for proposed
lots 1,7,10 & 11 to be clear of the existing trees and their associated root zones.

Response:
The enclosed TOD Layout Plan, Sheet 15513-SKO1 Revision E, shows the proposed driveway

locations, which have been arrived at after considering a number of alternatives. The plan also
highlights the five (5) significant trees that will need to be removed in order to accommodate
kerbing and channelling of George Street, the construction of the driveways and the provision of
services to the new lots.
e The large Blackbutt tree identified in the first dot point will need to be removed due to its
extensive root zone coverage, which would otherwise be heavily impacted upon by
driveway works and services, as well as it being a potential hazard due to falling limbs;

England | Wales | Scotland | Northern Ireland | Ireland | Netherlands | USA | Australia

RPS Australia East Pty Ltd ABN 44 140 292 762 A member of the RPS Group Plc
Full text of the other 3 pages

Page 2

Sunshine Coast Office
| Innovation Parkway, Birtinya, PO Box 149,Wurtulla QLD Australia 4575
T +61 7 5436 7888 F +6! 75493 6630 E [email protected] W rpsgroup.com.au

e It has apparently been acknowledged by Council that the group of Melaleucas identified
in the second dot point will be disturbed by the required kerb and channel works;

e We believe that only one of the two Bloodwood trees identified in the third dot point —
that in front of Lot 11 — will need to be removed;

e The two Blackbutt trees identified in the fourth dot point should be able to be retained;

e Unfortunately, one other large tree — a Blackbutt in front of Lot 5 — will need to be
removed, due to its unavoidable disturbance by the required kerb and channel works.

2. Provide an assessment of the likely works on the health and structural integrity of trees
within the road reserve.

(a) This assessment is to include a situational report on the current health of the trees to
be retained and estimate useful life expectancy in their current state.

(b) The assessment must include recommendations for works within the tree tunnel
boring to protect root zones.

(c) The assessment must coordinate the requirements of the other disciplines and may
include the re-positioning of driveways, non0O-standard alignment of services and
other methods to reduce and/or eliminate works within the tree protection zones.

Response:
The trees proposed to be removed due to their conflict with construction works have been

identified above. It is anticipated that all of the other tress within the road reserve — those
intended to be retained - will be assessed by an arborist once detailed operational works plans
have been completed, following approval of the application (REC15/0011) for reconfiguration.

3 Please remove from the plans the 3m wide gravel access along the western perimeter of
proposed lots 9 & 11, and the specific access driveway within the road reserve for direct
access to the bioretention basin.

Response:
This has been attended to — refer to the enclosed, amended proposal plans prepared by TOD

and RPS.
Frontage Works

There are concerns the construction of the proposed open drain and access pipes (300mm)
along the front boundaries would likely cause damage to the roots of the existing trees with the
road reserve warranting retention.

Information Required

4. Amend the plans to include a kerb edge for the full length of the frontages of the site as
follows:

(a) Provide kerb and layback for the driveways by replacing the existing flush kerb or
constructing it along and adjoining the existing kerb.

(b) Provide grassed verge between the internal top of kerb and the edge of the existing
concrete footpath generally at 1:4 batter.

(c) Provide stormwater collection pits at both ends of the kerb line and direct flows to
the proposed bio-retention basin or treatment train.

Response:
The above items are reflected in schematic terms on the enclosed, amended Layout Plan, Sheet

15513-SK01 Revision E prepared by TOD.

England | Wales | Scotland | Northern Ireland | Ireland | Netherlands | USA | Australia

RPS Australia East Pty Ltd ABN 44 140 292 762 A member of the RPS Group Plc

Page 3

Sunshine Coast Office
| Innovation Parkway, Birtinya, PO Box 149,Wurtulla QLD Australia 4575
T +61 75436 7888 F +61 75493 6630 E [email protected] W rpsgroup.com.au

Services Alignment

There are concerns regarding the alignment and depth of the trenches for the proposed sewer
main and their impact on existing trees.

It is acknowledged the assessment and approval for the design and the construction of the sewer
main is the responsibility of Unitywater. However, given the depth of the proposed sewer main,
Council seeks to ensure the impact on existing mature trees is prevented or minimised.

Information Required

5. Provide a preliminary design for the proposed sewer main that include:

(a) Alignment and depth of the sewer main.

(b) Existing trees that may be affected by the works and measures to protect them.

(c) The sections of the line that will be tunnel-bored to protect existing trees and

services.

Response:
Refer to the enclosed, amended Layout Plan, Sheet 15513-SKO1 Revision E prepared by TOD;
the alignment has been chosen to have minimal impact on existing trees, as is evidenced by the
preliminary layout depicted on Sheet 3 of the plan. The depth of the sewer can be established
from the designed lid and invert levels shown on the plan. Also, there appear to be no significant
trees likely to be impacted by the proposed route of the sewer after it leaves the site and heads
east along George Street, before crossing the road (by tunnel bore) between two large trees
(which are yet to be precisely located) to an existing manhole. There would seem to be sufficient
grade and space along George Street to ensure that the indicative layout depicted will very
closely approximate the final design, subject to detailed survey to be undertaken as part of the
operational works design and approval process.

6. Provide details on how methods will be engaged to ensure third party service providers
and inexperienced operators do not impact on trees designated for retention.

Response:

It is anticipated that a report addressing this matter will be prepared once a detailed survey has
been undertaken and operational works plans have been completed, following approval of the
application (REC15/0011) for reconfiguration.

SUPPORTING INFORMATION
The following supporting information is attached in support of this response:

«TOD Layout Plan, Sheet 15513-SK01 Revision E;
= TOD Commentary, Ref J/N 15513 Rev C;
= RPS Proposed Reconfiguration of a lot Plan, Referenced 122205-11

In accordance with Section 378(1)(a) of the Sustainable Planning Act 2009, this letter and
attachments constitute a response to all of the information requested. We ask that the
Requesting Authority, Noosa Shire Council, proceed with assessment of this development
application. We also advise that our formal response to the Information Request issued by the
Department of State Development, Infrastructure and Planning has been submitted and a copy
of this is enclosed for Council’s information and records. Trusting this information is sufficient for
your purposes, please contact me directly if you require any further details or clarification.

England | Wales | Scotland | Northern Ireland | Ireland | Netherlands | USA | Australia

RPS Australia East Pty Ltd ABN 44 140 292 762 A member of the RPS Group Plc

Page 4

RPS

Sunshine Coast Office
| Innovation Parkway, Birtinya, PO Box 149,Wurtulla QLD Australia 4575
T +61 75436 7888 F +61 7 5493 6630 E [email protected] W rpsgroup.com.au

Yours faithfully
RPS

Jeremy Scriven
Principal Survey

cc Sunshine Beach Constructions

England | Wales | Scotland | Northern Ireland | Ireland | Netherlands | USA | Australia

RPS Australia East Pty Ltd ABN 44 140 292 762 A member of the RPS Group Plc

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

1003JS.na NC IR response.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.