Council archive · source document
1003JS.na NC IR response · REC15/0011
Attached to the e-mail REC15/0011 - Information Response.
Sunshine Coast Office | Innovation Parkway, Birtinya, PO Box 149,Wurtulla QLD Australia 4575 T +61 75436 7888 F +61 75493 6630 E [email protected] W rpsgroup.com.au Services Alignment There are concerns regarding the alignment and depth of the trenches for the proposed sewer main and their impact on existing trees. It is acknowledged the assessment and approval for the design and the construction of the sewer main is the responsibility of Unitywater. However, given the depth of the proposed sewer main, Council seeks to ensure the impact on existing mature trees is prevented or minimised. Information Required 5. Provide a preliminary design for the proposed sewer main that include: (a) Alignment and depth of the sewer main. (b) Existing trees that may be affected by the works and measures to protect them. (c) The sections of the line that will be tunnel-bored to protect existing trees and services. Response: Refer to the enclosed, amended Layout Plan, Sheet 15513-SKO1 Revision E prepared by TOD; the alignment has been chosen to have minimal impact on existing trees, as is evidenced by the preliminary layout depicted on Sheet 3 of the plan. The depth of the sewer can be established from the designed lid and invert levels shown on the plan. Also, there appear to be no significant trees likely to be impacted by the proposed route of the sewer after it leaves the site and heads east along George Street, before crossing the road (by tunnel bore) between two large trees (which are yet to be precisely located) to an existing manhole. There would seem to be sufficient grade and space along George Street to ensure that the indicative layout depicted will very closely approximate the final design, subject to detailed survey to be undertaken as part of the operational works design and approval process. 6. Provide details on how methods will be engaged to ensure third party service providers and inexperienced operators do not impact on trees designated for retention. Response: It is anticipated that a report addressing this matter will be prepared once a detailed survey has been undertaken and operational works plans have been completed, following approval of the application (REC15/0011) for reconfiguration. SUPPORTING INFORMATION The following supporting information is attached in support of this response: «TOD Layout Plan, Sheet 15513-SK01 Revision E; = TOD Commentary, Ref J/N 15513 Rev C; = RPS Proposed Reconfiguration of a lot Plan, Referenced 122205-11 In accordance with Section 378(1)(a) of the Sustainable Planning Act 2009, this letter and attachments constitute a response to all of the information requested. We ask that the Requesting Authority, Noosa Shire Council, proceed with assessment of this development application. We also advise that our formal response to the Information Request issued by the Department of State Development, Infrastructure and Planning has been submitted and a copy of this is enclosed for Council’s information and records. Trusting this information is sufficient for your purposes, please contact me directly if you require any further details or clarification. England | Wales | Scotland | Northern Ireland | Ireland | Netherlands | USA | Australia RPS Australia East Pty Ltd ABN 44 140 292 762 A member of the RPS Group Plc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1003JS.na NC IR response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.