                       MINUTES


         General Committee
              Meeting


                Monday, 18 July 2022

                                10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2022-07-18 General Committee Meeting Minutes(PDF, 506KB).pdf · 518 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 12 sections

Section 2

GENERAL COMMITTEE MEETING MINUTES                                        18 JULY 2022



1.   ATTENDANCE & APOLOGIES

     Cr Frank Wilkie (Chair)
     Cr Karen Finzel
     Cr Joe Jurisevic
     Cr Amelia Lorentson
     Cr Clare Stewart
     Cr Brian Stockwell
     Cr Tom Wegener

     EXECUTIVE
     S Waters, Chief Executive Officer
     K Rawlings, Director Environment and Sustainable Development
     L Jensen Acting Director Environment and Sustainable Development

     APOLOGIES
     Nil.


     The meeting commenced at 10.00am.




2.   CONFIRMATION OF MINUTES
     Committee Resolution
     Moved:           Cr Stewart
     Seconded:        Cr Wegener
     The Minutes of the General Committee Meeting held on 13 June 2022 be received and
     confirmed.
                                                                  Carried unanimously.




3.   PRESENTATIONS

     Nil.




4.   DEPUTATIONS

     Nil.




                                                                          Page 2 of 13

Section 3

GENERAL COMMITTEE MEETING MINUTES                                                                18 JULY 2022


5.   ITEMS REFERRED FROM COMMITTEES


1    MCU21/0228 & OPW21/0364 – CHANGE REPRESENTATIONS TO A DEVELOPMENT
     APPROVAL FOR MULTIPLE DWELLING AND OFFICE, AND ROADWORK, DRAINAGE
     WORK, LANDSCAPING, STORMWATER, EARTHWORKS - 245 DAVID LOW WAY
     PEREGIAN BEACH QLD 4573
     In accordance with Chapter 5B of the Local Government Act 2009, Cr Stewart provided the following
     declaration to the meeting of a declarable conflict of interest in this matter:
     I, Cr Stewart, inform the meeting that I have a declarable conflict of interest in this matter in relation to
     the application by Altum Properties Group. I have a friendship with Leigh and Rob McCready, who are
     associated with the applicant. As a result, of my conflict of interest I will now leave the meeting room
     while the matter is considered and voted on.
     Cr Stewart left the meeting.
     In accordance with Chapter 5B of the Local Government Act 2009, Cr Finzel provided the following
     declaration to the meeting of a declarable conflict of interest in this matter:
     I, Cr Finzel, inform the meeting that I have a declarable conflict of interest in this matter in relation to
     the application by Altum Properties Group. I have known Leigh McCready, who is associated with the
     applicant, in a volunteer capacity and who was involved with my 2020 election campaign with Future
     Noosa, which is no longer an entity. As a result of my conflict of interest I will now leave the meeting
     room while the matter is considered and voted on.
     Cr Finzel left the meeting.
     In accordance with Chapter 5B of the Local Government Act 2009, Cr Stockwell provided the following
     declaration to the meeting of a declarable conflict of interest in this matter:
     I, Cr Stockwell, inform the meeting that I have a declarable conflict of interest in this matter in relation
     to the application by Altum Properties Group. On 24 February 2020 I sought a review by the
     Independent Council Election Observer (ICEO) as to the public claims of the Future Noosa Team, of
     which Leigh McCready was publicly identified as a Campaign Manager. Leigh McCready is associated
     with the applicant. Although I have a declarable conflict of interest, I do not believe a reasonable
     person could have a perception of bias. Therefore, I will choose to remain in the meeting room.
     However, I will respect the decision of the meeting on whether I can remain and participate in the
     decision.
     Committee Resolution
     Moved:             Cr Jurisevic
     Seconded:          Cr Wegener
     That Council note the declarable conflict of interest by Cr Stockwell and determine that it is in the
     public interest that Cr Stockwell participates and votes on this matter because Council believes that a
     reasonable person could not have a perception of bias because the ICEO review was advisory service,
     not a statutory process, and Cr Stockwell’s queries at that time were in the public interest and neither
     he nor Ms McCready stood to personally gain or lose from that advice and therefore a reasonable
     person would trust that the final decision is made in the public interest.
                                                                                    Carried unanimously.
     Cr Stockwell did not vote on the above motion.
     Committee Recommendation
     Moved:              Cr Jurisevic
     Seconded:           Cr Wegener
     That Council note the report by the Development Planner to the Planning & Environment
     Committee Meeting dated 12 July 2022, regarding representations made in relation to
     Application No. MCU21/0228 & OPW21/0364 for a Development Permit for a Material
     Change of Use - Multiple dwelling, Office, and Operational Works (Roadwork, Drainage
     Work, Landscaping, Stormwater, Earthworks), situated at 245 David Low Way Peregian
     Beach, described as Lot 22 P9315, and:

                                                                                                  Page 3 of 13

Section 4

GENERAL COMMITTEE MEETING MINUTES                                                  18 JULY 2022


    A.   Approve to amend conditions 1, 2.2, 5, 15, 16, 24, 46, 56, 79 of the Preliminary
         Approval, to read as follows:
         PLANNING
         When Conditions must be Complied With
         1.    Development undertaken in accordance with this approval must generally comply
               with the approved plans of development. The approved plans are numbered
               1622-DA02 to DA09 prepared by Blackburn and Jackson, dated 11 February
               2022, 1622_L01_01_04 1662_L03_01_04, and 1662_L07_01_01 prepared by
               Blackburn and Jackson, dated 19 May 2022, and adopt the findings of Arborist
               Tree Assessment Report by Arboriculture Contractors Australia Pty Ltd, dated 27
               April 2022. These plans must be amended in accordance with these conditions.
         2.    Amended plans and associated reports must be submitted to Council prior to any
               further development applications being made and must include the following to
               the reasonable satisfaction of the Manager, Development Assessment:
               2.1   One of the three (3) Multiple Dwelling units is to be:
                     i.     accessible by a safe, continuous and step free path of travel from the
                            street entrance of the property or from a car parking space;
                     ii.    has a step-free entrance door with opening width of at least 820
                            millimetres; and
                     iii.   contains a bathroom on the entry level.
               2.2 The front boundary setback when measured from the outermost projection
                   of the vertical screen along the façade of Unit 1 is to be setback at least 5.4
                   metres from the front property boundary.
         Currency Period
         5.    The development approval lapses if the use has not happened by 21 July 2028,
               unless an application to extend the currency period is approved by Council.
         Fencing and Walls
         15.   Any street fencing must be set back an average of at least 1 metre from the front
               property boundary. Any fencing on the front boundary must not exceed a
               maximum height of 1.8m.
         16.   The area of land between the fence and the front property boundary must be
               densely landscaped to obscure any fencing from the street.
         Landscaping Works
         24.   The existing vegetation in the road reserve is to be retained and managed as per
               the findings and recommendations of the Arborist Report prepared by
               Arboriculture Contractors Australia Pty Ltd, dated 27 April 2022. A qualified
               person* must be present if works are occurring within the Tree Protection Zone.
               Should one of the mature trees are to be removed, reasonable grounds must be
               given by the qualified person*, and substituted with additional Baeckea virgata or
               Banksia integrifolia with a minimum pot size of 100L or greater.
         OPERATIONAL WORKS
         Approved Plans
         When conditions must be complied with
         46.   Development undertaken in accordance with this Preliminary Approval must
               generally comply with the approved plans of development. The approved plans
               are listed in the following table unless otherwise amended by these conditions,

                                                                                    Page 4 of 13

Section 5

GENERAL COMMITTEE MEETING MINUTES                                                   18 JULY 2022


              where there is conflict between the approved plans and conditions of approval,
              the condition prevails.
          Plan No.           Rev.   Plan/Document Name                                Date
          188-002-002-B      B      General Notes prepared by Bax Engineering         7 February 2022
          188- 002-100       B      Site Layout Plan prepared by Bax Engineering      7 February 2022
          188-002-200        B      Earthworks Layout Plan prepared by Bax            7 February 2022
                                    Engineering
          188-002-201        B      Earthworks Sections prepared by Bax               7 February 2022
                                    Engineering
          188-002-300        B      Grading & Drainage Layout Plan (as annotated      7 February 2022
                                    by Council) prepared by Bax Engineering
          188-002-301        B      Pavement Layout Plan prepared by Bax              7 February 2022
                                    Engineering
          188-002-302        B      Sign & Line Marking Layout Plan prepared by       7 February 2022
                                    Bax Engineering
          188-002-401        B      Drainage Longitudinal Section prepared by Bax     7 February 2022
                                    Engineering
          -                  -      Arborist Tree Assessment Report by                27 April 2022
                                    Arboriculture Contractors Australia Pty Ltd
          1622_L01-01_04     4      Landscape Notes & Schedules prepared by           19 May 2022
                                    Blackburne Jackson
          1622_L03-01_04     4      Landscape Planting Plans prepared by              19 May 2022
                                    Blackburne Jackson
          1622_L07-01_04     1      Landscape Details prepared by Blackburne          19 May 2022
                                    Jackson

        During Construction
        Engineering
        56.   All works must be constructed and work procedure undertaken in accordance
              with:
              a.     The approved plans/documents and conditions detailed in this Decision
                     Notice
              b.     All relevant Noosa Council Planning Scheme Policies, standard drawings,
                     standard specifications and guidelines
              c.     The latest version of the Healthy Waterways document “Water Sensitive
                     Urban Design Technical Design Guidelines for South East Queensland” for
                     all water quality devices to be constructed on site
        FOLLOWING CONSTRUCTION / PRIOR TO THE COMMENCEMENT OF THE USE
        As Constructed Plans and ADAC XML Files (Council)
        79.   Prior to acceptance of civil works to become Council assets “On Maintenance”,
              satisfactory “As-Constructed” records must be submitted to Council. The bundle
              of “As Constructed” information shall include:
              a.     As-Constructed Engineering Drawings. Data is to be submitted in an
                     electronic drawing file format (.dwg), with all plans clearly endorsed “As-
                     Constructed”, along with the accompanying hardcopies (PDFs of the As-
                     Constructed .dwg drawing files), and;
              b.     ADAC XML Digital File. ADAC File format (ADAC - Asset Design As
                     Constructed) prepared in accordance with industry standards and recorded

                                                                                    Page 5 of 13

Section 6

GENERAL COMMITTEE MEETING MINUTES                                                    18 JULY 2022


                       in “MGA - UTM56 / GDA94” projection.
                       Please Note: Further information and advice relating to the as-constructed
                       drawing presentation, as-constructed survey capture and associated
                       guidelines for preparation of a compliant ADAC XML digital file are
                       available on the webpage titled “As Constructed Guidelines” and
                       accessible at the Noosa Council Website: Planning & Development /
                       Development Tools & Guidelines / As-Constructed Guidelines.
                c.     The “As-Constructed” drawings will require certification by a:
                       i.    Qualified experienced Civil Engineer (RPEQ) confirming design
                             intent and conformance with applicable standards and specifications,
                             along with the relevant descriptions of assets, services and structures
                             and;
                       ii.   Licensed Surveyor in regard to the cadastral and locational
                             information, levels and applicable survey datum.
                d.     The data must be in accordance with Council’s “Planning Scheme Policy 6
                       – Engineering Design Standards”, and fully detail the levels for all
                       engineering works including but not limited to the drainage network and
                       structures, finished ground and pavement surface levels.
    B.    Delete conditions 22, 23, 25, 26, 27, 47.
    C.    Refuse to issue a Development Permit for Material Change of Use and the changes
          requested in regard to conditions 2.1 and 5 for the following reasons:
          Condition 2.1 is consistent with AO9 and PO9 of the Dual Occupancy and Multiple
          Dwelling Use Code of the Noosa Plan 2020.
          1.    The proposed development does not provide access for the section of community
                which have limited mobility, excluding the ability for persons of limited mobility to
                reside or visit any of the units.
          2.    The Planning Act 2016 allows Council as the assessment manager to condition
                the currency period for the application in a development approval and the
                condition clearly articulates when the approval lapses.
    D.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
                                                                         Carried unanimously.
    Crs Stewart and Finzel returned to the meeting.




2   MCU19/0017.02 & RAL19/0004.02 – MINOR CHANGE TO DEVELOPMENT APPROVAL
    FOR COMMERCIAL BUSINESS - TYPE 1 OFFICE, COMMERCIAL BUSINESS - TYPE 2
    MEDICAL & ANCILLARY DWELLING UNIT & RECONFIGURATION OF A LOT – ACCESS
    EASEMENT AT 36 - 40 HOFMANN DRIVE, NOOSAVILLE
    Committee Recommendation
    Moved:             Cr Wegener
    Seconded:          Cr Jurisevic
    That Council note the report by the Development Planner to the Planning & Environment
    Committee Meeting dated 12 July 2022 regarding Application No. MCU19/0017.02 &
    RAL19/0004.02 to make a minor change to an existing approval for Material Change of Use
    - Ancillary Dwelling Unit, Commercial Business - Type 1 Office, Commercial Business - Type
    2 Medical and Reconfiguration of a Lot – Access Easement situated at 36-40 Hofmann Dr
    Noosaville and:


                                                                                        Page 6 of 13

Section 7

GENERAL COMMITTEE MEETING MINUTES                                               18 JULY 2022


    A.   Refuse the request for increased height and design for the following reasons:
         1.    The increased height does not comply with Acceptable outcome AO16.1 (b) (iii)
               of the Major Centre Zone code and Performance Outcome PO16 a), b) & c) of
               the Major Centre Zone code in Noosa Plan 2020 and Probable solution S8.1 d)
               and Specific outcomes a), c) & d) the Noosaville Locality Code in Noosa Plan
               2006, as it will dominate the site, skyline and surrounding area and is not in
               keeping with the character of the area.
         2.    Changes to the width of balconies and roof overhangs and additional rendering
               to the front façade reduces the architectural appeal of the building from that
               previously approved.
    B.   Advise the applicant the following changes are considered generally in accordance
         with the approval:
         1.    Changes to the front entry, as shown on Elevations (East only) Plan no DA-30.10,
               Rev 21 and dated 16.05.2022 and Perspective Renders Plan no. DA-41.01, Rev
               13 and dated 16.05.2022;
         2.    Reduced gross floor area as shown on Plan no. DA-00.00 and floor plans;
         3.    Changes to motorcycle parking.
         Amended plans should be lodged with Council showing these changes.
    C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
    For:       Crs Jurisevic, Wegener, Stockwell and Wilkie
    Against:   Crs Lorentson, Stewart and Finzel
                                                                                         Carried.




3   MCU21/0212 APPLICATION FOR A MATERIAL CHANGE OF USE FOR A DWELLING
    HOUSE AT 66 SEAVIEW TERRACE, SUNSHINE BEACH
    Committee Recommendation
    Moved:            Cr Stockwell
    Seconded:         Cr Jurisevic
    That Council note the report by the Coordinator Planning to the Planning & Environment
    Committee Meeting dated 12 July 2022 regarding MCU21/0212 for a Development Permit
    for Material Change of Use - Dwelling house situated at 66 Seaview Terrace, Sunshine
    Beach and note the applicant has stopped the current period pursuant to the Planning Act
    2016 in order to make some changes to the proposal plans.
                                                                     Carried unanimously.




                                                                                 Page 7 of 13

Section 8

GENERAL COMMITTEE MEETING MINUTES                                                      18 JULY 2022


6.   REPORTS DIRECT TO GENERAL COMMITTEE


4    CONTRACT NO. T000078 – REGISTER OF PRE-QUALIFIED SUPPLIERS FOR
     PROVISION OF FIRETECH SERVICES
     Committee Recommendation
     Moved:           Cr Stewart
     Seconded:        Cr Wilkie
     That Council note the report by the Peregian Digital Hub Director to the General Committee
     Meeting dated 18 July 2022 and
     A.   Award Contract No. T000078 for a Register of Pre-qualified Suppliers for the Provision
          of Firetech Services for a period of twelve (12) months commencing on 1 August 2022
          to the following suppliers:
                3FB Aerworx Pty Ltd
                Meshed Pty Ltd
                Fireball International Pty Ltd t/as EXCI.AI
                Bredon Kynnie McAtee t/as Image Knowledge (Mayday.ai GmbH)
                Mirragin RAS Consulting Pty Ltd t/as Mirragin Consulting
                N5 Sensors, Inc.
                Ninox Robotics Pty Ltd t/as Ninox Robotics
                OroraTech GmbH
                Arvind Satyam (Pano AI)
                Redeye Apps Pty Ltd t/as RedEye
                Ripper Corporation Pty Ltd
                Skybase Limited t/as Skybase
     B.   Subject to satisfactory performance of the suppliers, authorise the CEO (or delegate)
          to approve the option to extend the contract at the expiry of initial term for a further four
          (4) terms of up to twelve (12) months each ending on 31 July 2027.
                                                                             Carried unanimously.



5    DESTINATION MANAGEMENT PROJECT CONTROL GROUP
     The following material was presented to the meeting in relation to this item:
         Cr Stockwell – refer to Attachments 1 and 2.
     Motion
     Moved:           Cr Stockwell
     Seconded:        Cr Wilkie
     That Council note the report by the Manager, Economic Development to the General
     Committee Meeting dated 18 July 2022, and
     A.   Establish Governance around the project that embeds a “Whole of Council”, “Whole of
          Community” approach to the development of the plan.
     B.   Approve the formation of a Destination Management Plan (DMP) Internal and External
          Project Control Group (PCG) that internally meet on a monthly basis and jointly on a
          bi-monthly basis;
     C.   Approve an EOI process commencing 25 July – 8 August to appoint up to 3 additional
          community members with relevant community and industry experience as well as
          qualifications and request a report recommending the appointment of up to 3

                                                                                        Page 8 of 13

Section 9

GENERAL COMMITTEE MEETING MINUTES                                                 18 JULY 2022


         community members be provided to the next General Committee meeting on 15
         August;
    D.   Request the joint internal and external PCG at its first meeting develop a participative
         approach to the guidance of the plan process.;
    BE. Approve the Terms of Reference for the DMP PCG provided at Attachment 1 except
        as amended above; and
    CF. Appoint Cr Stewart – Mayor as the Chair, and Councillors Lorentson and Stockwell as
        representatives on the DMP PCG.
    Amendment
    Moved:         Cr Stewart
    Seconded:      Cr Wegener
    That Item F be amended to read:
    F.   Appoint Cr Stewart – Mayor as the Chair, and Councillors Lorentson and Stockwell as
         representatives on the DMP PCG and that Councillor membership on the PCG be
         reviewed on a 6 monthly basis.
                                                                      Carried unanimously.

    Committee Recommendation
    Moved:          Cr Stockwell
    Seconded:       Cr Wilkie
    That Council note the report by the Manager, Economic Development to the General
    Committee Meeting dated 18 July 2022, and
    A.   Establish Governance around the project that embeds a “Whole of Council”, “Whole of
         Community” approach to the development of the plan;
    B.   Approve the formation of a Destination Management Plan (DMP) Internal and External
         Project Control Group (PCG) that internally meet on a monthly basis and jointly on a
         bi-monthly basis;
    C.   Approve an EOI process commencing 25 July – 8 August to appoint up to 3 additional
         community members with relevant community and industry experience as well as
         qualifications and request a report recommending the appointment of up to 3
         community members be provided to the next General Committee meeting on 15
         August;
    D.   Request the joint internal and external PCG at its first meeting develop a participative
         approach to the guidance of the plan process;
    BE. Approve the Terms of Reference for the DMP PCG provided at Attachment 1 except
        as amended above; and
    CF. Appoint Cr Stewart – Mayor as the Chair, and Councillors Lorentson and Stockwell as
        representatives on the DMP PCG and that Councillor membership on the PCG be
        reviewed on a 6 monthly basis.
                                                                     Carried unanimously.


    The meeting adjourned at 11.54am.
    The meeting resumed at 12.06pm.




                                                                                   Page 9 of 13

Section 10

GENERAL COMMITTEE MEETING MINUTES                                                  18 JULY 2022


6   APPLICATION OF NATIONAL COMPETITION POLICY REFORM
    Motion
    Moved:          Cr Jurisevic
    Seconded:       Cr Lorentson
    That Council note the report by the Manager Financial Services (Acting) to the General
    Committee Meeting dated 18 July 2022 and:
    A.   Continue to apply the Full Cost Pricing reform option to the Waste Management
         business activity for the 2022/23 financial year in accordance with section 44(1)(b) of
         the Local Government Act 2009; and
    B.   Continue to apply the Code of Competitive Conduct to the Holiday Parks business
         activity for the 2022/23 financial year in accordance with section 47 of the Local
         Government Act 2009.
    Amendment
    Moved:           Cr Stockwell
    Seconded:        Cr Wilkie
    That Item C. be added to read:
    C.    Request the CEO bring a report to Council prior to the commencement of the 2023/24
          Budget which looks at the cost implications of including an offset value for greenhouse
          gas emissions from the landfill with the potential to phase in a process leading to zero
          net emissions by 2026.
                                                                           Carried unanimously.
    Committee Recommendation
    Moved:          Cr Jurisevic
    Seconded:       Cr Lorentson
    That Council note the report by the Manager Financial Services (Acting) to the General
    Committee Meeting dated 18 July 2022 and:
    A.   Continue to apply the Full Cost Pricing reform option to the Waste Management
         business activity for the 2022/23 financial year in accordance with section 44(1)(b) of
         the Local Government Act 2009; and
    B.   Continue to apply the Code of Competitive Conduct to the Holiday Parks business
         activity for the 2022/23 financial year in accordance with section 47 of the Local
         Government Act 2009.
    C.   Request the CEO bring a report to Council prior to the commencement of the 2023/24
         budget which looks at the cost implications of including an offset value for greenhouse
         gas emissions from the landfill with the potential to phase in a process leading to zero
         net emissions by 2026.
                                                                          Carried unanimously.



7   FINANCIAL PERFORMANCE REPORT – JUNE 2022
    Committee Recommendation
    Moved:          Cr Stewart
    Seconded:       Cr Jurisevic
    That Council note the report by the Financial Services Manager (Acting) to the General
    Committee Meeting dated 18 July 2022 outlining the interim 2021/22 full year financial
    performance against budget, including key financial sustainability indicators.
                                                                          Carried unanimously.
                                                                                   Page 10 of 13

Section 11

GENERAL COMMITTEE MEETING MINUTES                                                 18 JULY 2022


8    APPOINTMENT OF PLANNING & ENVIRONMENT COMMITTEE CHAIR
     Committee Recommendation
     Moved:           Cr Wilkie
     Seconded:        Cr Stewart
     That Council note the report by the Chief Executive Officer to the General Committee Meeting
     dated 18 July 2022 and appoint Cr Wegener as the Chairperson for the Planning and
     Environment Committee.
                                                                           Carried unanimously.



9    2022 LGAQ ANNUAL CONFERENCE MOTIONS – NOOSA COUNCIL
     Committee Recommendation
     Moved:            Cr Stockwell
     Seconded:         Cr Jurisevic
     That Council note the report by the Chief Executive Officer to the General Committee Meeting
     dated 18 July 2022 and approve the submission of the following motions to the Local
     Government Association of Queensland (LGAQ) Annual Conference 2022 for consideration
     and debate:
     A.     “That the LGAQ calls on the State Government to make changes to the relevant
            legislation being the Local Government Act 2009 and the City of Brisbane Act 2010
            that would enable Local Governments to offer Environmental Upgrade Agreements
            throughout Queensland.”
     B.     “That the LGAQ calls on the State Government to abandon their position that prevents
            Council’s from codifying requirements for energy efficiency, solar power and other
            emissions reduction and adaptation provisions relevant to new development in their
            Planning Schemes.”
     C.     “That the LGAQ calls on the State and Federal government to approve the Australian
            Building Codes Board’s recommended updated energy provisions for new homes, at
            the next Building Ministers Forum.”
                                                                       Carried unanimously.




7.   CLOSED SESSION

     Nil.




The meeting closed at 1.16pm.




                                                                                  Page 11 of 13

Section 12

GENERAL COMMITTEE MEETING MINUTES   18 JULY 2022


Attachment 1 – Cr Stockwell




                                    Page 12 of 13

GENERAL COMMITTEE MEETING MINUTES                                18 JULY 2022

Attachment 1 — Cr Stockwell

                  Top three issues that respondents felt would impact on Noosa's reputation
                    if further growth happens without better management & or infrastructure

      Traffic Congestion/Parking Tourist Precincts Too many cars on Teewah Beach Congestion/conflicts on the Noosa River

                                                                 Page 12 of 13

Section 13

GENERAL COMMITTEE MEETING MINUTES   18 JULY 2022


Attachment 2 – Cr Stockwell




                                    Page 13 of 13

GENERAL COMMITTEE MEETING MINUTES                                                              18 JULY 2022

Attachment 2 — Cr Stockwell

  Community         Noosa Plan 2020            Environment               Cultural Plan              iie-litjee) a:
  Mandate           Economic Strategy        | Strategy                  Transport Strategy       | Strategy
                                                                                                                                                        Quality
                                                                                Experience                                                            experiences
  he               Scenic Amenity Maintained        Natural Assets           Nature & Culture,       Easy, safe access                                 for locals
                      & Relaxed Village Vibe       used within Limits    not Congestion and Clutter                                                   and visitors
 i]                                                                                                                                           Long term
    eee              Over used landscapes and     Lack of Management        Car based day tripper     Congested road                            jobs in
                        under managed key        Controls for Visitation          growth                  network                              tourism
                           experiences
                    *  Carrying Capacity      *   Distribute load across *  Enhanced Booking/      *   Improve active                                 High use
      :                Controls on high use      shire                      Scheduling of              and public                                   ecosystems
  4 ase sd             assets e.g. North Shore    Enhanced Booking &        Experiences,               transport                                  regenerating
 vata ifely            Cars, River moorings       Scheduling Technology  *  Marketing, e.g. focus on   networks
                    *  Place makinginvillage/ *   Price signals,            regenerative tourism   *   Encourage Micro-
                       business centres       *   Behaviour Change       *  price signals              mobility
 )                                                                          (eg parking/congestion) *  Introduce MaaS
  Monitoring
  Evaluation                     Internationally Recognised Sustainable Destination Accreditation
  Reporting and
  Improvement

                                                                                              Page 13 of 13

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.