Skip to the record
Beware of cheap imitations.

Original source · versioned page text

LATE RFI -App F - Meeting Notes 20.06.2025

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

3. COUNCIL ISSUE - STORMWATER MANAGEMENT
    • The Stormwater Management Report lacks details on stormwater reuse and climate change
       considerations. Council is also concerned about the discharge rate to the kerb and potential traffic
       hazards.

INFORMATION REQUIRED -
    • More detail is needed to show compliance with PO2 and PO3 of the Sustainable Building Design Code
      and Overall Outcome (d) and PO2 of the Water Quality and Drainage Code under the Noosa Plan 2020.

    •   Plans must indicate the design discharge rate at the kerb; Council is unlikely to support rates over
        25L/sec without a traffic risk assessment.

MEETING NOTES + CONFIRMED DIRECTION
Meetng Note:
   - All agreed that, these are a formality and need to be addressed by Engineer

Direction: Reitsma to reach out to Westera and request for the RFI information to be addressed.
Log in to download the original file

LATE RFI -App F - Meeting Notes 20.06.2025.pdf · 386 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.