Original source · versioned page text
LATE RFI -App F - Meeting Notes 20.06.2025
3. COUNCIL ISSUE - STORMWATER MANAGEMENT
• The Stormwater Management Report lacks details on stormwater reuse and climate change
considerations. Council is also concerned about the discharge rate to the kerb and potential traffic
hazards.
INFORMATION REQUIRED -
• More detail is needed to show compliance with PO2 and PO3 of the Sustainable Building Design Code
and Overall Outcome (d) and PO2 of the Water Quality and Drainage Code under the Noosa Plan 2020.
• Plans must indicate the design discharge rate at the kerb; Council is unlikely to support rates over
25L/sec without a traffic risk assessment.
MEETING NOTES + CONFIRMED DIRECTION
Meetng Note:
- All agreed that, these are a formality and need to be addressed by Engineer
Direction: Reitsma to reach out to Westera and request for the RFI information to be addressed.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original