Council archive · source document
Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251
Plans and drawings: the text below has words only, no drawings.
4.2. Additional Treatment Considerations Due to the site’s location (i.e. part of the Coastal Creeks Catchment and proximity with Lake Weyba), additional infiltration of runoff to reduce the volume and frequency of runoff events occurring should be taken into consideration. As detailed in the Girraween Stormwater Management Plan (Ecological Engineering, 2006), where possible, the frequency and volume of surface runoff discharged to the wet heath vegetation should be reduced by maximising the infiltration of stormwater runoff to groundwater. Bioretention is considered to represent the most effective stormwater treatment technology currently available for nutrient removal and has the smallest land take per kg of nutrient removed of all current treatment technologies. By constructing these systems with a “leaky” base, the opportunity to infiltrate runoff into the underlying dune sands is increased (Ecological Engineering, 2006). Other options for “leaky bases” and increased infiltration include stormwater pits and the proposed detention tank system detailed in Section 6. Measures such as these are commonly used in Western Australia and can be further investigated during the detailed design phase following discussions with SCRC officers. STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET Page 6 Scanlon Property Group R002616
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Stormwater Management Plan by O2Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.