6.5. Time of Concentration
The time of concentration has been calculated for the pre and post development scenarios following the
procedures recommended in Section 4 of QUDM.
For the pre development scenario, the time of concentration was calculated using Friend’s Equation for
overland sheet flow. Details of the pre development time of concentration are shown below in Table 9.
The time of concentration for the remaining portion of flow was calculated using an average flow velocity
that was verified with the results of the hydraulic model described in Section 6.9.
Table 9 – Pre Development Time of Concentration
Sheet Flow Length Sheet Flow tc Channel Flow Velocity tc Total tc (min)
(m) Gradient (mins) Length (m) (m/s) (mins)
20 13.4% 7.77 63 0.9 1.17 8.94
For the post development scenario, the time of concentration of 5 minutes was estimated from the
recommended standard inlet times provided in Table 4.06.1 of QUDM, with an additional 0.5min was
added for the pipe flow component.
6.6. Rainfall Intensities
Intensity Frequency Duration (IFD) data for the site has been derived in accordance with Australian Rainfall
and Runoff (ARR) though the use of the AUS-IFD software. The rainfall intensities generated for the site are
shown below in Table 10.
Table 10 – IFD Data Applied to Hydrologic Assessment
Duration I1 I2 I5 I10 I20 I50 I100
(mins) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr)
10 100.0 127.0 156.0 173.0 195.0 225.0 248.0
15 84.0 107.0 131.0 145.0 165.0 190.0 209.0
20 73.0 93.0 115.0 127.0 144.0 167.0 184.0
25 66.0 84.0 103.0 114.0 130.0 150.0 165.0
30 60.0 76.0 94.0 104.0 118.0 137.0 151.0
45 48.2 61.0 76.0 84.0 96.0 111.0 122.0
60 41.1 52.0 65.0 72.0 82.0 95.0 105.0
90 31.4 40.1 51.0 57.0 65.0 76.0 84.0
120 25.8 33.2 42.3 47.7 55.0 64.0 72.0
STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET Page 14
Scanlon Property Group
R002616
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Stormwater Management Plan by O2Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.