Council archive · source document
Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251
Plans and drawings: the text below has words only, no drawings.
7. Summary This SMP has been developed for the proposed commercial development located at 215 David Low Way at Peregian Beach. A treatment train has been devised to ensure the relevant water quality objectives can be achieved for runoff exiting the site, and that pre development peak flow rates can be maintained. Based on this assessment, the following conclusions have been made: The relevant water quality objective for the site are load based reduction targets of: o TSS 80%, o TP 60%, and o TN 45%. These water quality objectives can be achieved by implementing a treatment train consisting of: o 4 bioretention systems providing a total of 56m² of filter area (at 0.4m depth). Detention of runoff will be required to ensure pre development peak flow rates from the site are maintained. A minimum storage volume of 98.8m³ is required to achieve this objective. To reduce the volume and frequency of runoff occurring, additional infiltration opportunities will be investigated prior to Operational Works Approval. Options for increased filtration include the use of leaky bases in the bioretention systems, stormwater pits and the proposed detention tank system. STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET Page 18 Scanlon Property Group R002616
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Stormwater Management Plan by O2Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.