Council archive · source document
Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251
Plans and drawings: the text below has words only, no drawings.
; | LEGEND 200 ——-_ FLOW DIRECTION \ | —s— PIPED DRAINAGE | | | [)_ BIORETENTION SYSTEM DETENTION TANK DETENTION TANK - 100m? STORMTRAP OR SIMILAR PRODUCT ‘ \ 250 FACILITATE SHEET FLOW TOWARDS BIORETENTION SYSTEMS, AS INDICATED. 3.00 BIORETENTION SYSTEM DESIGN PARAMETERS EXTENDED DETENTION \ 2 LD. FILTER AREA (m?) |FILTER DEPTH (m) DEPTH (mm) ) BIO 1a & BIO 1b ' (COMBINED) 20 0.40 0.15 / BIO2 10 0.40 0.15 ‘ BIO3 16 0.40 0.15 BIO 4a & BIO 4b (COMBINED) 10 0.40 0.15 www.o-2.com.au 0 4 8 42 16 20m DRAWN BN CLIENT TITLE ENVIRONMENT+ DESIGNED | BN SCANLON PROPERTY GROUP OPERATIONAL CONTROL ENGINEERING I, ®) SCALE 1:400 APPROVED | SC PROJECT CONCEPT PLAN ACN: 198.360 824 | ABN: 7B 1288810926 AQ rrescate snows omtanscpesvana s CALE DATE 25/11/13 SEU HO ne > covenant © coos ance PUD STORM WATER MANAGEMENT PLAN 7 8 Grebe Sirest Ground Floor, 48 Whart St RPEQ NO. NIA DRAWING NO. XK “GaN EE “0 toate "Tey | DATE | REVISION DETAILS APPROVED Resseguurnmescmee cromagumeeaascomwcseowers GRIDER P Wa |” PEREGIAN VILLAGE MARKET $C13-0128-004 Thursday, 12 December 2013 2:30:28 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Stormwater Management Plan by O2Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.