Council archive · source document
Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251
Plans and drawings: the text below has words only, no drawings.
Tables Table 1 – Water Quality Objectives 7 Table 2 – MUSIC Rainfall Data 7 Table 3 – MUSIC Monthly Evapotranspiration Data (mm) 7 Table 4 – MUSIC Rainfall Runoff Parameters 8 Table 5 – MUSIC Pollutant Export Parameters 8 Table 6 – MUSIC Catchment Parameters 9 Table 7 – MUSIC Bioretention Parameters 10 Table 8 – MUSIC Results 11 Table 9 – Pre Development Time of Concentration 14 Table 10 – IFD Data Applied to Hydrologic Assessment 14 Table 11 – Site Hydrology 15 Table 12 – Rational Method comparison 15 Table 13 – Detention Tank Configuration 16 Table 14 – Basin Performance 17 Appendices Appendix A Operational Control Concept Plan A STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET Page iv Scanlon Property Group R002616
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Stormwater Management Plan by O2Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.