sunshine Coast Checklist - Applications Involving Land
Regional Council Development & Land Use Sections

 

 

IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

1. APPLICATION FORMS
4.1. Form1PartA

1.1.1. Ensure that the form is fully completed and is a current version. JM

 

 

 

 

1.1.2. In the case of an MCU or Op Works below the. high-water mark, owner's consent is required.
4.1.2.1 If there are multiple owners, the consent of each owner is required.

4.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.

1.2. Form Part B-R Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. [ut
om = 442.1 — Ensure that-each of Forms B-R.which.are attached are fully completed. _

 

2. IDAS ASSESSMENT CHECKLIST. |” OW Da ge,
2.1. Ensure that relevant sections have been checked and/or completed with regard to referrals

 

2.2 Ensure correct parts of Form 4 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works) [—t

3. “ENVIRONMENTALLY RELEVANT ACTIVITIES.
3.1 Ensure that Part G is completed if EPA referral is required.

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees)
A

4, FORM 2-REQUEST TO CHANGE APPROVAL 3,

 

 

 

 

 

 

 

4.1 Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records. |
If over multiple properties on one or more sites, consent of Body Corporate is required. ‘
5. PLANS *: " . “ Loe

 

5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompany the application. In addition ensure that each set is complete. {

 

 

 

 

§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is _
unbound,
6. | SUPPORTING INFORMATION ~~ ? Oy wll gees

 

6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration | —
and Operationat Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.

6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping

7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees, W
accompanies the application or has been paid.

 

 

 

 

 

 

 

 

 

 

« Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational
Work if Jetty or if including Landscaping. :

« Land Development Lot Reconfiguration applications and Operational! Work not including Landscaping

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

- NSC g:\landuse\administrative processes\application checklist.doc
Full text of the other 16 pages

Page 2

 

IDAS REFERRAL AGENCIES TRIGGERS (Most frequent referrals)
Please refer to IDAS Checklist for complete list

:YES

COMMENT

 

Please tick

 

Department of Main Roads (Concurrence or Advice)
e _State Controlled Road

 

Dept Natural Resources & Water

e Acid sulphate soils (Advice)
¢ Clearing of native vegetation on freehold land (Concurrence)

 

Environmental Protection Agency (Concurrence)

¢ Environmentally Relevant Activity (for non-devolved Council as EPA)
« Contaminated land
« Environmental Management/Contaminated Land Register
« UXO
* Land recently used as a ‘notifiable activity’
« Industrial land changed to sensitive uses (eg school)
e Coastal related development.
e Koala habitat
« Wetlands (Advice only)

 

Queensland Transport (Concurrence)
. Railway
. Public Passenger Transport

 

Energex or other responsible entity (Advice)
° Electricity Easements/Substations

 

DIP (Concurrence)
. SEQ Regional plan

 

VARIOUS < ‘
. Conservation estate (Advice)

 

OTHER STATE AGENCIES + TRIGGERS
BB ak gy

 

 

 

 

OWNER’S CONSENT (State land)

a Tat aye

   

48

 

Department of Natural Resources and Mines

EPA

 

 

 

 

For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.

NSC g:\landuse\administrative processes\application checklist.doc

 

Page 3

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

7° —T

fApplication fetes

Part A

Common details

(OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.

 

    
  

 

Applicant details (The Applicant is the person responsible for making the application and need not be ihe owner of the land. The Applicant is responsible for ensuring the |
information provided on the IDAS Application Form is correct. This information is relied upon by the Assessment Manager and any referral agencies when assessing and
‘deciding this application. By fodging this application, the Applicant incurs the obligations and responsibilities prescribed by the IPA. Any development permit or preliminary
approval that may be issued as a consequence of this application will be issued to the Applicant.)

 

 

 

Company/organisation name (if applicable) |Pile-it Pty Ltd a Noosa Jetty Builders

 

 

Individual applicant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)

Title (ws | First name Last name [Reed
Postal address lpo Box 299, Noosaville. QLD 4566

Contact telephone number Mobile phone number
Facsimile number lorsa7asago si e-mail address

'Détaits of the premises (ie. the land on which the development is proposed - refer fo the advice at the end ofthe S
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is git
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complet abl iy. Then 2. a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
  

 

 

: : fritn
| Name of each local government area in which the mobile and temporary Rays | propdsbind state ow % AY
= “&
L_ Lt 70ug, ~4 |
OR os v

aii S
TableB Street address for the premises (tick applicable box/es below and insert property description irNNE table. fee

 

 

 

 

 
 
   
     

  

  
 

. . Ont oy "ANtin
() [C) Street address / lot on plan for the premises (Appropriate for most applications including buildyg app¥cgtions); Huaton
(ii) JX] Street address /lot on plan for the land adjoining or adjacent to the premises (Appropndtatoy pp atene

pontoon etc) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the local govel

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Street Address Lot on plan description
Tat T Stree! Plan iype and Local goverment area (e.g. Logan,
No. | ‘No. Street Name and official suburbVlocality name ' . | Post Code | Lot No. Plan Number / Caims)
1 185 | Shorehaven Drive, Noasaville QLD 4566 714 SP 100034 Sunshine Coast Regional Council
AND/OR
Table C . Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) elc.)
Coordinates
__ (Note: place each set of coordinates in 2 separate row} Zone Datum Local government area
Easting Northing Latitude Longitude Reference ___ Hf applicable)
1 (1 ocpas4
(D wesss
(] Other -

 

 

 

 

 

 

 

 

 

 

2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)

 

L Name of water body, watercourse or aquifer (If known)

 

 

[1 | Noosa Waters Canal
Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on pian description for strategic port land Port Authority for the lot
(1

Table F Complete if the premises are in tidal water
Name of locat government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable)
[1

3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)

 

 

 

 

 

 

 

 

 

 

 

 

Total area of prémises™ ——=

 

760.00 2X] m? [_] hectares (Tick applicable unit)

 

 

 

 

 

|Existing use of the premises J
4, — Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)

 

| 1 vacant land

 

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?

No O Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
f 5 _ sam: .,
Proposal details 1
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)

 

 

New timber jetty

 

 

 

7, Does the poposal include new buildings or operational work (including any services) on the premises?

0 No & Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application

 

‘Resource entitlement (if applicable) - further information is provided in the advice section at the end of the form |

 

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

& No -GotoQ¢ O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go fo the next section.

 

‘Owners consent (if applicable) _- further information is provided in the advice section at the end of the form ]

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.

 

 

 

 

 

Premises Owner's name/s Details of the premises owned . . Date consent
Table H and postal address (street address or lot on plan description) Owners signature was obtained
1 |Brian Smalley 185 Shorehaven Drive, Noosaville 4566 22 \ 03/11/2009
ey
2 |Susan Smalley 185 Shorehaven Drive, Noosaville 4566 {03/11/2009

 

 

 

 

 

 

 

 

* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .

Page 5

INTEGRATED PLANNING ACT 1997

 

———————
‘Attachments and supporting information (Complete Tablet - ~ Use a separate row for each type of atlachment or information, including information required '
Sunder this Part) Please ensure al documentation submitted with this form, inchuting other Paris of Form 1, or owner's consent, etc, are securely attached to this Part of the Form. ‘
bs -

Part A, Version 3.1, 3 March 2008

 

 

 

 

 

 

 

 

 

 

Description of attachment or information .

Table | (29 Pa Coffe | ome/scncat efter Ie | gg Gone ne eect ae repos| 034 aeeccmen manger
1 Part E 02-Nov-2009 over the counter
Checklist 02-Nov-2009 | over the counter
John Norden Pans 02-Nov-2009 | over the counter

 

 

 

 

[Portable L Long Service Service Leave (PLsL) levy (Applcabe fi for certain ain building and and construction tion work valued ove over $80,000 only)

 

 

 

10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( ( Tick box it applicabe)

(CJ the application seeks a preliminary approval only;

([] the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);

[X all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or

(C1 the work is being carried out under an owner-builder permit issued under the Queens/and Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
Sighted by the assessment manager before a development permit can be given.

11.

EX] No - End of Part A

(1) Yes - Answer Q12 below

ls payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

, Receiving officer's Reference
Fee ($) lyre Date received 16 “ (<4 name P5 Aras numbers 04 | (<€3
J
\ NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER |
To: (Council, | have been engaged as the private certifier for the building work referred to in this application.
Date of Name BSA Certification number | Building classifications
engagement 3
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
Description of the work QLeave Project Number |Amount paid ($)| Date paid form sighted by Name of offices who sighted the
manager
{
Privacy Statement

The information collected on Form 1 will be used by the Department of Infrastructure and Planning {DIP} in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation {including the Freedom of Information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.

 

Advice for completing Part A

 

General advice

 

. Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.

. The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.

 

 

 

Page 6

 

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Applicant details

 

 

. If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.

Details of the premises

° The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
structure is situated on the land), The term ‘land’ is also defined to include the estate in, on, over or under the land.

je Details of the land are not required if the application involves a mobile and temporary Environmenially Retevant Activity only. Instead complete
Table A.

je The premises may be identified in a number of ways —

* Street address and lot on plan are most common and will apply to most applications.

* Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.

. The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.

* StrategicPortLandis within a local goverment area but a local govemment's planning scheme does not apply onStrategicPortLand.
StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to DAS Guide 11 (Development on
strategic port land) and the Queensland Transport (Ports) website.

° “Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below “high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the local goverment tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).

 

Resource entitlement
. Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence.

 

. For applications involving the taking or Interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.

° For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.

* Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.

Owner's consent

. Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the

application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994.

. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.

. “Owner for the purpose of a lodging an DAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

° Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.

le Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.

 

Portable Long Service Leave (PLSL) Levy

. The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland.

* The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.

. The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

° The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.
° The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and

Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.gleave.qid.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:
www.qleave.aid.gov.au }

 

 

Page 7

INTEGRATED PLANNING ACT 1997 Part E, Version 3.2

    

Form 1 Development Application

Part E

Building &/or operational works assessable
against a planning scheme!

‘Nature of the works

1. Nature of work that requires assessment against a planning scheme:

 

 

(J Building work - Complete Table A KK] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
{[] Roadworks [[] Stormwater (J Water infrastructure (1) Sewerage infrastructure
[[] Landscaping (7 Earthworks ([] Drainage Works TC) Signage
{([] Clearing vegetation under the planning scheme Other - Specify below
Timber Jetty

 

 

 

(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[X] Development Permit (J Preliminary approval (] Both (Specify below)

(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
[XJ No _[[] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Pennit or Preliminary Approval for MCU or reconfiguring
alot)

No [_] Yes - Complete Table Ba)

 

 

 

2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 10,670

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Mandatory Information , |
3. Confirm that the following mandatory information accompanies this application
Confirmation of
lodgement Method of lodgement
ifications ¢ i ing th ion of th Tks finctudi
enn ant if applicable, showing the nature and location of the proposed works (including the Ri Confirmed over the counter
OFFICE USE ONLY
Date Received Reference Numbers

 

 

 

 

Advice for completing Part E

General advice
« Part A must also be completed for ail IDAS development appfications.
» The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

 

Qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur

 

 

Page 8

INTEGRATED PLANNING ACT 1997 Part E, Version 3.2

1 This form is also used for building or operational work assessable against the land use plan for Caims airport land or Mackay airport land. Wherever ptanning scheme is
mentioned, take it to mean the fand use plan for the airport land.

Page 9

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

idas)

 

 

Assessment Checklist

 

DAS Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act
1997 IPA}. Form 1 is made up of various Parts.

Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application.

Form 1 also includes this [DAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 4 relevant to the application.
al fie idéritified in thie Table below; must 68)
completed for all development applications except those proposed on land in an urban development area, or for building work
requiring assessment against the Building Act 1975 only.

 

For more information about development applications on land in an urban development area, refer to www.ulda.qld.gov.au.
For more advice about bullding applications refer to Part B of the IDAS Application Form.

 

 

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www.dip.qid.gov.au for help

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist

Does the application seek approval to make a material change of use of the premises?
ifyes - complete Section 2 of this checklist

 

 

CYes |&INo

 

Does the application seek approval to reconfigure a lot?
Ifyes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. If the premises are completely within a single |] Yes |DJNo
local government area assessment is by the local government.

Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist Yes |CINo

 

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
if yes - complete Section 5 of this checklist

(Yes |KINo

 

Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?
ff yes - complete Section 6 of this checklist C1 Yes |fJNo

 

Does the application seek approval to carry out building work requiring assessment against a local government planning

scheme? {Yes |LJNo
if yes - complete Form 1 Part E of IDAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
ifyes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. Cl Yes iJNo
Assessment is by a building certifier

Do you wish the application fo be assessed against a superseded planning scheme?
if yes - complete Form 1 Attachment 1 (Yes |KINo

 

 

 

Is the application for development completely or partly on Cairns and Mackay airport land under the Airport Assets
(Restructuring and Disposal) Act 2008?

if yes - Assessment is by the Department of Infrastructure and Planning. Complete Form 1 Part D of IDAS Application Form 1 if the OYes |&INo
application is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the
focal government as Advice Agency.

 

 

 

 

 

“a

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

SECTION 4 Section 1 must be completed for ali applications that require completion of the IDAS Assessment Checklist.

a = =
HERITAGE ~

 

 

 

 

 

 

1.1A ls any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
PX] No-Goto118 =] Yes

WS schedue § part? table tem 2 tatoo schedule 2. iav'e 2 sem *E

 

1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?

DX] No-Gotoor2  (] Yes

IPA, schedule 8. part 1. iable 5, tem 2A. IP Regulation, schedule 1 part 2 table 5, dem 2.

 

REMOVING QUARRY MATERIAL; WILD RIVER AREA q

1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
BX] No-Gotoar.3 [_] Yes

IPA, schedule 8, part 1. table 5. item 1: IP Regulation, schedule 2, table 2, item 11; 1 Regulation. schedule 1, lable 5, item 2 (wild river area); Water Act 2000,
section 966C: Wild Rivers Act 2005, section 434

 

[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA , I

13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

[IX] No-Gotoai4 [[] Yes

IPA, schedule 8, part 1, table 2, item 1: IPA, schedule 8 part 1. table 5, items 3 and 4; IP Regulation, schedule 2. table 2, items 1 and 23 Environmental Protection Act 1994, section
73,4 (wald river area); Witt Rivers Act 2005, section 43A; relevant wild river declaration: Wikd Rivers Code.

 

 

 

 

 

WITHIN THE LIMITS OF A PORT teem atone nein tsar
14 {s any part of the premises within the limits of a port under the Transport infrastructure Act 1994?
[XJ No - Gotoat.5
C1 Yes
IP Reguiation, schedule 2, lable 2, items 15 and 16
[DECLARED FISH HABITAT AREA |
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

KX] No - Gotoar.6

C] Yes - /f answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

JP Regulation, schedule 2, table 2, item 26

‘COMMUNITY INFRASTRUCTURE

 

 

 

1.6 's any part of the premises designated for community infrastructure?

EX} No - Gotoar.7

L] Yes

IP Regulation, schedule 2, table 3. item 7
WASTE WATER MANAGEMENT ~~ ]
17 Does the proposal involve the establishment or expansion of a waste water disposal system?

DX] No - End of Section? [_} Yes
IP Regulation, schedule 2, table 3, item 5

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

SECTION 4. Section 4 must be comics when the application seeks approval to carry out operational work.
PLANNING SCHEME a ’

 

 

 

 

44 ls the proposed operational work assessable under any State planning regulatory provisions?

(No [_] Yes

If no, is the proposed operational work assessable under the planning scheme?
_ _ON- Goto 042 XX Yes - Complete Form 1, Part E and answer O4.1.1- 4.1.7 below

‘STATE: CONTROLLED ROAD

   

4.11 ts any partof the premises located in n part of a future State-controlled road, or within 100m of a State-controlled road?
No [J Yes

tf no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?

BX] No - Goto 04.1.2

oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

JP Regulation, schedule 2. table 3. item 3; IP Regulation. schedule 2, table 3. item 4{b}

 

‘ACID SULFATE SOILS we . = a eet

41.2 Is any of the operational work proposed i in a local government area listed*! in State Planning Policy 2/02: Planning and Managing
Development involving Acid Sulfate Soils

IX] No -Goto04.1.3 (J Yes

41 aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooleola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, !sis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Tomes, Townsville, Whitsunday

IP Regulation, schedule 2. table 3. item 4; State Planning Policy 2/02: Planning and a Managg Development in onaing Ac Acid Sulfate Soils, section 3.6

 

   
 

 

iEASEMENTS AND SUBSTATIONS 4
4.1.3 4s any of the proposed operational work for filling or excavation?

KX] No -Gotoo47.4

( Yes

IP Regulation. schedule 2, table 3 item 10{a}; 1P Regulation, schedule 2, table 3, item 10(b)

 

4.1.4 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

BX] No -Gotoas15 [] Yes
IP Regulation, schedule 2, table 3. item 17

 

 

[PUBLIC PASSENGER TRANSPORT _ —_ 1
4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?

[BX] No-Gotoa4.1.6  [_] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation. schedule 2, table 3, item 14

 

 

IRAILWAY SAFETY AND EFFICIENCY
4.1.6 ls any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?

BX] No-Gotoo4.1.7  [[] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2. table 3, tem 15

‘KOALA CONSERVATION (outside SEQ urban footprint) oar |

4.1.7 |s any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
EX] No -Gotoas2 [_] Yes

IP Regulation, schedule 2. table 3. dem 19

 

Page 12

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

a - =————— ——~
WILD RIVER AREA - Although fegislation provides for assessment of operational works for residential, commercial and industrial

‘development for the purposes of the Wild Rivers Act 2009, currently no dectarations for any of the wild river areas apply the Wild Rivers

‘code to that type of development.

 

 

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER |
AREA

 

4.2 Is any of the proposed operational work associated with reconfiguring a alot and the reconfiguration is also assessable?
[X] No -Goto43 [_] Yes

IPA. schedule 8, part 1, fable 4. vem 2 IP Regulation schedule 1, part 2. table 5 tem tc)

Wild Rivers coge (Nole. the code does nol currently contain apphcable provisions for residential. industrial or commercial development inside a designated urban
area}

+
£

KKOALA CONSERVATION (Inside SEQ urban footprint) 1

4.3A Is any part of the premises in an interim koala habitat protection area?

[EX] No -Gotoa438 [_] Yes
IP Regulation, schedule 2. table 2, item 34A

 

(VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA |

4.3B Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

(X) No -Gotoass {] Yes

IPA, schedule 8, part 1, table 4, items 1A-1G; IP Regulation, schedule 2, table 2, item 5 (vegetation clearing); !P Regulation, schedule 2, table 2. item 34 (koala
conservation}: IP Regulation, schedule 1, part 3, table 4, item (vegetation clearingAwild river area); Vegetation Management Act 1999, section 22A (vegetation
clearingAwild river area), Wild Rivers Act 2006, sections 31F and 43A

 

(TAKING OR INTERFERING WITH WATER; WILD RIVER AREA

we a cen camer tm ame

44 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?

No -Goto4.5 [_] Yes - Answer (a) and (b) befow

IPA, schedule 8, part 1, table 4, items 3(a); IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1. part 3, table 4. items 3 and 3A; Water Act 2000, section 9664 (wild river
area); Wild Rivers Act 2005. section 43A; relevant wild ver declaration; Wik Rivers Code

45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?

i No Goto Q4.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). IFNRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 3(b); IP Regulation, schedule 2. table 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3

Wild Rivers code (Note: the code does not currenily contain applicable provisions for taking or interfering with artesian water)

46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
BX] No -Gotoaa7 ([[] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, item 3{c)\i): IP Regulation, schedule 2. table 2. item 8: IP Regulation. schedute 1, part 3. table 4, item 3: Water Act 2000, section 966A (wild river area);
Wild Rivers Act 2005, section 434: relevant wild aver declaration; Wild Rivers Code.

47 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck fo pump water)?

IX} No -Gooase [_] Yes

IPA, schedule 8, part 1, table 4. ilem 3(c)(ii)’ iP Regulation, schedule 2, table 2. item 8: iP Regulation, schedule 1, part 3. table 4, item 3
Waler Act 2000. section 966A (wild river area)(Nole. no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?

BX] No -Gotoaz9 ([] Yes - Answer both (a) and (bj below

IPA, schedule 8 part 1, table 4, items 3(c)(ij anc’ 3(d), IP Regulation, schedule 2, table 2, tem 9, IP Regulation. schedule 1, part 3, table 4. der 3A: Water Act 2000. section 9668 (wild
Aver area) relevant wid aver declaration, Wild Rivers Code

 

Page 13

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
®& No (Yes
Act 2008
(i) To increase the storage capacity of a referable dam by more than 10% { No (J Yes

If yes to either or both (i) or (ji) above - (Complete Form 1, Part Ka) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has junsdiction as
Concurrence Agency.

IPA, schedite 8 part 1, table 4 tem 4: IP Regulation, schedule 2 table 2. tem 10

‘TIDAL WORK; WiLD RIVER AREA

4.10 ls any of the proposed operational work tidal work, other than excluded work defined under the [PA?

(1 No -Gotoa471 [_] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2. table 2, items 12, 14 and 17; IP Regulation, schedule 1, part 3, table 4, items 4A and §
Coastal Protection and Management Act 1995, section 104A (wild river area)

(COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA 4

 

4.11 \s any of the operational work proposed to be carried out within a coastal management district?
[IX] No -Gotoa4i2 (_] Yes

IPA, schedule 8, part 1, table 4, item 5: IP Regutation, schedule 2, table 2, items 12 and 14; IP Regulation, schedule 1, part 3, table 4, items 44 and 5
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area); Wild Rivers Act 2005, section 43A

‘WATERWAY BARRIER WORKS; WILD RIVER AREA |

 

 

4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?

[X] No -Gotooa13 [[] Yes

IPA, schedule 8. part 1, table 4, item 6, IPA schedule 8, part 2 lable 4 item 2° Fisheries Regulation 1995 $112A (self assessable codes); IP Requlation schedule 2 table 2 ten 28 IP
Regulation schedule 1 part 3. table 4. tem 6 Fisheries Act 1904 secnor 78D jud s.ver areay Wild Rivers Aci 2005. socton 434

 

 

‘DECLARED FISH HABITAT AREA; WILD RIVER AREA t
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
BX] No - Goto. 04.14
(1) Yes

IPA, schedule 8, part 1, table 4, item 7: IPA, schedule 8, part 2, table 4, item 3: Fisheries Regulation 1995 $1 13A (self-assessable codes): IP Regulation, schedule 2, table 2. item 25: 1P
Regulation. schedule 1. part 3 table 4, tem 7, Witd Rivers Act 2005. secnons 424, Fisheries Act. secbon 76DC (wild river area).

 

rere

(REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA J

 

4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?

BX] No -Gotoa415 [7] Yes

IPA, schedule 8. part 1. lable 4, item 8 IPA. schedule 8. part 2. tabie 4 item 4: Fishenes Regulation 1995 5113A (self-assecsable codes): IP Regulation, schedule 2, table 2, lem 29. IP
Reguiation schedule 1, part 3, table 4, ite & Fishenes Act 1994, secton 76DB (wild river area): Wild Rivers Act 2005, section 434, relevant wild river declaration, Wild Rivers Code

 

WILD RIVER AREA - - 7

 

 

4.15 ls any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?

No -Gotoa4t6 [_] Yes
IPA, schedule 8, part 1, table 4, item 10: IP Regulation, schedule 2, table 2, item 37; Wild Rivers Act 2005, sections 42. 434

 

 

"STATE-CONTROLLED ROAD

start a ad

4.16 1s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[X] No - End ofsection4 [_] Yes

IP Regulation, schedule 2, table 2, item 3

 

 

 

Page 14

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provides as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss {including direct and indirect !osses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.

 

 

 

Page 15

 

Sunshine Coast LAND USE SECTION FEES

Regional Council

 

CIVICA TYPE RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520-
Copy of Permit/Approvat Letter 110
The Noosa Plan Documentation © 111

APPLICATION FEES .
Material Change of Use - Code/Impact MCU

 

 

 

 

 

Consistent 521
Inconsistent §21
Assessment under Superseded Planning Scheme . 521
Modification to a Development Permit MOD DP : 521
Extension of a Currency Period : 521
Lot Reconfiguration RECONFIG 521
‘Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW - : :
Half Hour . 522
One Hour . 522
ADVERTISING . :
+ Purchase Advertised Applications 523
“JETTIES
" Jetty Application Fee Fre 524
Jetty Bond Soo" 51 : .
. . (Category 4) .
BONDS . ,
Performance Bond .§41
(Category 9)
SEARCH FEE /
Search of Land Use Section file 112
Liquor Licensing Request . 113
TOTAL $ [RO
nawe: $e SF fates
ADDRESS: ef- viona led. Gi ers c=
: / PO 2484 NOoTAV ie te Livloe
FILENO: of/ [S93 DATE: fui aR

 

T 7
RECEIPT NO: sc SEIS Signature of TP Officer: ?% Orta,
- = C

AUTHORITY NO:

Ze 18S Sroeherer ine I+ | roma [is03/

Boo @eeonn ~ Gort ous 357138 bo faa ener

Page 16

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

>

FEE CALCULATION

‘

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

 

TOTAL FEES

 

 

Page 17

 

pal V0 “ NCS * LNOAVT ONINVYS
<u See a emmamenas Nvid aus "8 ty

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

  

 

 

 

 

man cin NAOHE SY UBHLO Tv ‘DLC SCVED SNRIVN C4AOtddY 38 THE 108 EELS SSTINVLS Ty €
";RIOM —}—___} . ;
= MOURN Moses sow ease amen eT SS _
ave nenvuc S200U8 CBAC 40 | BV IO ALTHEVunG Ba THE Wann TY SonvOmecLO GON Sua Tay | ect ’ ’
ey ww Qa 7 Aa g | @ é
| Rene owe Wv130 ~ _—
eae . peer : —>+- 3S—— C(O tC CLV RRLL HIN OK 2
so}Ej00ssy 9 ““Soionaameone | -\
ae Ow
SY3LVM VSOON | exes
SAINQ NSAVHSYOHS “™
(SL°ON) oz
PLZ LOT NOILOSAS WOIdAL
ALLA G3SOd0ud __ _
ASTIVWS °2 s7o0 98 our 1M
veers L190 27 OD ANANGO O1 S514 THY 200 LOM wei 82 ont
sYy3zq0Ting 820 00» © ance LZ 107
ALLS? VSOON encore |
O17 Ald Lad =

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUERIVIE Ol CAMROSE
CMH 66 x 97)
*ONDD30

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ort
7 908/U S'0 - ALIOOTSA ONIHLY38
& NOILVAST3 ces | WG - T3SSZA GSYOON NNIIXWHN
cf
g | NOLLYAST3
§ 8d 0% - GVO1 BAN NOISS0
“WOLLUSA 4030 AVNOTTIVM,
JAtyg N3A eee;
vy . SS300V UVINOIHSA ON
340ns CAG GOGLGGE. BUVAMd “USSN SIONS
3009 ONMd - 6512 SV HLM asn Aur
BSONVONODOV NI GSTIVLSNI 38 TIVHS S3Tid Tv
‘9 GUVZVH OL GALVSeL ONY
GOOMOYVH G3A0Uddv 38 TIVHS SSTid Tv
‘sad
* “GHV +0 TH MALVM WOWININ
CHV O'} te
QHV 0} Ta 4030
TIWM 40 dOL

 

 

 

 

 

* GHV 002 Ta T3A37 00014 GaquOose WANT”

 

 

 

 

Used in these records

About this file

File size
967 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1583 - Op Works - Jetty [As Published].pdf · 967 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.