Council archive · source document
09/1583 - Op Works - Jetty [As Published] · 142009.1583
INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
Form 1 Development Application
Part E
Building &/or operational works assessable
against a planning scheme!
‘Nature of the works
1. Nature of work that requires assessment against a planning scheme:
(J Building work - Complete Table A KK] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
{[] Roadworks [[] Stormwater (J Water infrastructure (1) Sewerage infrastructure
[[] Landscaping (7 Earthworks ([] Drainage Works TC) Signage
{([] Clearing vegetation under the planning scheme Other - Specify below
Timber Jetty
(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[X] Development Permit (J Preliminary approval (] Both (Specify below)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
[XJ No _[[] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Pennit or Preliminary Approval for MCU or reconfiguring
alot)
No [_] Yes - Complete Table Ba)
2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 10,670
(Mandatory Information , |
3. Confirm that the following mandatory information accompanies this application
Confirmation of
lodgement Method of lodgement
ifications ¢ i ing th ion of th Tks finctudi
enn ant if applicable, showing the nature and location of the proposed works (including the Ri Confirmed over the counter
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
General advice
« Part A must also be completed for ail IDAS development appfications.
» The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
Qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1583 - Op Works - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 967 KB (small file)
- File type
No other editions are linked here.