RFI - Attachment H - Stormwater Management Plan_Issue C_

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
15 May 2019


noted that the downstream environment is slightly acidic and as such treatment of any groundwater is
likely to be minimal.

Stormwater discharged from site will also be consistent with that which is currently collected on site and
discharged into the downstream system. A detention system will be installed to ensure that peak runoff
from the site doesn’t exceed the current volumes discharged from the currently undeveloped site.
Stormwater treatment will be implemented to remove sediments, nutrients, gross pollutants and
hydrocarbons in accordance with the requirements of Noosa council and the state planning policy.

The proposed conceptual stormwater drainage layout is depicted on MPN Plan 7700-DA.01 attached in
Appendix 3.

5.3.2 Stormwater Quantity Management Strategy

For the management of stormwater quantity for the proposed development, the DRAINs computer
model was used to calculate the stormwater runoff quantity for the existing site and developed site
conditions. Runoff flows for the Average Recurrence Intervals of 2, 5, 10, 20, 50 and 100 years and
durations of 5 minutes to 120 minutes were calculated to ensure that peak runoff flows from the
proposed site with detention would not exceed peak runoff flows from the existing site.

Stormwater runoff from the proposed development will be detained in a detention tank located at the
main entry to the new building. The detention system is fully contained within the developable areas of
the site.

Stormwater events varying from 5 minutes to 120 minutes were analysed with results for the peak
storm flows shown in Table 1 below.


                                             Existing Discharge                        Proposed Discharge
        ARI Year
                                             From Site (m3/sec)                         From Site (m3/sec)

             2                                        0.196                                  0.195

             5                                        0.271                                  0.254

            10                                        0.310                                  0.296

            20                                        0.359                                  0.349

            50                                        0.390                                  0.386

           100                                        0.435                                  0.435

                                       Table 1 – Existing and Developed Peak Flows

The proposed detention tank has a volume of 155m3.

5.3.3 Stormwater Quality Management Strategy

In order to satisfy the requirements of the State Planning Policy July 2017 for the adequate treatment
of stormwater runoff, mechanical treatment solutions have been provided to remove hydrocarbons,
suspended solids and nutrients prior to being discharged from site.

5.3.3.1 Potential Pollutants Generated


Excellence with Economy in Engineering                                                                       10
l:\7000-7999\7700-7799\7700\reports\15-05-19 stormwater management plan_issue c.docx
Log in to download the original file

RFI - Attachment H - Stormwater Management Plan_Issue C_.pdf · 15.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.