Log in to see the plans as drawn2.4 Maintenance methods
2.4.1 Minor maintenance/inspection (twice a year)
Minor maintenance typically will involve the steps below, however if it appears that a spill of some type has occurred, the local hazard
control agency and Stormwater360 should be notified immediately.
Steps for Minor Maintenance/Inspection
1 Maintenance to be performed by a skilled worker familiar 6 Take notes about the external and internal condition. This
with StormFilter units. includes inspecting pit penetrations, walls, lids, ladders
and grates etc.
2 If applicable, set up safety equipment to protect
pedestrians from fall hazards presented by open access 7 Give particular attention to recording the level of
covers. Also set up appropriate safety equipment for sediment build-up on the floor of the vault and on top
work near roadways. of the internal components. If flow is occurring, note the
level of water and estimate the flow rate per drainage
3 Inspect the external condition of the unit and take notes
pipe. Record all observations.
concerning defects/problems.
8 Remove large loose debris and litter using a pole with a
4 Open the access covers to the vault and allow the system
grapple or net on the end.
to air out for 5-10 minutes.
9 Close and fasten the access cover, and remove
5 Without entering the vault, inspect the inside of the
safety equipment.
unit, including components.
10 Finally, make notes about the local drainage area relative
to ongoing construction, erosion problems, or high
loadings of other materials to the system.
In the case of a spill, workers should abort
maintenance activities until the proper guidance
has been obtained.
Stormwater360 Operations and maintenance 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.