Treated water will discharge off site via a proposed stormwater connection. The treatment plan for
the proposed development is depicted on MPN Plan 9307-DA.02 attached in Appendix 3, with
MUSIC excerpt in Figure 3.
Figure 3 – Treatment Plan
5.4.3.7 MUSIC Results
The resulting percentage-based load reductions at the outlet are shown in Table 4 below together
with the Water Quality Objectives for the receiving waters.
Residual
Sources % Reduction Target %
Load
Total Suspended Solids (kg/yr) 407 78.2 80.5 80
Total Phosporous (kg/yr) 1.08 0.307 71.8 60
Total Nitrogen (kg/yr) 9.86 4.69 48.0 45
Gross Pollutants (kg/yr) 70.7 1.54 97.8 90
Table 4 – Percentage Based Load Reduction Results
5.4.3.8 POD Pollutant Reduction
5.4.3.8.1 Litter
Rubbish bins will be located within the on-site bin store, for use by staff and visitors. The carparks
will be cleaned regularly. As a result of this and with the installation of the treatment devices, levels
of litter exiting the site via stormwater are expected to be negligible.
Excellence with Economy in Engineering 11
l:\9000-9999\9300-9399\9307\reports\20-05-22 stormwater management plan_issue a.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Item 11 Appendix E - Stormwater Management Plan-1.0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.