Council archive · source document
Item 11 Appendix E - Stormwater Management Plan-1.0 · MCU22/0094
Plans and drawings: the text below has words only, no drawings.
20 May 2022 Table of Figures Figure 1 – Proposed Development 5 Figure 2 – Site Location 6 Figure 3 – Treatment Plan 11 Table of Tables Table 1 – MUSIC Rainfall Runoff Parameters (Commercial) 9 Table 2 – Pollutant Export Parameters (Commercial) 10 Table 3 – Water Quality Objectives 10 Table 4 – Percentage Based Load Reduction Results 11 Table of Appendices Appendix 1 Architectural Plans 17 Appendix 2 Site Survey 18 Appendix 3 MPN Plans 19 Appendix 4 Bioretention Basin Maintenance Checklist 20 Excellence with Economy in Engineering 4 l:\9000-9999\9300-9399\9307\reports\20-05-22 stormwater management plan_issue a.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Item 11 Appendix E - Stormwater Management Plan-1.0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.