Decision Notice - RAL23 0009 [As Published] · RAL23/0009
Currency Period
2. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 22 September 2027
unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
Sheet 1 of 1 G 13329-PRO-01 15/08/23
4. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
5. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
Boundary Encroachments
6. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that:
a. the setback/s to any new boundaries for any existing buildings remaining on the site
complies with the relevant provisions of the planning scheme and the Building Act
1975, unless varied by this Decision Notice;
b. all utility services and connections (e.g., electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement;
c. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage Act
2002 and associated codes and requirements;
d. all dams (including ponded water, dam walls and associated spillway structures) are
wholly located within the boundaries of a single lot; and
e. all retaining walls and structures are fully contained within the lot they retain.
Services
7. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
8. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
9. Certification must be submitted to Council from all relevant service providers (Energex and
NBN) which certifies that the development has met the requirements of this Decision Notice
and all applicable legislation at the time of construction.
Easements
10. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
Page 2 of 5
Document Set ID: 22594835
Version: 2, Version Date: 25/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - RAL23 0009 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 159 KB (small file)
- File type
No other editions are linked here.