Original source · versioned page text
Decision Notice - Approved by Delegation of Authority RAL22 0003
Officer: Lisa Pienaar Direct Telephone: 07 53296514 Our Reference: RAL22/0003 Your Reference: n/a 19 August 2022 Mr KJ Kelly & Mrs VL Kelly C/- Brennan Planning Pty Ltd 44 Maple St COOROY QLD 4563 [email protected] Dear Sir/Madam, Decision Notice Planning Act 2016 I refer to your application and advise that on 17 August 2022, Council decided to approve the application, subject to conditions. Details of the decision are as follows: application details Application No: RAL22/0003 Street address: 9 Crystal St Cooroy Qld 4563 Real property description: Lot 31 C 5605 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Reconfiguring a Lot – (1 into 3 lots) and Access Easement CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions PLANNING When Conditions Must Be Complied With Unless otherwise stated, all works required by the conditions of this Decision Notice must be completed prior to submission of the subdivision plan to Council for compliance assessment. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 21-5472AA - Plan of Proposed Reconfiguration, prepared by Max Watterson & Associates 12-01-2022 All lot numbering on the subdivision plan to be submitted to Council for compliance assessment must remain as shown on the Approved Plans. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. Currency Period This development approval lapses if the requirements of the conditions have not been completed and an application for plan seal is not lodged with Council by 17 August 2026, unless an application to extend the currency period is approved by Council. Property Access and Driveways A sealed vehicle access must be constructed to each lot. The works must be undertaken in accordance with an Operational Works approval and be generally in accordance with drawings numbered 2217-02 B and 2217-03 B prepared by Callaghan and Toth dated June 2022. Vehicle access to Lot 10 is limited to the constructed driveway only. A clause must be included in the contract of sale for Lot 10 which requires vehicle access to be from the constructed driveway only, and which prohibits an alternate or second driveway from being constructed without Council agreement. A property note will be added to Council’s rates records for Lot 10. All vehicles must enter and exit the lots in a forward gear. The design of each residence must provide sufficient area for on-site manoeuvring of vehicles and provide sufficient area for vehicles to travel on the access driveway in a forward gear. A property note will be added to Council’s rates records for Lots 10, 11 and 12. Boundary Encroachments Certification must be submitted to Council from a Licensed Surveyor which certifies that: the setback/s to any new boundaries for any existing buildings remaining on the site comply with the relevant provisions of the planning scheme and the Building Act 1975, unless varied by this Decision Notice; all constructed access and roadworks (including associated fill batters and retaining walls) are fully contained within a dedicated reserve or registered easement; all utility services and connections (eg. electricity, telecommunications, water, sewerage) are wholly located within the lot they serve or alternatively included within an easement; all retaining walls and structures are fully contained within the lot they retain; any fill, including fill batters, are wholly contained within the subject site and not on adjacent properties. Street Trees The existing Cadaghi tree (an undesirable species) and palm may be removed as it will be impacted by stormwater connection. Therefore, two (2) x 45 L street trees are to be planted within the road reserve suitably located for sight lines. Species are to be in accordance with Landscaping PSP 2 in Noosa Plan. Stormwater Drainage The lots must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and be generally in accordance with drawings numbered 2217-02 B and 2217-03 B prepared by Callaghan and Toth dated June 2022 with the exception of the following: the stormwater connection to the Council drainage system must be to the existing drainage pit in the frontage of the subject site. The works must include the removal of any vegetation in the road reserve that may be impacted by the construction works. Condition 11 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk infrastructure. Services Underground reticulated electricity and telecommunication services must be provided to each lot in accordance with the standards and requirements of the relevant service provider. Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers (Energex, NBN and Unitywater) which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Easements A private inter-lot easement for stormwater purposes must be registered against the titles of the Lots 10 and 11 in favour of the upstream properties (Lots 11 and 12). The easement must be a minimum of 1.5m wide or of sufficient width to fully contain the drainage structures. An easement for access and services must be registered against the title of the Lot 12 in favour of Lots 10 and 11. The easement must be a minimum of 4.5 metres wide and be generally in accordance with the approved plans. Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks and Retaining Walls All earthworks and associated batters must be undertaken in accordance with an Operational Works approval and contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Co-ordination of Operational Works Assessment Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. Preparation of a Preliminary Construction Management Plan A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following: appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) provision for safe vehicle and pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges Sustainability In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/charges), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes property notes The following property notes will be placed against the subject property in Council’s property record system: RAL22/0003 - Property Access Driveway The following notation applies to approved lot 10: To ensure that safety and efficiency of the road network vehicle access to this lot must be from the constructed driveway only unless otherwise approved by Council (refer to Council Approval RAL22/0003) RAL22/0003 - Property Access Driveway: The following notation applies to approved lots 10, 11 and 12: Private Certifiers, owners and prospective purchasers are notified that special access and carparking requirements apply to this parcel of land. Contact Council's Planning Department for Details. (refer to Council Approval RAL22/0003). VARIATION approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Operational Works Access, Stormwater, Drainage work, Earthworks, Landscaping, Vegetation Clearing. Development Permit for Building Works Demolition/Removal submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Lisa Pienaar Development Planner Enc: Appeal Rights Infrastructure Charge Notice Approved Plans/Documents Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 5 of 6 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 6 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.