Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Appeal 26-042 - Lodgement Documents

of 276

Page text read automatically using OCR, there may be inaccuracies

20 Peregian Esplanade, Peregian Beach




 PERFORMANCE OUTCOMES                               ACCEPTABLE OUTCOMES                        PROPOSAL                                     COMPLIANCE
 Infrastructure protection                          AO10                                       A10                                          ☒Compliant
 PO10                                               No acceptable outcome provided             The proposed development can comply          ☐N/A
 Earthworks and vehicular access do not adversely                                              with this outcome.                           ☐Performance Solution
 impact on the capacity, operations and
 maintenance of existing infrastructure.

 Environmental protection                           AO11                                       A11                                          ☒Compliant
 PO11                                               No acceptable outcome provided             The proposed development can comply          ☐N/A
 Earthworks minimise any adverse impact upon                                                   with this outcome.                           ☐Performance Solution
 groundwater, watercourses, drainage lines,
 wetlands, and native vegetation.
 Dams                                               AO12.1                                     A12.1                                        ☐Compliant
 PO12                                               Where the site is in the Rural zone—       The subject site is not identified within    ☒N/A
 Dam location and construction does not impact      a)  the land has a slope of less than      the Rural zone. As such, this criterion is   ☐Performance Solution
 upon neighboring properties or road reserves,          25% (1:4);                             not applicable.
 in terms of—                                       b)  the earthworks including cut and
 a)    hydrology;                                       fill batters and retaining walls are
 b)    alteration of existing overland flow paths       setback a minimum of 50 metres
       and patterns;                                    from the property boundary; and
 c)    landslide or failure of dam wall; and        c)  the size of the lot is greater than
                                                        5 hectares.




                                                                                                                                                                    82

Log in to download the original (Appeal 26-042 - Lodgement Documents.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.