Skip to the record
Accept no imitations.

Original source · versioned page text

Appeal 26-042 - Lodgement Documents

of 276

Page text read automatically using OCR, there may be inaccuracies

20 Peregian Esplanade, Peregian Beach




4.3.2    Performance Outcomes & Acceptable Outcomes
 PERFORMANCE OUTCOMES                      ACCEPTABLE OUTCOMES                             PROPOSAL                                           COMPLIANCE
 Assessable development
 PO1                                       AO1                                             AO1
 Development near a stormwater             No acceptable outcome provided                  The proposed development is not undertaken         ☐Compliant
 drain, overland flow path or                                                              near a stormwater drain or overland flow path.     ☒N/A
 associated structure does not—                                                            As such, this criterion is not applicable.         ☐Performance Solution
 a) adversely affect the function of the
     service;
 b) place an additional load on the
     service; and
 c) unduly         increase      future
     maintenance costs.
 PO2                                       AO2.1                                           AO2.1
 Maintenance access is provided to all     For trunk infrastructure, a registered          The proposed development does not involve          ☐Compliant
 stormwater drains, overland flow paths    easement in favour of Council is created over   trunk infrastructure. As such, this criterion is   ☒N/A
 and associated structures.                all underground infrastructure located in       not applicable.                                    ☐Performance Solution
                                           private property.
                                           AO2.2                                           AO2.2                                              ☐Compliant
                                           The width of the easement required is in        The proposed development does not involve          ☒N/A
                                           accordance with Council’s Planning Scheme       trunk infrastructure. As such, this criterion is   ☐Performance Solution
                                           Policy PSP6 Engineering Design Standards –      not applicable.
                                           Roads, drainage and earthworks.
                                           AO2.3                                           AO2.3                                              ☐Compliant
                                           The easement is centred over the centreline     The proposed development does not involve          ☒N/A
                                           of the infrastructure.                          trunk infrastructure. As such, this criterion is   ☐Performance Solution
                                                                                           not applicable.




                                                                                                                                                                      84

Log in to download the original (Appeal 26-042 - Lodgement Documents.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.