Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appeal 26-042 - Lodgement Documents

of 276

Page text read automatically using OCR, there may be inaccuracies

20 Peregian Esplanade, Peregian Beach




 PURPOSE & OVERALL OUTCOMES                                        PROPOSAL                                                                 COMPLIANCE
     the use of low toxic materials, natural light and cross
     ventilation.


4.6.2    Performance Outcomes & Acceptable Outcomes
 PERFORMANCE OUTCOMES                   ACCEPTABLE OUTCOMES                              PROPOSAL                                           COMPLIANCE
 Energy efficiency
 PO1                                    AO1                                              AO1
 Development       minimises energy     No acceptable outcome provided                   The proposed development has been                  ☒Compliant
 consumption and the production of                                                       designed to minimise energy consumption            ☐N/A
 greenhouse gas emissions.                                                               and the production of greenhouse gas               ☐Performance Solution
                                                                                         emissions.

 Water efficiency and stormwater management
 PO2                                    AO2.1                                            AO2.1
 Development        maximises water     If for accommodation activities, a minimum       The proposed development does not involve          ☐Compliant
 efficiency on site by incorporating    3,000 litres of rain water storage is provided   accommodation activities. As such, this            ☒N/A
 rainwater collection and reuse         per dwelling and reused for non-potable          criterion is not applicable.                       ☐Performance Solution
 measures for non-potable purposes      purposes and incorporated into a
 such as irrigation.                    stormwater management plan for the
                                        development.
                                        AO2.2                                            AO2.2                                              ☐Compliant
                                        With the exception of accommodation              The proposed development does not seek to          ☒N/A
                                        activities, rain water storage sufficient for    change the stormwater management for the           ☐Performance Solution
                                        the intended use is captured and used            site. As such, this criterion is not applicable.
                                        on-site for non-potable purposes and
                                        incorporated        into    a    stormwater
                                        management plan for the development.




                                                                                                                                                                    100

Log in to download the original (Appeal 26-042 - Lodgement Documents.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.