Original source · versioned page text
Appeal 26-042 - Lodgement Documents
20 Peregian Esplanade, Peregian Beach PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE i) construction of any required alterations to public utility mains, services or installations; j) stormwater drainage works; and k) installation of electrical conduits. PO15 AO15 AO15 ☐Compliant Any alterations or repairs to No acceptable outcome provided The proposed development does not involve ☒N/A infrastructure as a result of the alterations or repairs to infrastructure. As ☐Performance Solution development are made at no cost to such, this criterion is not applicable. Council. PO16 AO16 AO16 ☐Compliant Road infrastructure is proven to be No acceptable outcome provided The proposed development does not involve ☒N/A suitable for its use prior to Council new roads. As such, this criterion is not ☐Performance Solution accepting the dedicated asset. applicable. Staged development PO17 AO17 AO17 ☐Compliant Staged development is planned, No acceptable outcome provided The proposed development is not a staged ☒N/A designed and constructed to ensure development. As such, this criterion is not ☐Performance Solution that— applicable. a) each stage of the development can be constructed without interruption to services and utilities provided to the previous stages; b) the infrastructure provided is capable of servicing the entire development; and c) the materials used are consistent throughout the development. 116
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appeal 26-042 - Lodgement Documents.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.