Original source · versioned page text
Appeal 26-042 - Lodgement Documents
20 Peregian Esplanade, Peregian Beach PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE equipment, material or maintenance for the site. As such, this criterion is not techniques. applicable. AO8.3 AO8.3 ☐Compliant Vegetated stormwater management The proposed development does not intend to ☒N/A systems to be dedicated as public assets are change the existing stormwater management ☐Performance Solution established and maintained during the for the site. As such, this criterion is not maintenance period to ensure optimal applicable. vegetated growth and that the functional elements of the system achieve the design function at the end of the maintenance period. PO9 AO9.1 AO9.1 ☐Compliant Treatment systems are designed to Free draining inlets and outlets are provided The proposed development does not intend to ☒N/A eliminate or minimise health, safety to ensure that waters do not pond for more change the existing stormwater management ☐Performance Solution and aesthetic hazards, including risks than 24 hours. for the site. As such, this criterion is not associated with insect breeding, odour applicable. and public safety. AO9.2 AO9.2 ☐Compliant Developments are designed to eliminate The proposed development does not intend to ☒N/A retaining walls in excess of 0.8m for any change the existing stormwater management ☐Performance Solution water quality treatment device. for the site. As such, this criterion is not applicable. Hydrology and waterway stability AO10 AO10 ☐Compliant PO10 The development is designed to: The proposed development does not intend to ☒N/A Development prevents increased bed a) limit the peak 1 year ARI event discharge change the existing stormwater management ☐Performance Solution and bank erosion and sedimentation in within the receiving waterway to the for the site. As such, this criterion is not receiving waterways by avoiding pre-development peak 1 year applicable. changes in low rate, peak flow run-off discharge; and flow duration. b) maximise pervious areas by using pervious alternatives for otherwise 129
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appeal 26-042 - Lodgement Documents.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.