Original source · versioned page text
221304-OPW-01-230327
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
LEGEND
N MARK DESCRIPTION
PROPOSED BUILDING
PROPOSED EARTHWORKS FILL
PROPOSED EARTHWORKS CUT
PROPOSED STORMWATER PIPE
PROPOSED RETAINING WALL
CUT & FILL VOLUMES + FSL 23.750 PROPOSED FINISHED SURFACE LEVEL
CUT VOLUME - 238cu.m E(OH) EXISTING OVERHEAD POWER
FILL VOLUME - 20cu.m EXISTING UNDERGROUND POWER
APPROX NET EXPORT - 218cu.m
NOTE: EARTHWORKS VOLUMES TO 300mm BELOW FFL AND + 23.750 EXISTING SURFACE LEVEL
2 PAVEMENT LEVELS. REFER STRUCTURAL & LANDSCAPE DRAWINGS EXISTING BOUNDARY
FOR DETAILS ON FOUNDATIONS AND SURFACE FINISHES
C07 S EXISTING GRAVITY SEWER
H)
E(O
)
(OH
E(OH)
+ 21.20 E
+ 21.00
+ H0.20
+ 20.20
+ H0.00
+ 20.00
+ 19.90
+ 19.80
H)
+ H0.20
+ H0.10
+ 20.60
E(O
TELE PIT
E(OH)
W
19.42 H)
+ 21.40
E(O
H)
(OH) E(OH)
S S
21.16 20.78 E(EO
S S
+ FSL 20.40S 21.17 S 20.43 + FSL 19.45 19.04
SW 18.81
19.2E(OH)
S 20.44 20.00 19.64 SW
19
19.6
19.60 SCREW
+ FSL 19.04
19.
S 20.56
19.8
SW S S 20.55 19.39
SW
0.5% 20. SW
4 0.5%
21.21 21.19 SW SW SW SW S SW S SW S SW SW 20. SW SEWER MANHOLE
21.43 2 SW + FSL 19.50
4
20
S SW SW SW SW
20.6
SW S
S
20.8
21 S S S
21.50 + + FSL 20.20
21.2
W
S
21.4
20.42 S S S
S
0.5% 20.45 20.36 S S
S
S
TW 21.70 + + H1.50 SW
SW + FSL 20.00 S S
19.41 19.04
21.24 21.17 20.49 20.35
20.27 SEWER MANHOLE
21.12 21.10 21.31 20.40 5.0% 19.48
+ FSL 19.04
E(OH)
20.54
+ FSL 20.45 Deck Level
20.49 + FSL 19.53 12.5% 18.86
W
20.28 SW Kerb Outlet
20.18
S
21.40
S
7.2%
7.2%
20.56
20.55
E(OH)
21.27
20.60 20.59
20.16 20.13
+ FSL19.49
19.60 + FSL 19.00
19.46
W
19.78 19.77
S
20.10 19.40
S
21.32 18.85
E(OH)
21.52
21.14 21.12 + FSL 20.45 + FSL 20.45 20.46 20.10 19.80
21.17 21.16 21.16 20.06
W
21.16 20.60
21.19 21.16 20.59 20.08
S
S
E(OH)
21.18 20.62
+ FSL 20.35
TW 21.70 + + H1.35 21.19
20.58 20.60
20.60 20.60 20.63
19.40
1 21.36
20.59
20.06 20.03 19.83 19.72
W
19.74
21.14
E(OH)
C07 20.60
S
S
19.70 19.49
21.50 + 21.48
21.14
20.48 19.58
FFL 20.50 20.56 20.06 19.99 19.65
18.90
21.17 21.11 FFL 20.50
W
23.25
E(OH)
Deck Level
S
S
20.60 19.73
21.11
21.11 19.64
20.58 20.01 19.74
E(OH)
W
20.08
20.59
S
+ FSL 20.35
S
20.59 20.58 20.56 20.58
+ FSL 20.30
+ FSL 20.40
20.60 20.57 20.11
20.61 20.77 20.99
19.4
20.57
19.2
19.6
20.58
19
+ FSL 20.25
FFL 20.45
19.8
20.2
TW 21.70 + +21.48 FFL20.73
20.45
20
+ H0.30
+ H0.20
20.4
+ H0.35
H1.30
E(OH)
20.6
+ H1.0
+ H0.8
+ H0.40
+ H0.10
20.8
20.57
21.50 + + FSL 20.40
W
21.19
21
21.19 20.74 20.74 20.74
21
21
S
.2
20.56
S
SW 18.95
.4
21.41 SW20.57 SW SW SW SW SW SW
20.56 20.42 SW SW SW SW
20.05 19.86 SW
20.19 +
20.74 +
20.74 +
20.57 +
20.40 +
19.11
20.20 +
20.00 +
19.85 +
E(OH)
20.74 Nail in Kerb
21.19 20.97 20.99 20.74
W
18.98
S
S
18.97
19.12
E(OH)
Letterbox
W
S
S
E(OH)
W
E(OH)
S
S
W
E(OH)
S
PROPOSED EARTHWORKS PLAN
SCALE 1:150 @ A3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.