Original source · versioned page text
Further Advice Letter Response_FINAL
MORGAN CONSULTING
E NGINEERS P TY LTD
17155
Page 2
Even with the small increase in impervious area there is likely to be no change to
the predicted pollutants generated from this maintenance shed area as there
will be a reduction in exposed hardstand and an increase in roof catchment. The
current development is conditioned to complete on going stormwater quality
monitoring where this will be confirmed.
Furthermore, the proposed car wash bay will be bunded and located undercover
preventing any stormwater runoff from this wash down area making its way into
the downstream existing drainage system.
Based on our assessment of the stormwater quantity and quality management of
the amended Site Maintenance Shed, we can confirm there will be no change to
the existing stormwater drainage system as a result of the minor change request.
Please contact me if you have any further queries on (07) 3369 8411.
Yours faithfully,
MORGAN CONSULTING ENGINEERS PTY LTD
Henry Morgan
Director RPEQ 11950
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.