20225-1072 (5) External Works - Entry Pathway
15
SHEET LEGEND
2C 16
CODE DESCRIPTION
E.LB LIGHTING: BOLLARD FIXTURE. REFER ELEC. ENG.
2C H.SP STORMWATER: PIT - REFER CIVIL ENG
DOCUMENTATION
HR3 HANDRAIL TYPE 3 - REFER TO SCHEDULES
PWY PATHWAY - REFER FINISHES SCHEDULE
PLANTER AND LINE
MARKING UPDATE
5 RWP RAINWATER PIT - REFER CIVIL AND HYDRAULIC ENG.
DOCS
TL TILE FINISH - REFER TO SCHEDULES
X.BOL2 SQUARE BOLLARD - REFER TO SCHEDULES
FFL 5.200
SFL 5.185
WALKWAY
5218
X.BOL2
TL
FFL 5.245
SFL 5.230 NOTE: STEP RAMP RAILING TO COMPLY WITH
HAND RAIL AND KERB RAIL REQUIREMENTS
AS PER AS1428.1
AS1428.1 TILE EDGE
WALKWAY
X.BOL2
1900
DIMINISHING STRIP 2B 40mm GALVANISED 40mm GALVANISED
1:22
1914
STEEL PIPE, PAINT STEEL PIPE, PAINT
RWP FINISH "DULUX - FINISH "DULUX -
BROWN EARTH" BROWN EARTH"
E.LB
2B
SFL 5.145
SFL 5.190
LANDING
PWY
2235
OUTLINE OF TANK
1515 BELOW
CLEAR
SFL 5.145
CONCRETE
DOWNTURN. REFER H.SP
HANDRAIL WITH PLANTER
CIVIL ENGINEER
STEP RAMP
OPEN BALUSTRADE
1:10
DOCUMENTATION 40mm GALVANISED
AND KERB RAIL.
1900
STEEL PIPE, PAINT
HR3 HR3 HANDRAILS TO TURN FINISH "DULUX -
TO GROUND AS PER BROWN EARTH
3010 NO HANDRAIL ALONG WALKWAY AS1428.
1000 MAX
2A
900
RL 4.955
LANDING
1845 1600 1845
2A
1580
FLAT FLAT
H.SP 1:21
3.715° PWY
RL 4.879
E.LB 40
HR3 HR3 100x10 ALUMINIUM 100x10 ALUMINIUM
HANDRAIL WITH
FLAT BAR, PAINTED FLAT BAR, PAINTED
STEP RAMP
OPEN BALUSTRADE
1:10
"DULUX - BROWN "DULUX - BROWN
1900
AND KERB RAIL. EARTH". WELDED TO EARTH". WELDED TO
HANDRAILS TO TURN RL 4.553 STEEL PIPE. STEEL PIPE.
TO GROUND AS PER
AS1428. 120
CENTERLINE
RL 4.689
LANDING (1:40 CROSS FALL)FLAT
150 min
147
80
160
1730
CLEAR
65 MAX
60
RL 4.689 RL 4.515 FFL
2064
RL 4.510
RL 4.639
15 16
165
1845 NOM
DETAIL SECTION DETAIL ELEVATION
PLAN ENTRY PATHWAY - CARPARK HANDRAIL 3 (HR3) - ENTRY PATHWAY
1 Scale: 1 : 50 2 SCALE 1 : 5
REV DESCRIPTION AUTH CHK DATE DRAWN CHECKED
14/04/2025 10:16:45 AM
• These designs and plans are the copyright of MODE DESIGN STATUS CLIENT BRISBANE PROJECT DRAWING TITLE
1 CONSTRUCTION UPDATE AI DK 04.12.24 Corp. Pty Ltd and cannot be reproduced without written Plaza Level, Mosaic AI DK
2 SITE PLAN UPDATE AI DK 22.01.25 permission.
FOR CONSTRUCTION 826 Ann St NOOSA APARTMENT EXTERNAL WORKS - ENTRY ISSUE
14/04/2025 10:16:45 AM
SCALE @ A1
As indicated
• Verify all dimensions on site prior to commencement of work. Fortitude Valley QLD 4006
3 ENTRY PATHWAY UPDATE
4 ENTRY PATHWAY UPDATE
AI
AI
DK
DK
02.04.25
08.04.25 • DO NOT scale off these drawings. T +61 7 3253 9900 PATHWAY PROJECT No STAGE DRAWING No REVISION
• Report any discrepancies to the architect before carrying out any [email protected]
CD
5 UPPER CARPARK UPDATE AI DK 14.04.25
work. ABN: 65 112 807 931 57 HOFMANN DRIVE, NOOSAVILLE 20225 AR-1072 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.