2016-13 Noosa Chocolate Issue Za Wds Part 1
Attached to the e-mail MCU16/0098 & OPW16/0183 - Request to change existing approval - 21 Venture Drive NOOSAVILLE.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
TRIMDEK ROOF [email protected] TRIMDEK ROOF [email protected]
30mm TRIMDEK ROOF SHEET, DEGREES PITCH 30mm TRIMDEK ROOF SHEET, DEGREES PITCH
40mm ROOF BATTENS & 245mm DEEP RAFTERS 40mm ROOF BATTENS & 245mm DEEP RAFTERS
AS A GUIDE - TO BE CONFIMED BY ENGINEERS AS A GUIDE - TO BE CONFIMED BY ENGINEERS
DETAILS DETAILS 1
12
LIGHT WEIGHT WALL - FIRE RATED
60/60/60
REFER TO DETAIL1 ON SHEET 12
ED ON THE RAKE
CEILING LIN FOR SPECIFICATIONS
[email protected] [email protected]
3230 HIGH HIGH
CEILING HEIGHT
4000
JOINERY HEIGHT
TOP OF PARAPET WALL
TOP OF PARAPET WALL
PITCHING HEIGHT TO UNDERSIDE
2400
PITCHING HEIGHT TO UNDERSIDE
RAISED UPPER
8500
8500
2
CARETAKERS FLOOR LEVEL
12
OF RAFTERS
SUSPENDED CEILING @ SUSPENDED [email protected] FFL
UNIT
OF RAFTERS
7300
7300
4.2m HIGH 4.2m HIGH MEZZANINE
600
4.8m HIGH x 4.2m WIDE 27.1m2 UPPER FLOOR LEVEL 10.25 FFL
ROLLER DOOR
300
FLOOR FRAME TO
ENGINEERS DETAILS 900mm WIDE
BULKHEAD FOR INDICATES TIMBER
PLUMBING FROM
ENTRY DOOR JOINERY HEIGHT
900 FRAMED CEILING
UNDERSIDE OF RAFTERS
PITCHING HEIGHT MIN TO
LEVEL ABOVE STRUCTURE ABOVE
CEILING HEIGHT
GLASS
VIEWING TO ENGINEERS
PLASTIC
3000
3000
AREA PROPOSED DETAILS
2700
2700
CURTAIN KITCHEN , CAFE &
RETAIL AREA
PROPOSED PAVED
COVERED SEATING
BUILDING FLOOR LEVEL 6.95 FFL BUILDING FLOOR LEVEL 6.95 FFL
AREA
CEILING FOR CAFE & RETAIL SLAB & FOOTINGS TO ENGINEERS DETAILS LIGHT WEIGHT STUD INFILL
AREA & UNDER CARETAKERS PANEL TO ENGINEERS DETAILS.
UNIT ABOVE TO COMPLY WITH FC BLUE BOARD CLADDING WITH
2016 NCC PART C2.9 (B) REFER 4500 SELECT RENDERED FINISH
SLAB & FOOTINGS TO ENGINEERS DETAILS TO DETAIL 2 ON SHEET 12 FOR
SPECIFICATIONS
SECTION D-D TRIMDEK ROOF [email protected]
SECTION E-E
750
SCALE: 1:100 @ A3 OR SCALE: 1:100 @ A3 OR
1:50 @ A1 4 DEGREES PITCH 30mm TRIMDEK ROOF SHEET,
40mm ROOF BATTENS & 245mm DEEP RAFTERS
AS A GUIDE - TO BE CONFIMED BY ENGINEERS 1:50 @ A1 4
DETAILS
450 3600 450
450 100 3400 0 100 450
180
ENGINEERS TO NOTE*** DESIGNER
3150
HAS ONLY ALLOWED FOR ROOF
PURLINS TO RUN THROUGH STAIR
[email protected] HIGH
2400
[email protected]
2400
AREA. NO RAFTERS ABOVE STAIR AS
2400
HIGH MIN OF 2.1m HEAD HEIGHT IS
REQUIRED ABOVE TOP TREAD OF 17
LIGHT WEIGHT WALL - FIRE RATED 00
STAIR.
90/90/90 780 1840 780
REFER TO DETAIL ON SHEET 11 FOR
CEILING HEIGHT
SPECIFICATIONS
JOINERY HEIGHT
4000
CEILING LINED ON THE RAKE
3800
3800 HIGH x 5125 LONG x 2100 HIGH x 1100 WIDE
JOINERY HEIGHT
950 W IDE AT TOP OPENING IN FIRE RATED
TOP OF PARAPET WALL
PITCHING HEIGHT TO UNDERSIDE
WALL AT TOP OF STAIRS
2400
FIXED GLASS ANGLED W INDOW
2100
(3.8m JOINERY HEAD HEIGHT)
8500
OF RAFTERS
18 [email protected]
17 TREADS @ 250mm WIDE SUSPENDED 1217 113 1840 113 1217
7300
CEILING @
UPPER FLOOR LEVEL 10.25 FFL TEA ROOM 4.2m HIGH
2066
300
SECTION G-G
SCALE: 1:50 @ A3 OR
FLOOR FRAME TO
4
ENTRY DOOR JOINERY HEIGHT
ENGINEERS DETAILS 1800 HIGH x 3175 LONG x
1:25 @ A1
CEILING HEIGHT
450 W IDE AT TOP
GAS STRUT AW NING W INDOW
3000
2700
ANGLED
KITCHEN JOINERY
ZA 19.06.17 FEATURE ENTRY ADDED SB DJ
(2.7m JOINERY HEAD HEIGHT) Z
Y
13.06.17
09.06.17
TILT PANELS ADDED
ENTRY ALTERED
SB
SB
DJ
DJ Drawn by SB Checked byDJ
HEIGHT
1800
X 29.05.17 LOGO ALTERED SB DJ
W 23.05.17 CLIENTS CHANGES SB DJ
U-V
S-T
20.04.17
15.03.17
CLIENTS CHANGES
PRELIM. WORKING DWGS
SB
SB
DJ
DJ Client NOOSA CHOCOLATE FACTORY
PROPOSED CAFE MIN FRL 90/90/90 R
Q
14.12.16
11.09.16
FACTORY FLOOR PLAN ADDED
ELEVATION & SECTION ADDED
SB
SB
DJ
DJ
AREA BUILDING FLOOR LEVEL 6.95 FFL P
O
N
24.08.16
19.08.16
21.07.16
ENGINEERS DETAILS ADDED
LANDSCAPE PLAN ADDED
3D VIEWS
SB
SB
SB
DJ
DJ
DJ
LOT 9 VENTURE DRIVE,
M
L
K
19.07.16
20.06.16
17.06.16
CHANGES TO SITE PLAN
OPTION 2
DEBBIES CHANGES
SB
SB
SB
DJ
DJ
DJ
NOOSAVILLE, QLD
J 16.06.16 ENGINEERS / CLIENTS CHANGES SB DJ
I 13.06.16 SURVEY ADDED SB DJ
CEILING FOR CAFE & RETAIL H
G
25.05.16
24.05.16
DEBBIES CHANGES
DEBBIES CHANGES
SB
SB
DJ
DJ
SLAB & FOOTINGS TO ENGINEERS DETAILS AREA & UNDER CARETAKERS F
E
16.05.16
12.05.16
CLIENTS CHANGES
ADDED CARETAKERS
SB
SB
DJ
DJ
UNIT ABOVE TO COMPLY WITH ISSUE
A-D 08.03.16
DATE
SKETCH DWGS ISSUED
SUBJECT INITIAL
SB DJ