Skip to the record
Beware of cheap imitations.

Council archive · source document

Response to 2nd Council Information Request · MCU22/0118

of 17

Text shows just the words. Original shows the document exactly as it was published.

 “Adamson Town Planning, specialising in providing higher order town planning advice”




Both of these zones provide for specific planting to prevent further tree removal and to provide
bushfire mitigation for the development, as detailed in the further advice provided by the
bushfire expert (refer Attachments 7A & 7B). Further, Consult Arborist has explained that
RACV has a continuing tree management plan in place that has been ongoing for an extended
period of time for the existing resort, which will be extended to include the proposd
development (refer Attachment 3).

The intent for this part of the resort is to provide a different visitor accommodation experience,
when compared to the existing resort, with the development integrated within the site. This
will come at higher maintenance and management cost, which is expected and accepted by
the applicant. It is suggested that in the circumstances, RACV is the only operator capable of
achieving this outcome, with minimal site disturbance, with some of the development also
extending into the existing RAVC Resort.

Information Required

13. Demonstrate compliance with PO6 of the Bushfire Hazard Overlay Code

The proposed development does not provide for any new roads with the existing access being
utilised to access the site. The land will be amalgamated, and the existing access easement
extinguished. Consequently, the performance outcome PO6 is not relevant to the assessment.

Despite this, Mr Friend has addressed this issue in the further bushfire advice provided (refer
Attachment 7B), including:
   • No vehicle accessible fire breaks being required or proposed;
   • All emergency services will use the existing access roads;
   • Safe access and egress will be in accordance with the Emergency Response Plan for
       RACV; and
   • Hydrant stand pipes to be provided as required, with all infrastructure to be suspended
       under the proposed boardwalk.

The proposed development is able to comply with the required bushfire mitigation
requirements without adversely impacting on the environmental values and will be designed
in this manner, consistent with performance outcome PO2. Further, can provide an adequate
water supply for firefighting purposes, which is reliable, safely located and freely accessible
consistent with performance outcome PO3. The site provides for easy and safe evacuation of
residents and access for emergency services to Noosa Drive and internally to the existing RACV
Resort, consistent with performance outcome PO6.

Information Required

14. Provide amended plans complying with the maximum 8m height limit.




                                                                                        14 | P a g e
18006 – RACV Noosa Resort, July 2023

Used in these records

About this file

File size
740 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to 2nd Council Information Request.pdf · 740 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.