Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix E - Integrated Water Management Plan

Attached to the e-mail Multiple Housing Type 3 Retirement & Special Needs (48 units) - MCU18/0009.

of 53

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

                                                                                 Callaghan & Toth


4.2.3 Rainfall Data

The meteorological data used for the MUSIC Model was the data for Cooroy from 01/01/73 –
31/12/82.

The mean Annual Rainfall for Cooroy                     1973 – 1982 = 1600mm


The MUSIC Modelling Guidelines for South East Queensland – Version 1 December 2010
details that Cooroy data for 1973 to 1983 should be used.

4.3      MUSIC Modelling Results

The MUSIC modelling program has been used to investigate the performance of various
treatment options in the treatment train. MUSIC version 6.2.1 is the current version and capable
of incorporating rainwater re-use in the model. These features have been used in making
comparisons between different stormwater management systems for this report.


4.3.1 Water Quality Objectives

This model meets the pollution load reduction target as detailed in the State Planning Policy
2017 (Appendix 2: Table B). The following have been included in Appendix B.

         •       The treatment train effectiveness for the system.
         •       The MUSIC Version 6.2.1 Summary Report.

The information above indicates that the new Villas, Café and associated carpark and
landscaping with the proposed stormwater treatment train will achieve reductions in pollutant
loads as detailed in Table 4.2 below.

         TABLE 4.2:          COMPARISON OF LOAD REDUCTIONS

              Parameter                        MUSIC          POLLUTANT LOAD
                                             REDUCTION           REDUCTION
                                              RESULT              TARGETS
                                                              (Source: SPP 2017)
              Flow                              17%
              Total Suspended Solids           79.8%                 80%
              Total Phosphorous                59.6%                 60%
              Total Nitrogen                    52%                  45%
              Gross Pollutants >5mm            100%                  90%




                                                                                                12
1714-Cartwrigth Village Extension_IWMP.doc                                     January 2018
Log in to download the original file

Appendix E - Integrated Water Management Plan.pdf · 6.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.