Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Appendix E - Integrated Water Management Plan

Attached to the e-mail Multiple Housing Type 3 Retirement & Special Needs (48 units) - MCU18/0009.

of 53

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 26, section 1. The text section number identifies this passage in the reader.

                   CARTWRIGHT VILLAGE EXTENSION AT CARRAMAR
                        COOROY – NOOSA ROAD, TEWANTIN

            PRELIMINARY DESIGN OF STORMWATER DETENTION VOLUME

                       REPORT COMPILED FOR NOOSA CARE INC
                  BY BRISBANE STORMWATER MANAGEMENT PTY LTD



DOCUMENT CONTROL

BSM Job No: 2017-11

 Doc Filename        Status           Format          Issued To                         Date
 Carramar.Doc        Draft            Pdf             Callaghan & Toth P/L              19/12/17
                                                      BSM-Office                        19/12/17
 Carramar.Doc        Final            Pdf             Callaghan & Toth P/L              21/12/17
                                                                                        21/12/17



COPYRIGHT

This report is confidential and is proprietary to Brisbane Stormwater Management Pty Ltd and their
client Noosa Care Inc. The report is provided to Noosa Care Inc’s civil consultant Callaghan & Toth Pty
Ltd and to Noosa Council for the purpose of defining a stormwater detention basin that will mitigate the
increased stormwater runoff rates from the proposed extension of Cartwright Village at Carramar, on
the Cooroy-Noosa Roadd at Tewantin. It may not be used by any other party or for any other purpose
whatsoever without the written permission of both Brisbane Stormwater Management Pty Ltd and
Noosa Care Inc.

Brisbane Stormwater Management Pty Ltd and Noosa care Inc will not accept any responsibility for any
losses suffered by any other party as a result of the unauthorised use of this report.



CERTIFICATION

I hereby certify that the stormwater detention volume defined in this report has been designed by
industry-standard procedures and that the Noosa Council can rely on the design details described herein
during their consideration of the relevant matters for approval.




………………………………………………
Denis Ogle, RPEQ 2405, 21 December 2017
Director, Brisbane Stormwater Management P/L
92 Alkoomie St, PO Box 8119, Wynnum Nth, Q4178
Ph (07)33963383, Email: [email protected]

                                                                                                 Page 1
   Brisbane Stormwater Management Pty Ltd Document File: Carramar.Doc
Log in to download the original file

Appendix E - Integrated Water Management Plan.pdf · 6.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.